Backflow Preventer Installations by San Diego Unified Port District at Tenth Avenue Marine Terminal and National City Marine Terminal

Forecast
2024-110-KCState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → San Diego Unified Port District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego Unified Port District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Unified Port District
Office AddressN/A
Contacts
Kelly CunninghamPlanner I
Mahmoud AkhavainSr. Project Manager

Full Description

Show more
The proposed project would involve the removal of existing drainage facilities and installation of three (3) storm drain back flow preventers by San Diego Unified Port District (District) in the cities of San Diego, California and National City, California. The project proposes the installation of backflow preventers at storm drain outfalls in two locations: National City Marine Terminal (NCMT) and Tenth Avenue Marine Terminal (TAMT). Two (2) of the three installations would occur at NCMT and one (1) would occur at TAMT. Additional work for this project would include minor trenching and backfill for installation of the improvements, minor repaving of trenched areas, and added cleanouts and manholes for improved access and maintenance. Work to specifically complete the proposed project is outlined below: TAMT The backflow preventer at TAMT outfall T4-2.1 would be a 33-inch diameter in-line check valve, installed within the existing 33-inch diameter reinforced concrete pipe (RCP) storm drain, and between two (2) proposed Type A storm drain cleanouts. NCMT The first backflow preventer at NCMT outfall 004.1 would be a 30-inch diameter in-line check valve, installed within the existing 30-inch diameter RCP storm drain. It would be located approximately 8 inches from the face of the upstream cleanout and between two (2) proposed Type A storm drain cleanouts. The second backflow preventer at NCMT outfall 1003.1 would be a 72-inch diameter in-line check valve. The valve would be installed within the existing 72-inch RCP storm drain, approximately 2 feet from the face of the proposed modified 6x8 foot type B8 inlet. Additional work at this location would include replacement of the existing Type B8 inlet with a 6’x8’ modified Type B cleanout. The District would ensure the exiting grade and drainage pattern match the existing conditions. The proposed project requires the implementation of a traffic control plan during construction. Access to the terminals would not be affected as the construction area is limited and would be cordoned off. Equipment staging is to occur on-site but out of the way of working facilities as to not impact normal terminal operations. Port Maritime Operations has reviewed the proposed project plans and have not expressed concern with staging location or impacts to terminal operations. Construction of the proposed project is anticipated to occur in approximately March 2025 and would take approximately 7 months to complete. Hours of construction would be from 7:00 AM – 3:30 PM, Monday through Friday, unless otherwise requested and approved. Due to its nature and limited scope, construction of the proposed project would generate a minor amount of vehicle trips and would require limited use of equipment. Therefore, impacts related to air quality, greenhouse gas emissions, and transportation and traffic are not anticipated to occur. Furthermore, the District would be responsible for complying with all applicable federal, state, and local laws regarding construction demolition debris, hazards and hazardous materials, and stormwater.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 19 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, the installation of 500 meters of fencing, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. All work must comply with specific technical standards, including the Agency Guide to Cave and Mine Gates 2009, a physical mine hazards risk assessment, and species at risk surveys. The anticipated contract start date is January 7, 2026, with a primary term of two years and a one-year extension option. The procurement process involves a mandatory site visit on November 18, 2026, with a final response deadline of December 7, 2026. Bids are evaluated in three stages: a mandatory qualification review, a technical evaluation requiring a minimum score of 70 percent, and a commercial evaluation based on pricing. Technical scoring is weighted across project experience, roles and responsibilities, occupational health and safety requirements, and a plan for beneficial participation with Ontario Indigenous communities. Awardees must provide proof of WSIB coverage, insurance, and tax compliance, and must identify a dedicated project team including a Project Manager, a Professional Engineer, and various technical support leads.
Energy and Mines

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 20 hours ago

DEADLINE

in about 1 year
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS