Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Commerce was posted on August 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Benchtop Thermogravimetric Analyzer (TGA)/Differential Scanning Calorimetry (DSC)

Closed
1333ND25QNB640340Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334516
New
Federal
Low-Range Force Frame Kit
Solicitation # N6426726R1010
Solicitation N6426726R1010 is a request for proposals for a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract to procure Low-Range Force Frame Kits (FFK) for the Naval Surface Warfare Center, Corona Division. The government intends to purchase a minimum of two and a maximum of 45 kits to support Navy fleet Calibration Laboratories. These kits must provide a stable platform for mounting and aligning force gages and dynamometers, adhering to Calibration Standards Specification (CSS) 06-3228 and MIL-PRF-28800G Class 4 environmental standards. Key deliverables include the hardware, a transit case with specific gasket and fastening requirements, COTS operator and service manuals (CDRL T001), and a repairable parts list (CDRL A001). All equipment must feature permanent identification plates and two-dimensional Unique Identification (IUID) data matrices conforming to MIL-STD-130N. The contract will be awarded based on the Lowest Price Technically Acceptable (LPTA) basis, evaluating proposals on total price and a technical rating of acceptable or unacceptable. Technical evaluation includes a review of the offeror's past performance using up to three references from the last three years. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment (PIEE) portal by October 21, 2026. Required submission documents include a completed Cross Reference Matrix in Microsoft Excel, pricing for all CLINs, and a Small Business Subcontracting Plan for offerors other than small business concerns. Delivery is required within 120 calendar days from the issuance of a delivery order, with shipments sent FOB Contractor Destination.
Naval Surface Warfare Center

POSTED

about 22 hours ago

DEADLINE

in 12 days
NAICS: 334516
New
Federal
Off-Axis Parabolic Mirrors
Solicitation # FA860127Q0003
The Air Force Life Cycle Management Center, on behalf of the Air Force Institute of Technology, is conducting market research via a Sources Sought notice to identify qualified sources for the manufacture and delivery of 66 customized off-axis parabolic mirrors and associated protected-gold coating services. These precision optical components are intended for use in the Extreme Light Laboratory to support ultra-intense laser experiments. The mirrors must feature a 30mm diameter fused-silica substrate with a parabolic focus at 45 degrees, a surface roughness of less than 1nm RMS, and a scratch/dig specification of 20-10. The required protected-gold coating must provide an average reflectivity of at least 97 percent at a wavelength of 780 plus or minus 40nm with a 45-degree angle of incidence. The selected contractor will be responsible for all labor, materials, quality assurance, and transportation to Wright-Patterson Air Force Base, Ohio. Key deliverables include the mirrors and comprehensive test data, including certificates of conformance and surface-measurement data. Delivery is required within 98 calendar days after receipt of order, and the equipment must be warranted against defects for two years following receipt. Payment terms are set at 100 percent after delivery, net 30 days from the invoice date. Interested parties under NAICS code 334516 must submit a capability package by October 23, 2026.
FA8601 Aflcmc Pzio

POSTED

about 22 hours ago

DEADLINE

in 2 days
NAICS: 334516
New
Federal
Flight Model Solar Array Wings
Solicitation # 80NSSC27946791Q
NASA/NSSC is seeking capability statements for the procurement of flight-qualified solar array wings for the TERP RAPTOR 12U CubeSat mission to asteroid Apophis. The requirement includes the acquisition and delivery of one flight model consisting of two solar array wings, each featuring 20 solar cells, hinges, spacers, and a thermal knife deployment system. The scope of work encompasses a comprehensive test campaign involving vibrations, TVAC, and bake-out tests, as well as the delivery of interface documentation, software, and calibration data. The contractor must also provide technical support during solar panel acceptance, spacecraft integration, and initial functional verification at the NASA Goddard Space Flight Center in Greenbelt, Maryland. This procurement is being conducted under FAR Part 12 for commercial items, with a planned period of performance for unit testing and integration from July 1, 2027, through October 31, 2027. While NASA/NSSC intends to issue a sole source contract to DHV Technology under FAR 12.102(a), they are currently requesting capability statements to determine if the procurement should be conducted on a competitive basis. Interested parties must submit their qualifications in writing to the designated point of contact by October 28, 2026. Please note that quotes will not be evaluated at this stage, and all correspondence must reference the notice ID 80NSSC27946791Q.
National Aeronautics And Space Administration

POSTED

about 22 hours ago

DEADLINE

in 7 days
NAICS: 334516
New
Federal
ICP-OES for Oil Analysis
Solicitation # W911S227U0057
Solicitation W911S227U0057 is a Request for Quotation for the procurement of new equipment for the material analysis lab at Yuma Test Center, specifically an Inductively Coupled Plasma-Optical Emission Spectrometer (ICP-OES) and a compatible autosampler. The ICP-OES must feature a radial torch with radial view, oxygen burn capability, chiller-free operation, and the ability to integrate a Catech ASXpress system and export data via .csv for LIMS entry. The autosampler must include a mixing or stirring head, a sample induction head, and a capacity for up to 384 samples across four 96-position test tube racks, with dimensions not exceeding 20 by 24 by 24 inches. Both items must be designed to meet ASTM D-5185 and Caterpillar SOS program performance standards. This acquisition is a Total Small Business Set-Aside under NAICS code 334516, managed by the W6QM Micc-Ft Drum. Award will be granted to the responsible offeror whose proposal is most advantageous to the government, based on an evaluation of price and technical factors. Only new equipment will be accepted; used or remanufactured products are prohibited. Offers of equal products must provide brand names, model numbers, and descriptive literature to prove compliance with salient characteristics. Delivery is required F.O.B. destination, with a preferred timeframe of 30 days. Quotes must be submitted through the PIEE Solicitation module by November 14, 2026.
W6QM Micc-Ft Drum

POSTED

about 22 hours ago

DEADLINE

in 24 days
NAICS: 334516
New
International
HIGH THROUGHPUT SIMULTANEOUS DYNAMIC VAPOR SORPTION (DVS) ANALYSIS SYSTEM
Solicitation # 26-58161
The National Research Council Canada is soliciting offers for the supply, delivery, and installation of a high throughput simultaneous dynamic vapor sorption (DVS) analysis system for its Clean Energy and Innovation facility in Mississauga, Ontario. This system will be used to characterize and quantify the adsorption and desorption behavior of advanced materials, including battery materials such as anodes and cathodes, CO2 capture sorbents, and catalysts for hydrogen production and carbon conversion. The contract includes three primary lump sum deliverables: the DVS system with associated software and accessories, installation, and onsite training. The equipment must be delivered within 10 weeks of contract issuance, with installation completed within 120 days of the award. Specifically, installation must begin within 14 days of delivery and be completed within seven calendar days of the start date, followed by onsite training within 14 days of installation. All electrical equipment must be certified according to the Canadian Electrical Code, Part 1. The award will be based on the lowest evaluated price among offers that meet all mandatory technical criteria. Payment is structured upon the completion and acceptance of deliverables, with the provision that accepted equipment may be invoiced prior to the completion of installation and training. The delivery term is Delivered at Place (DAP) Mississauga, ON, Incoterms 2020. Offerors must submit separate electronic technical and financial proposals by October 28, 2026, ensuring compliance with environmentally preferable packaging specifications and the Canada Procurement Code of Conduct.
National Research Council of Canada

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 334516
New
SLED
Laboratory Equipment, Microscope & Accessories (Supply and Install) (Echo Revolve)
Solicitation # 40-27
Solicitation 40-27, issued by the New Hampshire Department of Administrative Services, seeks bids for the supply, delivery, and turn-key installation of an Echo Revolve R4 Upright Microscope and associated accessories for the NH Department of Fish and Game in Concord, New Hampshire. The required equipment is a hybrid fluorescence microscope capable of flipping between upright and inverted modes, featuring a 12.9-inch iPad Pro Retina display. Key deliverables include the microscope system, specific LED light cubes, various objective lenses, an ELWD universal condenser, stage inserts, and a digital haze reduction software module. The successful vendor must complete delivery and installation within 45 business days of the contract award. The contract will be awarded to the responsible vendor who submits a conforming bid meeting all technical specifications at the lowest total cost. Bids are due by October 23, 2026, and must be submitted via email to the Bureau of Purchase and Property. Vendors are required to provide proof of comprehensive general liability insurance of at least 1 million dollars per occurrence and 2 million dollars aggregate, as well as workers compensation insurance. Environmental guidelines encourage the elimination of PVC and polystyrene and the use of SmartWay transport partners. Payment terms are set at 30 days following the receipt of an itemized invoice after the equipment has been delivered, inspected, and accepted by the agency.
Das Purchasing (statewide Bids & Contracts)

POSTED

1 day ago

DEADLINE

in 2 days

General Info

NAICS

334516 - Analytical Laboratory Instrument Manufacturing

Place of Performance

Gaithersburg, MD, 20899, USA

Set-Aside

NONE

Documents

2

RFQ 1333ND25QNB640340 Minimum Specifications

PDF, High priority: read this firstspecifications
High

Solicitation 1333ND25QNB640340: Benchtop TGA/DSC

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Commerce Nist
Contacts2 people available
OfficeGAITHERSBURG, MD, 20899, USA
Organization / AgencyDepartment Of Commerce Nist
Office AddressGAITHERSBURG, MD, 20899, USA

Full Description

Show more
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The solicitation number is identified above. This solicitation is issued a request for quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-04 that was effective on June 11, 2025. This acquisition is unrestricted; the NAICS code is 334516 with a small business size standard of 1,000 employees. A list of line item number(s) and items, quantities, and units of measure: Contract Line Item Number (CLIN): 0001 Quantity: 1 Unit: Each Contract Type: Firm-Fixed-Price Description: Benchtop Thermogravimetric Analyzer (TGA)/Differential Scanning Calorimetry (DSC); see attached minimum specifications FOB Point: FOB Destination Delivery date: Within 3 months after contractor acceptance of order Delivery address: Gaithersburg, Maryland (address to be specified in order) The provision at 52.212-1, Instructions to Offerors-Commercial Products and Commercial Services, applies to this acquisition and a statement regarding any addenda to the provision. The contracting officer intends to award a purchase order to the responsible quoter whose technically acceptable quotation represents the lowest evaluated price. QUOTATION SUBMISSION INSTRUCTIONS: (a) Submission of quotations. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. (b) As a minimum, quotations must show (1) The solicitation number; (2) The time specified in the solicitation for receipt of offers; (3) The name, address, and telephone number of the offeror; (4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary; (5) Terms of any express warranty; (6) Firm-Fixed-Price for Contract Line Item Number 0001 (including any and all costs associated with shipping, logistics and transportation) and any discount terms; (7) A completed copy of the representations and certifications at Federal Acquisition Regulation (FAR) 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically); (8) Acknowledgment of Solicitation Amendments; (9) If the quotation is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration. (c) Period for acceptance of quotations. The quoter agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of quotations. (d) Multiple quotations. Quoters are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with FAR subpart 4.10), or alternative commercial products or commercial services for satisfying the requirements of this solicitation. Each quotation submitted will be evaluated separately. The clause at 52.212-4, Contract Terms and Conditions-Commercial Products and Commercial Services, applies to this acquisition. The following addenda apply to that clause: INSPECTION AND ACCEPTANCE CRITERIA FOR CLIN 0001 The NIST Technical Point of Contact (TPOC) will inspect and test CLIN 0001 for compliance with specifications and interface with the NIST equipment. The TPOC reserves up to 21 days after CLIN 0001 is delivered to NIST to complete that inspection and acceptance testing and to indicate to the contracting officer whether it passes inspection and acceptance testing. Within two business days after the contracting officer receives that information from the TPOC, the contracting officer will communicate it to the contractor. 1352.233-70 Agency Protests (Apr 2010) An agency protest may be filed with either: (1) the contracting officer, or (2) at a level above the contracting officer, with the appropriate Protest Decision Authority. See 64 Fed. Reg. 16,651 (April 6, 1999) Agency protests filed with the Contracting Officer shall be sent to the following address: NIST/Acquisition Management Div. Attn: Joseph Widdup, Contracting Officer 100 Bureau Drive Stop 1640 Gaithersburg, MD 20899-1640 Agency protests filed with the agency Protest Decision Authority shall be sent to the following address: NIST/Acquisition Management Div. Attn: Head of the Contracting Office (HCO) 100 Bureau Drive Stop 1640 Gaithersburg, MD 20899-1640 A complete copy of all agency protests, including all attachments, shall be served upon the Contract Law Division of the Office of the General Counsel within one day of filing a protest with either the Contracting Officer or the Protest Decision Authority. Service upon the Contract Law Division shall be made as follows: U.S. Department of Commerce Office of the General Counsel Chief, Contract Law Division Room 5893 Herbert C. Hoover Building 14th Street and Constitution Avenue, NW Washington, DC 20230 FAX: 202/482-5858 1352.201-70 Contracting Officer's Authority (Apr 2010) The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price. 1352.201-72 Contracting Officer's Representative (COR) (APR 2010) (a) TBD is hereby designated as the Contracting Officer's Representative (COR). The COR may be changed at any time by the Government without prior notice to the contractor by a unilateral modification to the contract. The COR is located at: NIST 100 Bureau Drive Gaithersburg MD 20899 Phone Number: TBD Email: TBD (b) The responsibilities and limitations of the COR are as follows: (1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract. (2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor. 1352.209-73 Compliance with the Laws (Apr 2010) The contractor shall comply with all applicable laws, rules and regulations which deal with or relate to performance in accord with the terms of the contract. 1352.209-74 Organizational Conflict of Interest (Apr 2010) (a) Purpose. The purpose of this clause is to ensure that the contractor and its subcontractors: (1) Are not biased because of their financial, contractual, organizational, or other interests which relate to the work under this contract, and (2) Do not obtain any unfair competitive advantage over other parties by virtue of their performance of this contract. (b) Scope. The restrictions described herein shall apply to performance or participation by the contractor, its parents, affiliates, divisions and subsidiaries, and successors in interest (hereinafter collectively referred to as - contractor) in the activities covered by this clause as a prime contractor, subcontractor, co-sponsor, joint venture, consultant, or in any similar capacity. For the purpose of this clause, affiliation occurs when a business concern is controlled by or has the power to control another or when a third party has the power to control both. (c) Warrant and Disclosure. The warrant and disclosure requirements of this paragraph apply with full force to both the contractor and all subcontractors. The contractor warrants that, to the best of the contractor's knowledge and belief, there are no relevant facts or circumstances which would give rise to an organizational conflict of interest, as defined in FAR Subpart 9.5, and that the contractor has disclosed all relevant information regarding any actual or potential conflict. The contractor agrees it shall make an immediate and full disclosure, in writing, to the Contracting Officer of any potential or actual organizational conflict of interest or the existence of any facts that may cause a reasonably prudent person to question the contractor's impartiality because of the appearance or existence of bias or an unfair competitive advantage. Such disclosure shall include a description of the actions the contractor has taken or proposes to take in order to avoid, neutralize, or mitigate any resulting conflict of interest. (d) Remedies. The Contracting Officer may terminate this contract for convenience, in whole or in part, if the Contracting Officer deems such termination necessary to avoid, neutralize or mitigate an actual or apparent organizational conflict of interest. If the contractor fails to disclose facts pertaining to the existence of a potential or actual organizational conflict of interest or misrepresents relevant information to the Contracting Officer, the Government may terminate the contract for default, suspend or debar the contractor from Government contracting, or pursue such other remedies as may be permitted by law or this contract. (e) Subcontracts. The contractor shall include a clause substantially similar to this clause, including paragraphs (f) and (g), in any subcontract or consultant agreement at any tier expected to exceed the simplified acquisition threshold. The terms - contract, - contractor, and - Contracting Officer shall be appropriately modified to preserve the Government's rights. (f) Prime Contractor Responsibilities. The contractor shall obtain from its subcontractors or consultants the disclosure required in FAR Part 9.507-1 and shall determine in writing whether the interests disclosed present an actual, or significant potential for, an organizational conflict of interest. The contractor shall identify and avoid, neutralize, or mitigate any subcontractor organizational conflict prior to award of the contract to the satisfaction of the Contracting Officer. If the subcontractor's organizational conflict cannot be avoided, neutralized, or mitigated, the contractor must obtain the written approval of the Contracting Officer prior to entering into the subcontract. If the contractor becomes aware of a subcontractor's potential or actual organizational conflict of interest after contract award, the contractor agrees that the Contractor may be required to eliminate the subcontractor from its team, at the contractor's own risk. (g) Waiver. The parties recognize that this clause has potential effects which will survive the performance of this contract and that it is impossible to foresee each circumstance to which it might be applied in the future. Accordingly, the contractor may at any time seek a waiver from the Head of the Contracting Activity by submitting such waiver request to the Contracting Officer, including a full written description of the requested waiver and the reasons in support thereof. 1352.233-71 GAO and Court of Federal Claims Protests (Apr 2010) A protest may be filed with either the Government Accountability Office (GAO) or the Court of Federal Claims unless an agency protest has been filed. A complete copy of all GAO or Court of Federal Claims protests, including all attachments, shall be served upon (i) the Contracting Officer, and (ii) the Contract Law Division of the Office of the General Counsel, within one day of filing a protest with either GAO or the Court of Federal Claims. Service upon the Contract Law Division shall be made as follows: U.S. Department of Commerce Office of the General Counsel Chief, Contract Law Division Room 5893 Herbert C. Hoover Building 14th Street and Constitution Avenue, N.W. Washington, D.C. 20230 FAX: (202) 482-5858 NIST LOCAL-53 CONTRACT PERFORMANCE DURING CHANGES IN NIST OPERATING STATUS All contractors performing work on active contracts at the U.S. Department of Commerce (DOC), National Institute of Standards and Technology (NIST) campus and/or working in NIST workspaces should go to the www.nist.gov website and under the - About NIST tab click on - Visit. This site includes information about campus access and security information; identification requirements; parking information and more. Contractor personnel are required to check the appropriate campus operating status and personnel requirements at https://www.nist.gov/campus-status daily prior to arriving on site. All personnel must adhere to the requirements set forth in the operating status. Unless otherwise stated in the contract terms and conditions, normal days of business operation are Monday through Friday, excluding Federal Holidays. However, throughout the contract period of performance, there may be circumstances beyond the control of NIST that will impact normal days of business operation, such as inclement weather, power outages, etc. In circumstances such as these, the Contractor must call the appropriate NIST campus status line to verify the operating status: Gaithersburg Campus Operating Status Line: (301) 975-8000 (800) 437-4385 x8000 (toll free) Boulder Campus Operating Status Line: (303) 497-4000 (303) 497-3000 option 2 In the event of a lapse in appropriation, access to Government facilities and resources, including equipment and systems, will be limited to excepted personnel for both Federal employees and Contractor personnel. If performance of the contract is onsite and/or requires Government interaction, unless the contractor has been, or is notified that it is required to work under an excepted status, the contractor must stop work. The work stoppage shall remain in effect until the lapse is resolved and notification is provided via the NIST website at https://www.nist.gov/ (banner on front page) and/or the NIST operating status line(s). Additionally, contractors are encouraged to monitor public broadcasts or the Office of Personnel Management's website at www.opm.gov for the Federal Government operating status. NIST will provide notification to all contractors that are determined to have excepted status. All excepted contractors are required to continue performance and communicate with the appointed Contracting Officer's Representative (COR) for further guidance, or NIST Contracting Officer if a COR is not appointed. Contractors with supply or service contracts that are fully funded at the time of contract award and do not require access to Government facilities, resources, or active administration by Government personnel in a manner that would not cause the government to incur additional obligations during the lapse in appropriation may continue performance. Please note that in all circumstances that impact operations on the NIST campuses, contractors are expected to follow all direction and guidance provided by NIST authorities. Department of Commerce Agency-Level Protest Procedures Level above the Contracting Officer is also incorporated. It can be downloaded at www.nist.gov/admin/od/contract/agency.htm The clause at 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services, applies to this acquisition. The following additional FAR clauses cited in clause 52.212-5 are applicable to the acquisition: 52.203-17 Contractor Employee Whistleblower Rights (NOV 2023) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) 52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023) 52.204-30 Federal Acquisition Supply Chain Security Act Orders'Prohibition (DEC 2023) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JAN 2025) 52.222-3 Convict Labor (JUN 2003) 52.222-19 Child Labor - Cooperation with Authorities and Remedies (JAN 2025) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-50 Combatting Trafficking in Persons (NOV 2021) 52.225-1 Buy American Act - Supplies (OCT 2022) 52.225-13 Restriction on Certain Foreign Purchases (FEB 2021) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (OCT 2018) RFQ NO. 1333ND25QNB640340 MINIMUM SPECIFICATIONS Contract Line Item Number (CLIN) 0001 shall meet the following minimum requirements: The Contractor shall provide one Benchtop Thermogravimetric Analyzer (TGA)/Differential Scanning Calorimetry (DSC) that includes the specified equipment, software, and consumables that meets the following minimum specifications: The equipment shall be a laboratory benchtop unit rather than a floor standing model. The furnace on the unit shall be capable of operation up to a minimum of 1750 oC in an oxidizing (air) atmosphere. The resolution of the TGA system shall have a minimum of 0.1 mg. The system shall accommodate heating rates up to 50 oC/min. The furnace shall be equipped with MoSi2 type heating elements and contain no graphite components. The TGA/DSC analyzer sample holders shall accommodate and capable of measuring samples up to 5 mL and 35 g. The unit shall be constructed with a vertical top-loading design in which the sample holder arms are placed in vertical positions, and the sample holders are placed on the top of the arms. The unit shall be equipped with a forced-flow functionality. Forced-flow is defined here as the ability to directly supply gas flow to the samples from the bottom of the sample holders rather than through an exhaust port in the furnace chamber. The TGA/DSC system shall accommodate reactive gas environments including gas mixtures with 5% H2 at most with high concentrations of water vapor and includes the ability to heat the gas delivery tubing to the furnace to prevent condensation. The TGA/DSC system shall be equipped with both a type-B thermocouple and encapsulated type-C thermocouple to accommodate the range of oxidizing to highly reducing gas atmospheres as a result of the temperature range and gas environments the equipment can perform. The TGA/DSC analyzer shall come pre-installed with mass-flow controllers for the delivery gases. These controllers shall accommodate flow rates of up to 20 L/h. These mass-flow controllers shall be rated for air, N2, and forming gas H2/N2. The system shall be supplied with a basic package of TGA and DSC calibration materials. The package shall include 50 units of 0.1 to 0.2 mL aluminum oxide TGA measurement crucibles. The package shall include 20 units of 5 mL aluminum oxide TGA measurement crucibles. The package shall include a PC with Windows OS and the appropriate software to control the TGA/DSC unit. The package shall include a 2-stage vacuum rotary pump.

More opportunities from Department Of Commerce Nist

Same awarding agency

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Industrial Building Construction

POSTED

2 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS