Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

SBCTA Access Pad Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The SBCTA Access Pad Project, led by the Inland Empire Utilities Agency (IEUA) in Ontario, California, aims to restore access to an existing 30-inch sewer pipeline located adjacent to the north side of Interstate 10. This effort involves removing existing parking spaces to establish safe and permanent physical access for future maintenance operations, without expanding or modifying the pipeline itself. The project is classified as a minor alteration under the California Environmental Quality Act (CEQA) and qualifies for a Class 1 Categorical Exemption, signaling its limited environmental impact and streamlined approval process. Administrative documentation confirms compliance through a Notice of Exemption, a CDFW No Effect Determination, and payment of a $50 county documentary fee, but no formal contract award, pricing structure, or solicitation number has been issued as the project remains in forecast status. There is no identified contracting officer, COR, COTR, or formal procurement mechanism outlined in the available materials, and no federal acquisition regulation clauses, evaluation factors, payment terms, or invoicing systems are specified. The project does not involve a competitive bidding process, and no offeror representations, certifications, or socioeconomic qualifications are required or documented. The sole point of contact is Pietro Cambiaso, IEUA’s Manager of Compliance and Sustainability, who serves as the administrative liaison. Performance is limited to the specified location in Ontario, and acceptance will occur onsite, though formal inspection criteria or quality standards are not detailed beyond adherence to CEQA guidelines. The entire effort is driven by operational necessity for utility maintenance and is supported by state-level environmental compliance procedures rather than traditional federal procurement frameworks.

General Info

IEUA to restore access to 30-inch sewer line near I-10 in Ontario for maintenance, exempt under CEQA Class 1.

Agency

California → Inland Empire Utilities Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Ontario, CA

Set-Aside

NONE

Documents

(1)

SBCTA Access Pad Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Inland Empire Utilities Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Inland Empire Utilities Agency
Office AddressN/A
Contacts
Pietro CambiasoManager of Compliance and Sustainability

Full Description

Show more
The purpose of the proposed project is to restore access to an existing 30" sewer pipeline that will allow IEUA conduct maintenance operations in the future. Access will be restored to the existing pipeline and support Manholes by removing some parking spaces and creating access adjacent to the north side of Interstate 10.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details