Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Maintenance of Northwestern Basin Rehabilitation (L02P22)

Forecast
PP-25-0204State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Maintenance of Northwestern Basin Rehabilitation project, identified as solicitation PP-25-0204, involves the rehabilitation of the Northwestern Basin located in the Las Flores Unincorporated Area of Orange County, California. Managed by Orange County Public Works and OC Construction, the scope of work includes the removal and replacement of a damaged CMP riser and existing rip rap, the installation of grout from the access road to the riser and into voids under the existing pipe, and the clearing of vegetation from the concrete turn-around pad. Additionally, the project requires the inspection and clearing of blockages in the retaining wall weep holes and the implementation of Best Management Practice measures. The project is classified as a forecast under NAICS code 237990 and is exempt from CEQA under Section 15301 Class 1 for the repair and maintenance of existing public facilities. Construction is expected to last approximately five months, with an anticipated completion date in the Spring of 2027. Logistics are expected to be minimal, with approximately eight construction truck trips and no traffic impacts due to onsite staging. Key project personnel include Project Manager Diane Hernandez and Senior Planner Virginia Gomez.

General Info

Northwestern Basin rehabilitation in Orange County involving riser replacement and maintenance by 2027.

Agency

California → Orange County

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Orange County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Orange County
Office AddressN/A

Full Description

Show more
The proposed project involves the rehabilitation of the Northwestern Basin located in the Las Flores Unincorporated Area (33.59248402, -117.62851346) in the County of Orange. The rehabilitation activities involve the removal and replacement of the existing, damaged, CMP riser; installation of grout from the access road to the riser; clearing vegetation from the concrete turn-around pad; removal and replacement of the existing rip rap; inspect and clear out any blockages in the weep holes on the retaining wall; and inject the voids under the existing pipe with grout The proposed project anticipates 8 construction truck trips, no traffic impacts as construction staging will be onsite, and the implementation of Best Management Practice measures. Construction will take approximately 5 months and is anticipated to be completed in the Spring of 2027.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026 for the construction of Interim Remedial Action at the Nelson Tunnel Superfund Site, located one mile north of Creede in Mineral County, Colorado. With an estimated value between 15 million and 30 million dollars, the project aims to prevent the uncontrolled release of mine-impacted water from underground pools. The scope of work involves implementing Alternative 4 of the Interim Record of Decision, which includes installing a new bypass adit south of the Nelson Tunnel, rehabilitating the tunnel from the bypass connection to the bulkhead location, and installing flow control bulkheads within both the Nelson Tunnel and the Commodore 5 level. This unrestricted solicitation is open to both small and large businesses, with proposals expected by January 2027 via the Procurement Integrated Enterprise Environment system. Awards will be based on a best-value approach evaluating price, reasonableness, and realism alongside technical factors including project management approach, schedule, past performance, key personnel, and small business participation. The project must be completed within a proposed duration not exceeding 655 days, with work commencing within 10 days of the Notice to Proceed. Offerors must maintain active SAM.gov registration under NAICS code 237990.
W071 Endist Omaha

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
Federal
Tybee Island Shoreline Protection Project
Solicitation # W912HN27BA001
The Tybee Island Shoreline Protection Project, solicitation W912HN27BA001, is an unrestricted full and open competitive acquisition issued by the Department of Defense, W074 Endist Savannah. This project involves the placement of dredged material along approximately 13,500 feet of the Front Beach at Tybee Island, Georgia. The contract is structured as a single Firm Fixed Price award based on a sealed bidding process, with a construction magnitude estimated between $10,000,000 and $25,000,000. The scope includes a base bid for placing berm fill material along 7,000 feet of the construction baseline and four optional bid items for additional fill and beach tilling. Construction is restricted to the window between November 1, 2026, and April 30, 2027, with a total performance period of 90 calendar days from the Notice to Proceed. The project requires strict adherence to technical specifications, including the use of an automated Quality Control System and compliance with the Federal Clean Water Act and Georgia state water quality standards. Acceptance and final payment are determined by contractor-performed before and after surveys using specific NAD83 and MLLW coordinate systems. Bidders must provide a bid guarantee of 20 percent of the bid price or $3 million, whichever is less, and the successful awardee must furnish performance and payment bonds. Labor is subject to the Davis-Bacon Act under wage determination GA20260286 for Chatham County. Submissions must be made in Adobe PDF format via PIEE by December 10, 2026, and must include a completed Standard Form 1442 and detailed unit pricing.
W074 Endist Savannah

POSTED

about 6 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA063
The U.S. Army Corps of Engineers is soliciting construction services for an interim remedial action at the Nelson Tunnel Superfund Site near Creede, Colorado. The primary objective of this project is to mitigate the risk of uncontrolled releases of mine-impacted water from impounded mine pools. The selected remedy involves the construction of a new bypass adit south of the Nelson Tunnel to bypass the portal pool, the rehabilitation of the Nelson Tunnel from the bypass connection to the bulkhead location, and the installation of flow control bulkheads within both the Nelson Tunnel and the Commodore 5 level. All work must comply with CERCLA, the National Oil and Hazardous Substances Pollution Contingency Plan, and specific geotechnical baseline reports. This is an unrestricted solicitation open to both large and small businesses, utilizing a firm-fixed-price contract and a Best Value Trade-Off award process. Proposals will be evaluated based on project management approach and schedule, past performance, key personnel, and small business participation, with a minimum small business participation goal of 35% of the total contract value. Technical requirements include strict adherence to the National Electrical Code and MSHA standards, and the use of NETA Level III or NICET certified technicians for electrical testing. Offerors must be registered in the System for Award Management with NAICS code 237990 and submit their proposals via the PIEE Solicitation module in two distinct volumes.
W071 Endist Omaha

POSTED

about 6 hours ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS