Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on January 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Barnett Winery - Use Permit (P19-00125-UP), Viewshed Protection Program (P20-00121-VIEW), and Exception to the Road and Street Standards

Awarded
P19-00125-UPState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 7 hours ago

DEADLINE

in 13 days
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 8 hours ago

DEADLINE

in about 1 year

AI Contract Overview

Show more

The Barnett Winery project seeks approval through Napa County to expand operations at its existing 20,000-gallon winery located at 4018/4070 Spring Mountain Road in Calistoga, California. The proposal includes remediation of unpermitted activities such as increased employee count, daily tours and tastings by appointment, marketing events, and on-premise outdoor wine consumption, which have triggered requirements for public water system upgrades, wastewater system improvements, and an exception to the Road and Street Standards for driveway modifications. Beyond compliance, the project proposes significant expansion: increasing annual wine production to 30,000 gallons, raising the full-time employee count to nine, intensifying visitor programs, constructing a new 1,700-square-foot hospitality building with a tasting room and office, adding parking spaces, installing a 12,000-gallon fire protection water tank, and implementing new landscaping, all subject to the stringent design and visual preservation requirements of the Viewshed Protection Program. Environmental compliance is central, with mandatory adherence to CEQA guidelines, implementation of a Mitigation Monitoring and Reporting Program, specific biological surveys to protect nesting raptors during seasonal restrictions, and strict control over stormwater, dust, and groundwater impacts in accordance with Napa County ordinances, California Fish and Game Code, and best management practices from CASQA and BAAD. The project has been processed under a land use permit framework rather than a traditional procurement contract, with no federal acquisition regulations, contract clauses, pricing structures, or procurement-specific terms such as LPTA or Best Value applied. Oversight is managed by Napa County’s Planning and Building Department, with Matt Ringel as the primary point of contact, and key approvals contingent upon engineering certification, environmental mitigation execution, and on-site compliance verification during construction and final inspection phases. All operations must align with existing groundwater protection standards, fire safety codes, and land use zoning restrictions, ensuring that growth is balanced with ecological and aesthetic preservation in the region.

General Info

Expand winery to 30,000 gallons, add hospitality building, parking, water tank, and comply with environmental and zoning rules.

Place of Performance

Spring Mountain Road and St. Helena Road, Calistoga, CA, 94574

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → Napa County
Office AddressN/A
Contacts

Interested Companies (1)

Holman Teague Roche AnglinNapa, CA

Full Description

Show more
This application was submitted to participate in the County’s Code Compliance Program . The proposal is to grant a new Use Permit to an existing 20,000-gallon winery established under a Small Winery Use Permit Exemption to allow the following: 1) Components necessary to remedy existing violations: Recognition and approval of increased employee count, daily tours and tastings by appointment only, marketing events, and on-premise outdoor consumption of wines produced at the winery. These unpermitted activities trigger a public water system, wastewater system improvements, and a RSS Exception for proposed driveway improvements. 2) Expansion beyond existing entitlements: increase wine production to 30,000-gallons per year, increase employee count, increase daily tours and tastings by appointment only, increase of marketing events, construction of a new hospitality building with a tasting room and office (subject to the Viewshed Protection Program), addition of parking spaces, installation of a 12,000-gallon water tank, and new landscaping.

More opportunities from California → Napa County

Same awarding agency

NAICS: 541620
SLED
Napa County Regional Climate Action and Adaptation PlanThe Napa County Regional Climate Action and Adaptation Plan is a coordinated regional initiative led by Napa County in partnership with the cities of American Canyon, Calistoga, Napa, St. Helena, and the Town of Yountville, aimed at reducing greenhouse gas emissions and enhancing climate resilience across the county. The plan targets key emission sources including vehicle travel, electricity use, natural gas consumption, and local land use practices, with measurable strategies organized across sectors such as energy, transportation, waste, and land use. Implementation timelines span from near-term actions starting in 2026 to long-term goals extending through 2045, with annualized cost estimates ranging from $386,085 in 2030 to $718,500 by 2045, reflecting projected investments in emissions reduction and adaptation measures. The plan includes specific project actions with clear performance targets and financial projections, though it does not conform to traditional federal procurement structures or include standard FAR clauses, contract line items, or formal bid evaluation criteria. The plan requires rigorous environmental compliance under CEQA, Cal/OSHA, CALGreen, and state and federal endangered species protections, with mandatory biological surveys, qualified biologist oversight, and habitat conservation measures. Construction and project activities must adhere to strict protocols including equipment decontamination to prevent invasive species spread, use of certified weed-free materials, installation of tire track stations, and implementation of spill prevention plans. All personnel must undergo environmental training, and work may be halted immediately if special-status species are detected. Mitigation efforts must include permanent conservation of affected lands via easements, and coordination with CDFW and USFWS is required for any project impacting protected species or habitats. Submission of proposals is due by August 31, 2026, via email, postal mail, or through an online portal, with oversight coordinated by Jesse Gutierrez, Principal Planner – Sustainability at Napa County’s Department of Planning, Building and Environmental Services. While the initiative involves significant environmental and infrastructure investment, it is structured as a policy implementation framework rather than a competitive procurement, with no formal contracting officer, COR, COTR, payment office, or federal accounting identifiers designated.
Environmental Consulting Services

