Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Best Management Practices (BMP) Implementation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Corona, CA, 92882, USA

Set-Aside

NONE

Documents

This scope was carved out of 27-018SB.

The full solicitation package (20 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Citywide ADA And Sidewalk Improvements Program

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 35 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 20 documents on the prime contractFrom Citywide ADA And Sidewalk Improvements Program
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Corona, Public Works Department
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and maintains Best Management Practices (BMPs) for prime contractors on City of Corona Public Works projects to prevent pollution and manage runoff. Installs silt fences, wattles, and filter booms per project specifications. Must comply with local and state environmental regulations for public works. Delivers an installed and maintained BMP system.

Similar Contracts

Same NAICS industry code

NAICS: 561730
New
SLED
Landscaping Services
Solicitation # 8550
The Sacramento Area Sewer District (SASD) is soliciting proposals for comprehensive landscaping services across various facilities, including locations in Sacramento and Elk Grove, California. The scope of work encompasses turf maintenance, tree and shrub care, groundcover and annual bed maintenance, and general grounds maintenance such as litter removal and weed control. Contractors must adhere to strict safety and environmental standards, including OSHA and California State Division of Industrial Safety Orders, and must obtain prior approval for the use of herbicide weed control. All pesticides must be transported in original manufacturer containers and disposed of according to government regulations. The selection process is a three-phase evaluation where proposals are first screened for compliance and then scored on a 100-point basis, with the final award based on the best interest of SASD rather than price alone. Successful bidders must provide a 100 percent payment bond and certify compliance with the Americans with Disabilities Act. Additionally, the contract requires adherence to California Labor Code regarding prevailing wages and the submission of electronic certified payroll records. Proposals must be submitted in a sealed envelope and include a detailed company profile, task proposal sheets for the four landscaping areas, and a base proposal with monthly and annual costs.
Sacramento Area Sewer District (SASD)

POSTED

about 8 hours ago

DEADLINE

in 29 days
View Details
NAICS: 561730
New
SLED
Median And Sidewalk Landscape Maintenance
Solicitation # 20261123027
The City of Mill Valley is seeking proposals from licensed landscaping contractors holding a C61 or C27 State of California license to provide routine maintenance for medians, bulbouts, tree wells, and sidewalk planter strips. The scope of work encompasses pruning, weed removal, litter and leaf clearing, bark mulch replacement, irrigation system inspection and repair, and herbicide application. Contractors must provide all labor, equipment, and materials, with a strict prohibition on gas-powered leaf blowers. All work must adhere to the City's Integrated Pest Management Policy, Caltrans curb setback standards, and CA MUTCD standards for traffic control. Performance is subject to specific time constraints, generally between 7:00 A.M. and 3:30 P.M., with restricted windows during school sessions for specific areas. The contract features an initial one-year term with two optional two-year extensions, allowing for a maximum duration of five years. Award selection is based on the best value, evaluated through five equally weighted criteria: understanding of work, experience, staff qualifications, references, and the fee proposal. Deliverables include weekly progress reports and monthly invoicing. The City Representative will inspect all work, and any unsatisfactory performance must be corrected within 48 hours for public health threats or seven business days for routine matters. Proposals must be submitted via email to Jesus (Chuy) Beltran by December 17, 2026, and must not exceed 20 pages. There is no set-aside status for this solicitation.
City of Mill Valley

POSTED

about 8 hours ago

DEADLINE

in 23 days
View Details

More opportunities from California → City of Corona, Public Works Department

Same awarding agency

NAICS: 237310
New
SLED
Citywide ADA And Sidewalk Improvements Program
Solicitation # 27-018SB
The Citywide ADA and Sidewalk Improvements Program (Project No. ST-2027-05, NIB No. 27-018SB) is a solicitation by the City of Corona Public Works Department in California. The project requires a contractor to provide all labor, materials, and equipment to implement ADA and sidewalk improvements, with key deliverables including mobilization, traffic control, implementation of BMPs, public notification, and the installation of informational project signs. The contract will be awarded to the lowest responsive and responsible bidder based on the total for the Base Bid Schedule. Performance is expected to be completed within 40 working days following a 7-calendar-day move-in period, with normal working hours between 8:30 AM and 4:30 PM. The project is subject to strict federal and state regulations, including the Davis-Bacon and Related Acts and California Labor Code Section 1770, requiring the higher of the applicable federal or state prevailing wage rates. Additionally, the Build America, Buy America (BABA) requirements apply, mandating that all iron, steel, and construction materials be produced in the United States unless a waiver is granted. Bidders must submit electronic bids via the PlanetBids system, including a bid security of at least 10% of the total bid price, a non-collusion declaration, and a list of proposed subcontractors. There is no specified set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS