Benson Pier Rebuild

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the removal of a deteriorated pier and boathouse structure on Donner Lake and the construction of a new pier to eliminate a hazard to navigation and public safety caused by storm damage. The existing 15 wooden pilings, which impact 42.5 square feet of lakebed, will be fully removed and replaced with ten steel pilings that will occupy only 6.3 square feet of lakebed, resulting in a net re-establishment of 36.2 square feet of lakebed use. Installation of the new pilings will be conducted via drop or vibratory hammer from a barge or amphibious vehicle to minimize environmental disruption. The work is focused entirely on replacing an unsafe structure with a more durable and environmentally efficient design, with no expansion of overall footprints beyond the original licensed area. The project is managed by the Regional Water Quality Control Board, Region 6 – South Lake Tahoe, and is listed under the forecast category with a posted date of January 27, 2026. The place of performance is in Truckee, California, with the primary point of contact being Meghan Walsh, Engineering Geologist, who can be reached via email or phone for further inquiry. A site plan referenced as Enclosure 1 provides the exact layout and specifications for the reconstruction. No solicitation number or set-aside details are provided, indicating the project is still in the early planning or forecast phase.

General Info

Remove hazardous pier, install compact steel pilings to improve safety and reduce lakebed impact in Donner Lake.

Agency

California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe

Place of Performance

Truckee, CA, 96161

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Office AddressN/A
Contacts
Meghan WalshEngineering Geologist

Full Description

Show more
The purpose of the Project is to remove the existing failing pier and boathouse structure and reconstruct a new pier at the subject property on Donner Lake. The pier and boathouse structure were severely damaged during summer storm events and in their current state pose a hazard to navigation and the public. The reconstructed pier will consist of steel pilings which will be driven using a drop or vibratory hammer operated from a barge or amphibious vehicle. The existing 15 wooden pilings totaling 42.5 square feet (0.0009 acres) of lakebed impact will be removed, and ten driven steel pilings totaling 6.3 square feet (0.0001 acres) of lakebed impact will be installed. The project will result in the re-establishment of 36.2 square feet (0.0008 acres). A site plan is provided as Enclosure 1.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 23 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 24 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 24 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS