Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on August 10, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BEAVERHEAD-DEERLODGE NATIONAL FOREST: Stone Lake Trail Construction & Reconditioning

Awarded
AG-0356-S-12-0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 13 hours ago

DEADLINE

in 11 days
NAICS: 237990
New
SLED
Seaview Vehicular Beach Access Ramp Reconstruction Project
Solicitation # 26-B-128CW
The Seaview Vehicular Beach Access Ramp Reconstruction Project, solicitation number 26-B-128CW, is an invitation for bid issued by the County of Volusia to reconstruct a beach access ramp in a residential section of Daytona Beach that was destroyed by Hurricane Ian in 2022. The project scope includes the demolition of storm-damaged infrastructure and the installation of a reinforced concrete vehicular ramp, a pedestrian sidewalk, a concrete cap, and composite sheet pile seawall panels and retaining walls. Additional site improvements include FDOT Type D curbing, an on-beach shower, pavement markings, signage, and full site restoration. The estimated construction cost is 1,213,413.00 dollars, with a total contract performance period of 150 days following the Notice to Proceed. Bids are due electronically via the OpenGov Procurement portal by November 5, 2026, at 3:01 pm, and will be awarded to the single lowest responsive and responsible respondent. The contractor must comply with various regulatory requirements, including permits from the FDEP, USACE, and U.S. Fish and Wildlife Service, as well as the Habitat Conservation Plan for the Protection of Sea Turtles. Mandatory requirements include the provision of payment and performance bonds, comprehensive insurance coverage, and adherence to federal contract provisions such as the Davis-Bacon Act and Equal Employment Opportunity standards. Payments are generally made within 30 days of receipt of an undisputed invoice, with specific sales tax exemption procedures in place for materials.
Coastal

POSTED

about 15 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The Stone Lake Trail Construction and Reconditioning project focuses on the Doolittle Trail Number 3090 within the Beaverhead-Deerlodge National Forest in Montana. The primary goals are to enhance rider safety, eliminate motorized use on old paths, and mitigate erosion. The scope of work involves the new construction of nearly two miles of motorcycle trail and the obliteration of over one mile of existing trail. Specific tasks include clearing and grubbing, excavation, installing drainage structures, placing signs and bulletin boards, and performing general trail maintenance and stake refreshing. This project is managed by the Department of Agriculture under the Custer Gallatin National Forest. It is structured as a Firm-Fixed Price contract with an estimated price range between 25,000 and 100,000 dollars. The work is located approximately ten air miles northwest of Wisdom, Montana, with the trailhead accessible via Forest Roads 2421, 2422, and 2423.

General Info

Contract Value

$22,147.04

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Beaverhead-Deerlodge National Forest Wisdom and Wise River Ranger Districts, DILLON, MT, 59725, USA

Set-Aside

NONE

Award Issued Date

Documents

5

Stone Lake Project Drawings and Specifications

PDF, High priority: read this firstspecifications
High

AG-0356-S-12-0011-0001.pdf

PDF

AG-0356-S-12-0011-0002.pdf

PDF

AG-0356-S-12-0011.pdf

PDF

Stone-Lake-Specifications.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from May 25, 2012 to Jul 5, 2012. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Custer Gallatin National Forest
Contacts2 people available
OfficeBOZEMAN, MT, 59715, USA
Office AddressBOZEMAN, MT, 59715, USA
Contacts
Alane M FitzpatrickContract Specialist
Alisha KnaubPurchasing Agent

Full Description

Show more
Project Title: Stone Lake Trail Construction & Reconditioning, located on the Wisdom and Wise River Ranger Districts of the Beaverhead-Deerlodge National Forest. Description of Work: The project includes the construction and reconditioning of the main access trail to Stone Lake, the Doolittle Trail Number 3090. Included in the work is obliterating over one mile of work, and new construction of nearly two miles of motorcycle trail in the West Pioneer Mountain Range. Construction items include clearing and grubbing, excavation, turns, drainage structures, trail obliteration, sign and bulletin board installation, and routine trail maintenance work. Stake refreshing and cleanup are required in this contract. The main objective of this project is to create a safe riding environment with the new construction, to close the old trail to motorized use, and to reduce erosion on the existing trail. Project Location: Doolittle Creek Trail Number 3090 is located approximately 10 air miles northwest of the town of Wisdom, Montana. The trail begins in Section 35 of T. 1 S., R 14 W. To get to this project, take the Doolittle Road at mile marker 36 on Hwy. 43 north of Wisdom and drive up Forest Road 2421. At the first main junction of Forest Road 2421, turn left onto Forest Road 2422; at the second main junction turn right onto Forest Road 2423. The road is easily passable in a two-wheel drive vehicle. The trailhead is 7.2 miles from Highway 43. No pre-bid tour will be conducted. A Firm-Fixed Price contract is expected to result from this solicitation. Price range: $25,000 to $100,000. Interested bidders may contact Kendra Bull at the Beaverhead-Deerlodge National Forest Supervisor's Office +1 (555) 000-0000. The solicitation will be available on approximately 25 April 2012, and can be downloaded from this website at that time.

More opportunities from Department Of Agriculture → Custer Gallatin National Forest

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS