Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bella House Kitchen and Bathroom Rehab

Closed
PW 26-25State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a Total Small Business Set-Aside for the interior modernization of Building 262, as well as associated buildings 261 and 263, at the Federal Law Enforcement Training Center in Glynco, Georgia. This firm-fixed-price contract involves a comprehensive scope of work including the replacement of corridor and classroom flooring with composite modular materials, full restroom renovations involving new vanities and lavatories, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional technical requirements include upgrading lighting to simple dimming controls, replacing ceiling fans, updating doors and life-safety components, and replacing variable air volume systems and HVAC controls. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Proposals are due by November 18, 2026, and will be evaluated based on price, past performance, and corporate relevant experience. Awardees must provide payment and performance bonds, and bidders are required to furnish a bid guarantee of 20 percent of the bid price or 3 million dollars. The project mandates strict adherence to ADA accessibility guidelines, the FLETC Hazardous Waste Management Plan, and prevailing wage rates as specified in Wage Determination GA20260315. Personnel must undergo background checks and security clearances to access the facility.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price construction project for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, exterior wall systems, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, and compressed air systems. Additionally, the project requires a full NFPA-compliant fire suppression system, replacement of electrical distribution, lighting, low-voltage systems, and building automation controls. Site improvements encompass paving removal and replacement, drainage upgrades, and repairs to water, sanitary, and storm systems, alongside hazardous materials abatement. The estimated contract value ranges between 10 million and 25 million dollars, with a performance period of 730 days after award. Bidders must provide pricing for two primary exhibit line items: building renovation and paving work. Award is based on the lowest price, with specific evaluations for Buy American Act compliance. Key requirements include a comprehensive Contractor Quality Control Plan, adherence to Davis-Bacon Act wage determinations, and tiered bonding requirements based on proposal value. Deliverables include technical shop drawings, O&M manuals, and a 20-year no dollar limit warranty for specific roofing materials and labor. Responses are due by November 23, 2026.
Bristol Alliance of Companies

POSTED

about 8 hours ago

DEADLINE

in 23 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under NAICS code 236220. The solicitation was posted on October 31, 2026, with a response deadline of November 4, 2026. The primary point of contact for this effort is Richie Tran. To ensure project financing and bid responsiveness, contractors must strictly adhere to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements that expand upon State Water Resources Control Board standards. Critical requirements include posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must utilize the services of the Small Business Administration and the Minority Business Development Agency. Proof of these specific public notifications and agency utilizations must be submitted within the bid package, or the proposal will be deemed non-responsive. Other requirements include active outreach and recruitment of DBEs, with documentation for these efforts permitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 3 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site work is required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of scopes, ranging from demolition, abatement, and structural steel to mechanical, electrical, plumbing, and crane services. Interested parties should contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected before the November 30, 2026, deadline.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in 29 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement, painting, ceiling tile and drywall ceiling repair, rubber wall base installation, flooring replacement, and the replacement of vanities and cabinets, as well as necessary electrical work. All restoration must use like materials and comply with ADA, OSHA, EPA, and NFPA-101 life safety codes, as well as local Massachusetts building ordinances. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown for labor, materials, and equipment, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts contractor's license, and certification of compliance with the latest area wage rate decisions. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour for covered workers and the provision of paid sick leave. Contractors must maintain automobile liability insurance with minimum coverage of 200,000 dollars per person and 500,000 dollars per occurrence, naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30. The acceptance process involves a substantial completion walk-through and a final inspection, with a requirement that punch list items be corrected within 14 days.
Grafton Job Corps

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring interior spaces damaged by water intrusion to return them to safe residential use. The scope of work includes repairs to sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms, specifically involving drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in the mechanical room. The contractor is responsible for providing all labor, materials, equipment, and supervision, and must ensure the protection of the occupied building and the coordination of service interruptions. This solicitation is set aside for Small Businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposals must include detailed relevant experience, a comprehensive work plan with phasing and timelines, and itemized pricing by room and trade. Awardees must provide payment and performance bonding for the full project value within ten days of award, as well as proof of general liability insurance with minimum coverage of 1 million dollars per occurrence and 3 million dollars general aggregate. A minimum one-year workmanship warranty is required upon final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 8 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The County of Napa has issued solicitation PW 26-25 for tenant improvements at the Bella House Social Rehabilitation Facility, a mental health residential program for adults. With an engineer's estimate of 160,000 dollars, the project involves the demolition and replacement of kitchen and restroom equipment, fixtures, casework, and flooring, as well as interior painting and a facility-wide upgrade to LED lighting. Work is scheduled to begin on January 11, 2027, and must be completed within 40 working days. Because the facility will remain occupied during construction, the contractor must coordinate closely with staff and ensure that only one restroom is out of service at any given time to minimize resident disruption. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class B license and DIR registration. Qualified bidders must demonstrate the successful completion of at least three similar government capital improvement projects within the last five years, including at least one project performed in an occupied facility. Submission requirements include a bid guarantee not exceeding 10 percent of the total bid, delivered physically to the Public Works Department, while the proposal itself must be submitted via the OpenGov portal by October 6, 2026. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price, adhere to California prevailing wage rates, and ensure all personnel sign confidentiality agreements before entering the premises.

General Info

Napa County tenant improvements at Bella House, $160,000 budget, starting January 11, 2027.

Documents

14
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstq-and-a
High
PDF, High priority: read this first2 pages · bid-bond-form
High
DOCX, High priority: read this firstcontract-document
High
DOCX, High priority: read this first2 pages · bond-document
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeNapa, CA, 94559, USA
Organization / AgencyCalifornia → Public Works
Office AddressNapa, CA, 94559, USA
Contacts
Roberto De La Torre RealJunior Engineer

Interested Companies (41)

Shvets BuildersRocklin, CA
Deyan DinevConcord, CA
ConstructconnectCincinnati, OH

See All 41 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Bella House is a licensed social rehabilitation facility that provides a mental health residential program for adults, with a licensed capacity of 12 residents. Under contract with Napa County's Health and Human Services Agency (HHSA), Progress Foundation provides residential care, meals, medication monitoring, daily living skills training, and social and recreational activities at Bella House. Napa County acquired the Bella House property in 2005, which has continuously served as a residential facility supporting adults receiving mental health services. After approximately 20 years of use, the facility's kitchen and bathrooms have experienced significant wear and deterioration and are in need of rehabilitation. The rehabilitation scope of work includes demolition of existing restroom and kitchen equipment, fixtures, casework, and flooring finishes. Installation of new kitchen and restroom equipment, fixtures, casework, flooring finishes, interior painting, and replacement of light bulbs with LED light bulbs throughout the house. Bella House will remain occupied throughout construction, and the Contractor must coordinate work activities with facility and County staff to minimize disruption to residents. Due to the limited number of available restrooms, only one restroom may be taken out of service or impacted by construction activities at any given time. The Contractor shall sequence restroom work accordingly to ensure that the remaining restrooms remain available for residents, see section 4.36 -"Order of Work". Contractor shall not commence work prior to the notice to proceed date as noted in Special Provisions General Conditions section 4.10 - "Beginning of Work, Time of Completion and Liquidated Damages".

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong To Warner (CIP No. 20083)
Solicitation # CIP 20083
The City of Tustin is soliciting bids for the construction of the Tustin Legacy Linear Park - Phase 3 between Armstrong and Warner (CIP No. 20083). This project involves comprehensive site work, including excavation, electrical and instrumentation, plumbing, street improvements, and extensive landscaping and irrigation. Key deliverables include a 12-foot multi-modal path, a 6-foot walking trail, a playground with PIP rubber paving, fitness pods, art pads, an event lawn, and a rocky bluff zone with decorative boulders. The scope also incorporates stormwater management via planted bioretention swales and a variety of lighting, including pedestrian, street, and tree uplights. The engineer's estimate for the project is 11,100,000 dollars with a contract duration of 190 days. Bidders must hold a Class A contractor's license and provide a bid bond, with electronic submissions due via OpenGov by December 10, 2026, at 2:00 pm. A hard copy of the bid bond must also be delivered to the City Clerk to be considered responsive. Award will be based on the apparent low bidder. The contract requires compliance with Cal-OSHA safety standards, 2008 ADA accessibility standards, and California Labor Code prevailing wage requirements. Payment will be made through monthly progress payments at 95 percent of the work value, with the final 5 percent released within 60 days of the Notice of Completion.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
La Palma Alleys Sewer Improvement Project
Solicitation # RCP2023-21228
The La Palma Alleys Sewer Improvement Project, solicitation RCP2023-21228, is a public works initiative by the City of Anaheim to address capacity and operational deficiencies within its sanitary sewer system. The primary objective is to replace outdated 6-inch diameter pipes with the current 8-inch minimum standard to mitigate root intrusion and offset joints. Additionally, the project focuses on resolving specific operational failures, including the removal of a siphon at the intersection of La Palma and Harbor and the correction of a previously unknown sag between manholes SW070319 and SW071102. The scope also includes the design of neighborhood greening and stormwater capture systems using modified tree wells and catch basins, with all work adhering to the Central Anaheim Master Plan of Sanitary Sewers and City Design Standards. The City utilizes a qualifications-based selection process to award the contract, ranking consultants based on their expertise and the qualifications of key personnel. Selected firms must provide a Preliminary Design Report and CAD drawings, while adhering to strict administrative requirements, including bi-weekly status reports and monthly invoicing tied to a Work Breakdown Structure. Compliance mandates include the use of California prevailing wage rates, Buy America requirements, and the submission of various certifications regarding non-collusion, non-lobbying, and equal employment opportunity. Final acceptance of the work is contingent upon the submission of CCTV inspection videos for all pipes exceeding four inches in diameter and the successful restoration of ADA ramps. Proposals must be submitted electronically via OpenGov by December 3, 2026.
Engineering Services

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS