Saddique's Private Boat Dock Installation Project
Forecast
19714State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Central Valley Flood Protection Board
Place of Performance
Sacramento, CASet-Aside
NONE
Timeline
PhaseForecast
Organization & Contact Information
Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Khalid Saddique c/o Angela Nguyen-TanSenior Environmental Scientist
Full Description
Show more
To install a single-berth, pile guided, steel frame boat dock consisting of two finger floats.Each finger float is 4-feet-wide by 40-feet-long. The project also includes 1) the construction of a steel frame gangway landing dock 12-feet-wide by 20-feet-long, 2) the construction of a 4-feet-wide by 73-feet-long aluminum gangway, 3) driving four 14-inch-diameter 68-feet-long steel piles, 4) the construction of a 5 feet by 6 feet
concrete abutment, 5) installation of rip rap, 6) installation of one light pole connected to existing underground electric box with 2-feet-long maximum conduit, and 7) a temporary 40-feet-long by 8-feet-wide by 8-feet-tall storage container anchored to ground,
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Prepare for this forecast
Research this forecast and prepare for the solicitation
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