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
1260 Shady Brook Vineyard Track I Agricultural Erosion Control Plan (ECPA) P25-00011-ECPA
Solicitation # P25-00011-ECPA
The project, identified as P25-00011-ECPA, involves the development of approximately 1.3 gross acres of vineyard within a 41.8-acre parcel located at 1260 Shady Brook Lane in Napa, California. Approved by Napa County on June 29, 2026, the scope of work includes land disturbing activities on slopes greater than 5%, the clearing of oak woodland and ruderal lands, earthmoving, land contouring, and the installation of agricultural infrastructure. The project is supported by a Mitigated Negative Declaration under CEQA, concluding that the development will not have a significant environmental effect provided specific mitigation measures are implemented. Key technical requirements include a soil loss analysis and hydrologic analysis to ensure that sediment delivery and peak runoff do not exceed pre-project levels. Environmental protections are central to the contract, requiring the preservation of oak woodlands, pre-construction surveys for Crotch's bumble bee between April and August, and the installation of protective fencing around Napa bluecurl and Green monardella populations. Additionally, a water availability analysis confirmed that groundwater demands for the vineyard are within the site's recharge capacity. The project is managed by Daniel and Deborah Chen and implemented by Applied Engineering, Inc., with oversight from the Napa County Planning, Building and Environmental Services Department.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Crush Partners Vineyard Track I Agricultural Erosion Control Plan Application (ECPA) P25- 00003-ECPA
Solicitation # P25-00003-ECPA
The Crush Partners Vineyard project, identified by permit P25-00003-ECPA, involves the development of approximately 18.3 gross acres of vineyard within a 27.98-acre parcel located on Wooden Valley Road in Napa, California. The scope of work includes clearing grassland, earthmoving with approximately 1,000 cubic yards of cut and fill, and the installation of erosion and runoff control measures on slopes greater than 5 percent. The project consists of 7.8 acres of replanted existing vineyard and 7.8 acres of new vineyard, totaling approximately 15.6 net planted acres. Performance requirements include maintaining a permanent cover crop and vineyard avenues with a minimum vegetation cover density of 75 percent to prevent soil loss and manage peak storm flow. The project was approved by Napa County on August 3, 2026, following a Negative Declaration under CEQA indicating no significant environmental impacts. Key technical requirements include a 35-foot setback from ephemeral streams, adherence to a grading season from April 1 through September 15, and preconstruction nesting bird surveys between February 1 and August 31. The project is supported by comprehensive analyses, including a Water Availability Analysis for groundwater use, a Landslide Hazard Evaluation, and a Biological Resources Reconnaissance Survey to protect oak woodlands and special-status species. Administrative terms specify that the applicant, Rob Lloyd, is responsible for all county processing fees, with payments due within 30 days of billing.
Environmental Consulting Services

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Desiree Vineyard Conservation Agricultural Erosion Control Plan (ECP) - P24-00028
Solicitation # P24-00028
The project involves the conversion of approximately 16.7 gross acres of moderate to steeply sloped land, ranging from 18% to 34% grade, with 4.2 acres exceeding 30% slope, into a vineyard located at 5681 Silverado Trail in Yountville, California, on parcel APN 039-040-042-000. The development will clear 13.28 acres of coast live oak woodland and 2.24 acres of non-native annual grassland, resulting in approximately 13.1 net planted acres distributed across ten vineyard blocks, while permanently preserving 26.56 acres of existing coast live oak woodland. This environmental review is tied to Agricultural Erosion Control Plan P24-00028 and is subject to Napa County Code Chapter 18.108, requiring compliance with erosion and sediment control standards, including minimum vegetative cover thresholds of 80% to 90% depending on the block, installation of permanent no-till cover crops by October 15 of the initial development year, and certification by a qualified professional. The site lies within the Napa River Watershed-Yountville Reach and the Agricultural Preserve zoning district, accessed via a private driveway from Silverado Trail, and all activities must adhere to regional stormwater management guidelines, USDA-NRCS hydrologic modeling standards using SCS TR-20 and Curve Number methods, and strict controls on materials, equipment emissions, and site cleanliness. Performance and compliance obligations include implementing erosion controls during and after construction, obtaining all necessary permits at the contractor’s expense, contacting Underground Service Alert before excavation, maintaining a clean worksite, and furnishing utilities such as power and water. Equipment must use CARB-approved fuels and EPA SmartWay-certified trucks, with preference for electric or grid-powered tools and a ban on diesel idling beyond 10 hours per day. Recycling targets must exceed Title 24 requirements by 15%, with materials required to contain at least 20% recycled or locally sourced content and low-carbon concrete used where feasible. A two-year warranty covers all workmanship and materials. The project schedule spans multiple phases, including pre-planting activity from April to October, annual pruning in January, sulfuring three times between May and July, weed control applications from March to October, and harvest operations lasting eight days. Submissions for review must
Environmental Consulting Services

POSTED

12 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS