Manhole Adjustment and Utility Reconstruction

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 27-018SB.

The full solicitation package (20 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Citywide ADA And Sidewalk Improvements Program

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 35 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 20 documents on the prime contractFrom Citywide ADA And Sidewalk Improvements Program
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Corona, Public Works Department
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs adjustment and reconstruction of existing manholes for prime contractors on City of Corona Public Works projects to meet new ADA sidewalk grades. Protects manholes from debris, cleans water valves, and adjusts manhole rims to match new pavement and sidewalk elevations using concrete and manhole risers. Must comply with Section 403 Manhole Adjustment and Reconstruction. Delivers adjusted and reconstructed manholes.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

37 minutes ago

DEADLINE

in 7 days
View Details

More opportunities from California → City of Corona, Public Works Department

Same awarding agency

NAICS: 237310
New
SLED
Citywide ADA And Sidewalk Improvements Program
Solicitation # 27-018SB
The Citywide ADA and Sidewalk Improvements Program (Project No. ST-2027-05, NIB No. 27-018SB) is a solicitation by the City of Corona Public Works Department in California. The project requires a contractor to provide all labor, materials, and equipment to implement ADA and sidewalk improvements, with key deliverables including mobilization, traffic control, implementation of BMPs, public notification, and the installation of informational project signs. The contract will be awarded to the lowest responsive and responsible bidder based on the total for the Base Bid Schedule. Performance is expected to be completed within 40 working days following a 7-calendar-day move-in period, with normal working hours between 8:30 AM and 4:30 PM. The project is subject to strict federal and state regulations, including the Davis-Bacon and Related Acts and California Labor Code Section 1770, requiring the higher of the applicable federal or state prevailing wage rates. Additionally, the Build America, Buy America (BABA) requirements apply, mandating that all iron, steel, and construction materials be produced in the United States unless a waiver is granted. Bidders must submit electronic bids via the PlanetBids system, including a bid security of at least 10% of the total bid price, a non-collusion declaration, and a list of proposed subcontractors. There is no specified set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

about 6 hours ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS