Bell Canyon Reservoir 3 and Creek Pipeline Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Ventura County Waterworks District No. 17 is forecasting the planning and design phase for the Bell Canyon Reservoir 3 and Creek Pipeline Replacement project, which includes the development of a new 1.5-million-gallon reservoir and the upgrades to associated water pipelines to enhance system reliability and redundancy. This phase is strictly confined to engineering studies, environmental evaluations, and design documentation, with construction and implementation intentionally excluded and slated for a separate future project that will undergo its own CEQA analysis. The work will be performed in the 91307 zip code area of California, with the primary point of contact being Homer Arredondo, Senior Engineering Manager, who can be reached via email or phone provided for inquiry and coordination. The contract was posted on August 3, 2026, under the agency’s procurement portal, and no solicitation number or set-aside classification has been assigned at this forecast stage.
General Info
Agency
NAICS
Place of Performance
CA, 91307Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
