Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Base Year - Lower Payette River Stream Gage Rating Services w/ Idaho Power Corporation (between Horseshoe Bend and Black Canyon) HydroMet

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves providing stream gage rating services for the Lower Payette River between Horseshoe Bend and Black Canyon in collaboration with Idaho Power Corporation. This work is scheduled as a base year agreement under a small business set-aside, emphasizing opportunities for small enterprises. The contract falls under the NAICS code 541360, which pertains to geophysical surveying and mapping services, and is managed by the U.S. Bureau of Reclamation, a component of the Department of the Interior. Key responsibilities include assessing and maintaining hydrological data accuracy to support river management and infrastructure operations. The contract was forecasted on December 22, 2025, and the main point of contact for all inquiries is Kristal Jones, who serves both as a general and small business specialist for the project. The location details for performance are unspecified, but the focus is clearly on the Lower Payette River area within Idaho.

General Info

Provide stream gage rating services for Lower Payette River under small business set-aside with Idaho Power.

Agency

Department of the Interior → U.S. Bureau of Reclamation

NAICS

541360 - Geophysical Surveying and Mapping ServicesView NAICS

Place of Performance

WA, US

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of the Interior → U.S. Bureau of Reclamation
Contacts2 people available
OfficeN/A
Organization / Agency
Department of the Interior → U.S. Bureau of Reclamation
Office AddressN/A
Contacts
Kristal Jones
Kristal Jones

Full Description

Show more
Base Year - Lower Payette River Stream Gage Rating Services w/ Idaho Power Corporation (between Horseshoe Bend and Black Canyon) HydroMet

Similar Contracts

Same NAICS industry code

NAICS: 541360
New
SLED
Geotechnical Borings by San Diego Unified Port District for Tenth Avenue Marine Terminal Redevelopment at Tenth Avenue Marine TerminalThe San Diego Unified Port District plans to conduct geotechnical investigations at the Tenth Avenue Marine Terminal in San Diego, California, to support future redevelopment efforts. The work will include approximately five mud rotary borings to depths of 60 to 150 feet with diameters of 3 to 8 inches, ten hollow stem auger borings to depths of 10 to 30 feet with an 8-inch diameter, and twenty-five cone penetration tests extending 60 to 150 feet deep with a 3-inch diameter. Soil samples and drilling mud will be collected and temporarily stored in 55-gallon drums at a designated staging area near the Harborside delivery waiting area for up to 60 days before being transported offsite for laboratory analysis. All boreholes will be properly sealed upon completion using cement-bentonite grout and restored to match existing surface conditions. Drilling operations may span multiple days at certain locations, with steel plates used to cover open holes between shifts and equipment staged overnight in areas that do not disrupt port operations. The project is scheduled to begin in mid-2026 and is expected to take about 30 days to complete the field geotechnical work. Equipment will include a truck-mounted hollow stem auger drill rig with mud rotary capabilities, a CPT truck, support vehicles, and other specialized geotechnical tools. Due to the limited scale of the activity, the project is not expected to generate significant vehicle trips or cause notable impacts to air quality, greenhouse gas emissions, or local traffic. The Port District will ensure full compliance with all federal, state, and local regulations concerning hazardous materials, construction debris removal, and stormwater management. The work is being coordinated by the Port’s Capital Project Manager and Planner I, with contact information publicly listed for inquiries related to the project.
San Diego Unified Port District

POSTED

3 days ago

DEADLINE

N/A
View Details