Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Crush Partners Vineyard Track I Agricultural Erosion Control Plan Application (ECPA) P25- 00003-ECPA

Forecast
P25-00003-ECPAState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Crush Partners Vineyard project, identified by permit P25-00003-ECPA, involves the development of approximately 18.3 gross acres of vineyard within a 27.98-acre parcel located on Wooden Valley Road in Napa, California. The scope of work includes clearing grassland, earthmoving with approximately 1,000 cubic yards of cut and fill, and the installation of erosion and runoff control measures on slopes greater than 5 percent. The project consists of 7.8 acres of replanted existing vineyard and 7.8 acres of new vineyard, totaling approximately 15.6 net planted acres. Performance requirements include maintaining a permanent cover crop and vineyard avenues with a minimum vegetation cover density of 75 percent to prevent soil loss and manage peak storm flow. The project was approved by Napa County on August 3, 2026, following a Negative Declaration under CEQA indicating no significant environmental impacts. Key technical requirements include a 35-foot setback from ephemeral streams, adherence to a grading season from April 1 through September 15, and preconstruction nesting bird surveys between February 1 and August 31. The project is supported by comprehensive analyses, including a Water Availability Analysis for groundwater use, a Landslide Hazard Evaluation, and a Biological Resources Reconnaissance Survey to protect oak woodlands and special-status species. Administrative terms specify that the applicant, Rob Lloyd, is responsible for all county processing fees, with payments due within 30 days of billing.

General Info

Vineyard development of 18.3 acres in Napa, California, under permit P25-00003-ECPA.

Place of Performance

Wooden Valley Road and Monticello Road, Napa, CA, 94558

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → Napa County
Office AddressN/A
Contacts

Full Description

Show more
The proposed project involves the land disturbing activities on slopes greater than 5% associated with the proposed clearing of grassland within the proposed project area (i.e., clearing limits), earthmoving and the installation and maintenance of erosion and runoff control measures and agricultural infrastructure in connection with the development of approximately 18.3 gross acres of vineyard, including 7.8 acres of replanted existing vineyard and 7.8 acres of new vineyard (approximately 15.6 net planted acres) within three vineyard blocks, located within a 27.98 acre parcel.

Similar Contracts

Same NAICS industry code

More opportunities from California → Napa County

Same awarding agency

NAICS: 541620
SLED
Napa County Regional Climate Action and Adaptation PlanThe Napa County Regional Climate Action and Adaptation Plan is a coordinated regional initiative led by Napa County in partnership with the cities of American Canyon, Calistoga, Napa, St. Helena, and the Town of Yountville, aimed at reducing greenhouse gas emissions and enhancing climate resilience across the county. The plan targets key emission sources including vehicle travel, electricity use, natural gas consumption, and local land use practices, with measurable strategies organized across sectors such as energy, transportation, waste, and land use. Implementation timelines span from near-term actions starting in 2026 to long-term goals extending through 2045, with annualized cost estimates ranging from $386,085 in 2030 to $718,500 by 2045, reflecting projected investments in emissions reduction and adaptation measures. The plan includes specific project actions with clear performance targets and financial projections, though it does not conform to traditional federal procurement structures or include standard FAR clauses, contract line items, or formal bid evaluation criteria. The plan requires rigorous environmental compliance under CEQA, Cal/OSHA, CALGreen, and state and federal endangered species protections, with mandatory biological surveys, qualified biologist oversight, and habitat conservation measures. Construction and project activities must adhere to strict protocols including equipment decontamination to prevent invasive species spread, use of certified weed-free materials, installation of tire track stations, and implementation of spill prevention plans. All personnel must undergo environmental training, and work may be halted immediately if special-status species are detected. Mitigation efforts must include permanent conservation of affected lands via easements, and coordination with CDFW and USFWS is required for any project impacting protected species or habitats. Submission of proposals is due by August 31, 2026, via email, postal mail, or through an online portal, with oversight coordinated by Jesse Gutierrez, Principal Planner – Sustainability at Napa County’s Department of Planning, Building and Environmental Services. While the initiative involves significant environmental and infrastructure investment, it is structured as a policy implementation framework rather than a competitive procurement, with no formal contracting officer, COR, COTR, payment office, or federal accounting identifiers designated.
Environmental Consulting Services

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
1260 Shady Brook Vineyard Track I Agricultural Erosion Control Plan (ECPA) P25-00011-ECPA
Solicitation # P25-00011-ECPA
The project, identified as P25-00011-ECPA, involves the development of approximately 1.3 gross acres of vineyard within a 41.8-acre parcel located at 1260 Shady Brook Lane in Napa, California. Approved by Napa County on June 29, 2026, the scope of work includes land disturbing activities on slopes greater than 5%, the clearing of oak woodland and ruderal lands, earthmoving, land contouring, and the installation of agricultural infrastructure. The project is supported by a Mitigated Negative Declaration under CEQA, concluding that the development will not have a significant environmental effect provided specific mitigation measures are implemented. Key technical requirements include a soil loss analysis and hydrologic analysis to ensure that sediment delivery and peak runoff do not exceed pre-project levels. Environmental protections are central to the contract, requiring the preservation of oak woodlands, pre-construction surveys for Crotch's bumble bee between April and August, and the installation of protective fencing around Napa bluecurl and Green monardella populations. Additionally, a water availability analysis confirmed that groundwater demands for the vineyard are within the site's recharge capacity. The project is managed by Daniel and Deborah Chen and implemented by Applied Engineering, Inc., with oversight from the Napa County Planning, Building and Environmental Services Department.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Desiree Vineyard Conservation Agricultural Erosion Control Plan (ECP) - P24-00028
Solicitation # P24-00028
The project involves the conversion of approximately 16.7 gross acres of moderate to steeply sloped land, ranging from 18% to 34% grade, with 4.2 acres exceeding 30% slope, into a vineyard located at 5681 Silverado Trail in Yountville, California, on parcel APN 039-040-042-000. The development will clear 13.28 acres of coast live oak woodland and 2.24 acres of non-native annual grassland, resulting in approximately 13.1 net planted acres distributed across ten vineyard blocks, while permanently preserving 26.56 acres of existing coast live oak woodland. This environmental review is tied to Agricultural Erosion Control Plan P24-00028 and is subject to Napa County Code Chapter 18.108, requiring compliance with erosion and sediment control standards, including minimum vegetative cover thresholds of 80% to 90% depending on the block, installation of permanent no-till cover crops by October 15 of the initial development year, and certification by a qualified professional. The site lies within the Napa River Watershed-Yountville Reach and the Agricultural Preserve zoning district, accessed via a private driveway from Silverado Trail, and all activities must adhere to regional stormwater management guidelines, USDA-NRCS hydrologic modeling standards using SCS TR-20 and Curve Number methods, and strict controls on materials, equipment emissions, and site cleanliness. Performance and compliance obligations include implementing erosion controls during and after construction, obtaining all necessary permits at the contractor’s expense, contacting Underground Service Alert before excavation, maintaining a clean worksite, and furnishing utilities such as power and water. Equipment must use CARB-approved fuels and EPA SmartWay-certified trucks, with preference for electric or grid-powered tools and a ban on diesel idling beyond 10 hours per day. Recycling targets must exceed Title 24 requirements by 15%, with materials required to contain at least 20% recycled or locally sourced content and low-carbon concrete used where feasible. A two-year warranty covers all workmanship and materials. The project schedule spans multiple phases, including pre-planting activity from April to October, annual pruning in January, sulfuring three times between May and July, weed control applications from March to October, and harvest operations lasting eight days. Submissions for review must
Environmental Consulting Services

POSTED

12 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS