Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Desiree Vineyard Conservation Agricultural Erosion Control Plan (ECP) - P24-00028

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the conversion of approximately 16.7 gross acres of moderate to steeply sloped land, ranging from 18% to 34% grade, with 4.2 acres exceeding 30% slope, into a vineyard located at 5681 Silverado Trail in Yountville, California, on parcel APN 039-040-042-000. The development will clear 13.28 acres of coast live oak woodland and 2.24 acres of non-native annual grassland, resulting in approximately 13.1 net planted acres distributed across ten vineyard blocks, while permanently preserving 26.56 acres of existing coast live oak woodland. This environmental review is tied to Agricultural Erosion Control Plan P24-00028 and is subject to Napa County Code Chapter 18.108, requiring compliance with erosion and sediment control standards, including minimum vegetative cover thresholds of 80% to 90% depending on the block, installation of permanent no-till cover crops by October 15 of the initial development year, and certification by a qualified professional. The site lies within the Napa River Watershed-Yountville Reach and the Agricultural Preserve zoning district, accessed via a private driveway from Silverado Trail, and all activities must adhere to regional stormwater management guidelines, USDA-NRCS hydrologic modeling standards using SCS TR-20 and Curve Number methods, and strict controls on materials, equipment emissions, and site cleanliness. Performance and compliance obligations include implementing erosion controls during and after construction, obtaining all necessary permits at the contractor’s expense, contacting Underground Service Alert before excavation, maintaining a clean worksite, and furnishing utilities such as power and water. Equipment must use CARB-approved fuels and EPA SmartWay-certified trucks, with preference for electric or grid-powered tools and a ban on diesel idling beyond 10 hours per day. Recycling targets must exceed Title 24 requirements by 15%, with materials required to contain at least 20% recycled or locally sourced content and low-carbon concrete used where feasible. A two-year warranty covers all workmanship and materials. The project schedule spans multiple phases, including pre-planting activity from April to October, annual pruning in January, sulfuring three times between May and July, weed control applications from March to October, and harvest operations lasting eight days. Submissions for review must

General Info

Convert 16.7 acres to vineyard, preserve 26.56 acres oak woodland, comply with Napa County erosion and sustainability standards.

Agency

California → Napa County

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Wappo Hill Road and Silverado Trail, Yountville, CA, 94558

Set-Aside

NONE

Documents

(18)

Desiree Vineyard Conservation Agricultural Erosion Control Plan NOC

PDFnotice-of-completion

Exhibit D Greenhouse Gas Analysis for Boisset Vineyard Project

PDFother

Boisset Collection Wappo Hill Erosion Control Plan Revised Nov 2024

PDFerosion-control-plan

Notice of Intent to Adopt Mitigated Negative Declaration for Desiree Vineyard Project P24-00028

PDFnotice-of-intent

Exhibit C Soil Loss Analysis for Boisset Wappo Hill Track I ECP

PDFsoil-loss-analysis

P24-00028 Desiree FIG 1

PDF

P24-00028 Desiree FIG 3

PDF

Notice of Determination for Desiree Vineyard Erosion Control Plan P24-00028

PDFnotice-of-determination

Exhibit E Water Availability Analysis for Boisset Collection Vineyard Project

PDFwater-availability-analysis

Desiree Vineyard Agricultural Erosion Control Plan Revision Statement P24-00028-ECPA

PDFproject-revision-statement

Desiree Vineyard Conservation Agricultural Erosion Control Plan Summary

PDFenvironmental-summary

Initial Study for Desiree Vineyard Erosion Control Plan Application P24-00028-ECPA

PDFinitial-study

Napa County Erosion Control Plan Application P24-00028

PDFapplication-form

Biological Resources Reconnaissance Survey for 5681 Silverado Trail Napa County

PDFbiological-survey

Exhibit F Hydrologic Analysis for Boisset Wappo Hill Track I ECP

PDFhydrologic-analysis

Partial Response to Comments - Desiree Vineyard Biology

PDFresponse-letter

P24-00028 Desiree FIG 2

PDF

Exhibit A-2 Erosion Control Plan Narrative for 5681 Silverado Trail Vineyard Project

PDFsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Napa County
Office AddressN/A
Contacts
Dana Eleanor MorrisonSupervising Planner
Matthew BuenoPrincipal Engineer

Interested Companies (1)

Show more
DP & F Law
Napa, CA

Full Description

Show more
DESIREE VINEYARD: VINEYARD CONVERSION – ENVIRONMENTAL REVIEW of land disturbing activities on slopes greater than 5% associated with Agricultural Erosion Control Plan (ECP) #P24-00028, for the clearing of vegetation, earthmoving, and installation and maintenance of erosion control measures for conversion to vineyard of 16.7 gross acres of new vineyard (i.e., development area, proposed clearing limits) with approximately 13.1 net planted acres, within 10 vineyard blocks on land that is moderate to steeply sloped (18-34% slope, with approximately 4.2-acre occurring on slopes over 30%) on an approximately 53.7-acre parcel. The project would convert approximately 13.28 acres of coast live oak woodland and approximately 2.24 acres of non-native annual grassland and includes permanent preservation of approximately 26.56 acres of coast live oak woodland. The project is located at 5681 Silverado Trail, Napa (APN: 039-040-042-000). The parcel is accessed by a private driveway from Silverado Trail (an existing paved road), approximately 0.6-mile east of the Town of Yountville. The project site is located within the Napa River Watershed- Yountville Reach drainage and within the Agricultural Preserve (AP) zoning district.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is soliciting interest from Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations to receive a free American Water Works Association (AWWA) M36 water audit. The program is designed to help entities identify water loss objectives, particularly those failing to meet the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants can receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be prepared to enter into a contract within 15 to 30 days of the grant award. Responses to this Request for Interest are due by October 21, 2026.
BWR00 - Bureau of Water Resources

POSTED

about 8 hours ago

DEADLINE

in 30 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS