Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

El Cerrito & Rolando Park Storm Drain & Green Infrastructure

Forecast
PRJ-1127232State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Diego Stormwater Department is initiating the El Cerrito and Rolando Park Storm Drain and Green Infrastructure project, identified as PRJ-1127232. This project aims to mitigate existing flooding and improve water quality within the Chollas Creek Watershed. The scope of work involves upsizing and realigning the storm drain system to meet city standards, which includes installing up to 3,400 linear feet of new storm drain and 54 new structures, while removing or abandoning up to 1,200 linear feet of existing pipeline. Additionally, the project will install a new outfall into the Rolando Channel and implement green infrastructure consisting of up to eight modular wetland systems near University Avenue and College Avenue. The project is divided into two non-contiguous areas: Subarea 1 in El Cerrito and Subarea 2 in Rolando Park. While Subarea 1 is located outside of Environmentally Sensitive Lands, work in Subarea 2 is partially within such lands and must comply with the City of San Diego Environmentally Sensitive Lands Regulations. The project also includes the expansion of drainage easements to ensure proper maintenance and the vacation of easements where infrastructure is moved from private property to the public right of way. This effort has been granted a statutory exemption under CEQA Guidelines Section 15282(k) because the total combined length of abandoned and new pipeline is less than one mile and does not include surface facilities tied to underground operations.

General Info

San Diego project upgrading storm drains and green infrastructure in El Cerrito and Rolando.

Agency

California → City of San Diego

Place of Performance

El Cerrito & Rolando Park Neighborhoods, San Diego, CA, 92115

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Alexis WhiteSenior Planner

Full Description

Show more
Site Development Permit and Easement Vacation would allow for the replacement and improvement of storm drain infrastructure to address existing flooding and water quality conditions. Project would also install new green infrastructure improvements to improve water quality. The Project is located in the El Cerrito and Rolando Park communities of southeastern San Diego, in the Chollas Creek Watershed (United States Geologic Survey Hydrologic Unit Code 180703041201). Work would take place in two non-contiguous subareas, referred to as Subarea 1 (El Cerrito) and Subarea 2 (Rolando Park). Work in Subarea 1 would be located wholly outside of Environmentally Sensitive Lands and work in Subarea 2 would be located partially within Environmentally Sensitive Lands. Work within Environmentally Sensitive Lands would be subject to the City of San Diego Environmentally Sensitive Lands Regulations. The Project would consist of municipal storm drain and water quality treatment infrastructure improvements in the El Cerrito and Rolando Park neighborhoods of San Diego. It would upsize and realign the existing storm drain system at both locations to meet City standard requirements, install a new outfall into the Rolando Channel, and install green infrastructure including up to eight modular wetland systems near the intersection of University Avenue and College Avenue. Project would also abandon several segments of storm drain located on private property. In total, up to 1,200 linear feet of storm drains would be removed or abandoned, up to 3,400 linear feet of new storm drain would be installed, and up to 54 new storm drain structures would be installed. Therefore, the combined total of abandoned pipeline and new pipeline would be under one mile. Surface facilities are not tied to the operation of the underground pipeline. Existing drainage easements would be expanded to meet City standards and allow for the proper maintenance of the drainage facilities. In instances in which the storm drain network would be abandoned and realigned from private property to the public right of way, the existing drainage easements would no longer be needed and would be vacated.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 23 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 24 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 24 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS