Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Middle Chiquita A and B Reservoir Management System (RMS) & Safety Upgrades, C-1767A.01

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Margarita Water District is undertaking improvements to the Middle Chiquita A and B Reservoir Management System located at 28213 Esencia Dr, Rancho Mission Viejo, California, under project identifier C-1767A.01, with work focused on safety enhancements and environmental compliance. The scope includes installation of new hatches for RMS mixers and chlorine dosing systems, roof vents to facilitate filling and drainage, construction of a dedicated chemical storage facility, implementation of roof fall restraint systems for worker safety, and surface paint touch-ups performed under full containment to prevent any environmental release. All activities are categorized as exempt under CEQA Section 15301 as minor alterations to existing facilities with no significant environmental impact, and the project has been formally documented through a Certificate of Determination and Notice of Exemption filed with the Orange County Clerk-Recorder. The work is being executed directly by the district without a formal procurement or contractor engagement, and no contract value, pricing structure, or acquisition vehicle has been identified. The only designated point of contact is Tricia Butler, Chief Engineer, who serves as the lead agency representative for all project-related inquiries. No federal acquisition regulations, contract clauses, or standard procurement mechanisms such as FAR parts, CLINs, or solicitation numbers are applicable, as this is a state-level environmental compliance project funded and managed entirely by a public water district. There are no designated contracting officers, CORs, COTRs, or payment office details beyond general agency contact information and accepted payment methods for associated filing fees—cash, credit, or check. No federal identifiers such as UEI or CAGE codes, socioeconomic certifications, or labor compliance requirements like Davis-Bacon are triggered, and the project does not involve federal funding or oversight. Deliverables are performance-based and site-specific, with inspection and acceptance handled by the district at the project location. Submission of environmental documentation requires physical filing with the Orange County Clerk-Recorder and possibly a secondary submission to the Office of Planning and Research in Sacramento, with no electronic portal or digital submission method supported. There is no defined period of performance, delivery schedule, or FOB terms, as the project is internally managed under CEQA exemptions rather than a formal contract award process.

General Info

Santa Margarita Water District upgrades reservoir systems for safety and compliance, internally managed, CEQA exempt, no contract or federal obligations.

Agency

California → Santa Margarita Water District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Esencia Drive and Medano, CA, 92694

Set-Aside

NONE

Documents

(1)

NOE 24-85000357 Middle Chiquita A & B Reservoir Mgmt System Safety Upgrades

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Margarita Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Margarita Water District
Office AddressN/A
Contacts
Tricia ButlerChief Engineer

Full Description

Show more
Construct various reservoir improvements that include safety improvements and paint touch-ups that will be performed with full containment.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details