Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on April 11, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BID 24-18 Evanston Dog Beach Access

Closed
ITB-BID 24-18-0-2024/litState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 9 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The project involves constructing a new ADA-compliant access path and boardwalk to the Evanston Dog Beach along Lake Michigan, between Church Street and Clark Street in Evanston, Illinois. Additionally, the scope includes building a protective revetment along the beach section, as well as installing fencing, electronic gates, lighting, and other ancillary features as detailed in the project documents. The contract aims to enhance accessibility and safety for visitors while protecting the shoreline. Bids for this project are due by May 14, 2024, and the solicitation was posted on April 11, 2024. The project is managed by the City of Evanston under the Illinois agency, with the NAICS code 237990 indicating a construction-related service. Interested parties can find more details through the provided demand star link.

General Info

Agency

Illinois → City of Evanston

Place of Performance

IL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → City of Evanston
ContactsNo contacts available
OfficeN/A
Organization / Agency
Illinois → City of Evanston
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Work on this project includes construction of a new ADA compliant access path and boardwalk to the Evanston Dog Beach located along Lake Michigan between Church Street and Clark Street in Evanston, Illinois. Also included is construction of a protective revetment along the Dog Beach section of the project, and installation of fencing, electronic gates, lighting, and all other ancillary items shown in the project documents.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS