Yolo Bypass Wildlife Area Habitat and Drainage Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Yolo Bypass Wildlife Area Habitat and Drainage Improvements Project, managed by the California Department of Fish and Wildlife, aims to enhance the management of wetland resources and agricultural operations in West Sacramento, California. The project focuses on restoring water conveyance infrastructure to reduce on-site flooding, improve land drainage, and expand managed wetland acreage. Key physical improvements include installing new water control structures, expanding canals, installing box culverts and two con-span bridges, replacing existing culverts, raising road grades, separating dual-function ditches, and relocating one water pump while installing two new pumps. A CEQA addendum dated June 11, 2025, modified the original project scope to address changes in flooding and drainage patterns and to reduce long-term costs. Specifically, the cross canal pump station originally planned as Element 4 will not be built and will instead be replaced by passive drainage structures. The project was approved on June 12, 2025, and is subject to various regulatory permits, including those from the U.S. Army Corps of Engineers, the Central Valley Flood Protection Board, and the Central Valley Regional Water Quality Control Board. Construction is intended to be completed within a single season, with work occurring Monday through Friday from 7:00 a.m. to 7:00 p.m.

General Info

CDFW project to improve drainage and wetland infrastructure at Yolo Bypass Wildlife Area.

Agency

California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

West Sacramento, CA

Set-Aside

NONE

Documents

(3)

YBWA Habitat and Drainage Improvements Project Draft ISMND

PDFismnd

Yolo Bypass Wildlife Area Habitat and Drainage Improvement Project Notice of Determination

PDFnotice-of-determination

YBWA Habitat and Drainage Improvements Project CEQA Addendum Final

PDFceqa-addendum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 3 - Bay Delta, Fairfield
Office AddressN/A
Contacts
Garrett SpaanSenior Environmental Scientist (Supervisory)

Full Description

Show more
The proposed project includes five major improvements, identified as project components, that are being proposed to enhance the CDFW ability to manage wetland resources and agricultural operations within the Yolo Bypass Wildlife Area. Specific improvements include installing new water control structures, expanding canals, installing box culverts and two con-span bridges, replacing existing culverts, raising road grades, separating dual function ditches, relocating an existing water pump, and installing two new pumps. This addendum is to address modifications to the original project that were a result of a change in flooding and drainage flow patterns and to reduce long term cost and impacts. Four of the five elements of the MND have been completed but one element will not be completed. Element 4, the cross canal pump station will not be built, and it will be replaced by passive structures to drain water from the YBWA. Additional description of the modifications to meet the objectives of the pump are described below.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS