Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on April 13, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Base Pool Sand Filter Replacement

Closed
FA4887-16-T-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

333318 - Other Commercial and Service Industry Machinery Manufacturing

Place of Performance

14100 W Eagle Street Luke AFB, AZ 85309-1217, LUKE AFB, AZ, 85309-1217, USA

Set-Aside

SBA

Documents

2

Solicitation.doc

DOC

SOW_Remove_%26_Replace_Pool_Sand_Filter.doc

DOC

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4887 56 Cons Cc
Contacts2 people available
OfficeLUKE AFB, AZ, 85309-1217, USA
Office AddressLUKE AFB, AZ, 85309-1217, USA
Contacts
Joshua WoleryBase Operations Contracts Manager

Full Description

Show more
This requirement is to replace the sand filter at the Luke AFB swimming pool. Please see attachments for more information. A Site Visit will be held at Luke AFB on Thursday, April 7 2016 at 8:00AM MST. All parties interested in attending MUST email SrA Ryan Shappell at ryan.shappell@us.af.mil with a list of attendees no later than April 6 2016 at 2:00PM MST. All attendees must bring two forms of valid identification, and proof of insurance and current registration for vehicles. All attendees will meet at the South Gate Visitor's Center of Luke AFB by 7:45AM MST. Immediately after attendees are vetted for base access, we will head to the base swimming pool for the Site Visit.

More opportunities from Department Of Defense → FA4887 56 Cons Cc

Same awarding agency

NAICS: 335921
New
Federal
56 CS FOC to Flightline and Wx Equipment, Luke AFB
Solicitation # F3YCFA6173AC01
This firm-fixed-price solicitation, number F3YCFA6173AC01, is a 100 percent Small Business set-aside under NAICS 335921 for the engineering, furnishing, installation, and testing of new 12-strand single-mode fiber optic cable at Luke Air Force Base, Arizona. The project involves connecting Radar Approach Control to several critical facilities, including the Air Traffic Control Tower, Base Operations, Command Post, and various flightline and weather equipment such as Localizers, Glide Slopes, TACAN, and GATR, as well as meteorological stations. The installation will utilize a combination of existing manhole and handhole duct systems and direct burial. The contractor is responsible for providing all new, rust-proof, and corrosion-resistant materials, labor, and supervision, as no government-furnished equipment will be provided. The period of performance is not to exceed 180 calendar days, with a requested delivery date of July 1, 2027. Award will be granted to the responsible vendor with the lowest priced, technically acceptable quote, evaluated based on design, a quality control plan, and performance history via the Supplier Performance Risk System. Technical teams must be certified to EFI&T TC Comm FOTS, and supervisors must hold factory certification from equipment manufacturers. All work must comply with strict environmental guidelines regarding hazardous materials and lead-based paint, and personnel must adhere to Department of the Air Force security and base access protocols. Final acceptance is contingent upon successful OTDR and Optical Power Meter testing in accordance with TIA 526-7 and a final project walk-through.
Fiber Optic Cable Manufacturing

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS