Benicia SRA Day-Use Accessibility Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Benicia SRA Day-Use Accessibility Improvements project aims to bring the Benicia State Recreation Area into compliance with California State Parks accessibility guidelines and legal mandates. The scope of work focuses on three primary locations: the Botanical Garden Day-Use Area, the Benicia Bay Trailhead Day-Use Area, and the Dillon Point Parking Area. Key improvements include replacing asphalt parking stalls and transition spaces with concrete pavement, installing truncated domes, and constructing accessible crosswalks and curb ramps. At the Botanical Garden and Benicia Bay Trailhead, the project involves constructing day-use areas and routes featuring compacted aggregate surfaces, rock retaining walls, wood turnpike edging, and split rail fencing. Additional site work includes relocating and upgrading water stations to meet accessibility standards, as well as installing new group barbeque grills and picnic tables. The project requires various levels of excavation for footings, signposts, and utility trenching to ensure all facilities are fully accessible to the public.

General Info

Accessibility improvements at Benicia SRA involving paving, signage, and facility upgrades for compliance.

Agency

California Parks and Recreation, Department of

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Benicia State Park Road and Dillon Point Road, Benicia, CA

Set-Aside

NONE

Documents

(1)

13289_Benicia SRA Day Use Accessibility Improvements dNOE_09

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Parks and Recreation, Department of
Contacts1 person available
OfficeN/A
Organization / Agency
California Parks and Recreation, Department of
Office AddressN/A
Contacts
Brad MichalkStatewide CEQA Coordinator

Full Description

Show more
Improve access to existing day use facilities at Benicia State Recreation Area to bring the area trails into compliance with California State Parks accessibility guidelines and associated legal mandates. Work will: Botanical Garden Day-Use Area: ? Sawcut and remove existing accessible parking stall and transition space asphalt pavement at entrance to botanical garden. Reconstruct accessible parking and transition space with concrete pavement. ? Remove existing asphalt paved accessible parking stall at day-use side of parking lot. Reconstruct accessible parking space with concrete pavement. ? Remove grills and picnic tables. Leave with park for re-use or dispose of properly. ? Remove existing and relocate water station and upgrade to accessible guidelines. New water station will include 4’ x 6’ concrete pad and associated drain. Trench to extend water line from existing to proposed location will be required with excavation of maximum depth of 3’. ? Remove 6’ of asphalt curb at day-use accessible parking and construct 4’ x 6’ concrete pad for installation of truncated domes. ? Construct day-use area and route with associated retaining walls, wood turnpike edging, and split rail fencing. Excavation for rock retaining wall footing will be less than 18” depth. o The day-use area location will be site located as far away from the existing trees as possible but will be limited based on topography and the maximum height of rock retaining walls at 4’. The maximum excavation in this area is 63 CY (12’ x 56’ x 2.5’). o Day-use constructed surfaces will be a compacted aggregate. Fill material in areas of fill will be excavated soils and crushed aggregate. ? Install new group barbeque grill and 5 picnic tables. ? General excavation where not noted elsewhere will be minimal 6” to 9” with 36” at signpost and grill posts. Benicia Bay Trailhead Day-Use Area: ? Remove grills and picnic tables. Leave with park for re-use or dispose of properly. ? Construct day-use area and route with associated retaining walls, wood turnpike edging, and split rail fencing. Excavation for rock retaining wall footing will be less than 18” depth. o Day-use constructed surfaces will be a compacted aggregate surface. Fill material in areas of fill will be excavated soils and crushed aggregate. o Install new, 5 group barbeque grills and 14 picnic tables. General excavation where not noted elsewhere will be minimal 6” to 9” with 36” at signpost and grill posts. Dillon Point Parking Area: Remove existing asphalt pavement. Construct accessible parking space with concrete pavement, crosswalk, and curb ramp.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE), Veteran-Owned Small Business Enterprises (VSBE), and Disadvantaged Business Enterprises (DBE) for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure needs such as site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical work, and telecommunications. Bidders must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal, hold a valid California Contractor's license, and provide acceptable insurance. Subcontractors may be required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code, requiring firms to maintain labor harmony and adhere to collective bargaining agreements with various trades. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested firms must contact the lead estimator to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS