Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

BIKE TRAIL PEDESTRIAN IMPROVEMENTS PROJECT CIP 1049

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Vacaville is preparing to undertake the Bike Trail Pedestrian Improvements Project CIP 1049, which focuses on enhancing pedestrian safety at three key trail crossings: Arlene Drive west of Arlene Way, Briarwood Drive south of Florence Drive, and Fruitvale Road between Ridgewood Drive and Parkridge Drive. The project will involve the full replacement and reconstruction of these crossings with new crosswalks, Rapid Rectangular Flashing Beacons, and updated signing and striping to meet current ADA compliance standards. These improvements aim to provide safer, more accessible passage for pedestrians using the city’s trail network. The initiative is part of the city’s broader efforts to upgrade public infrastructure and prioritize nonvehicular transportation safety. The project is listed as a forecast with a posted date of June 4, 2026, and is managed under the City of Vacaville’s Department of Public Works, with Albert Enault, Senior Planner, serving as the primary point of contact. All work will occur within Vacaville, California, specifically at the designated locations identified in the scope, and no bidding or procurement details are currently available as the solicitation number remains unassigned. The city is preparing this initiative for future acquisition, with the intent to engage contractors to implement the necessary infrastructure upgrades that align with state and federal accessibility regulations.

General Info

Vacaville to upgrade three trail crossings with new crosswalks, flashing beacons, and ADA-compliant signage by 2026.

Agency

California → City of Vacaville

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Arlene Dr, Briarwood Dr, Fruitvale Rd, Vacaville, CA, 95688

Set-Aside

NONE

Documents

(1)

CIP 1049 - Notice of Exemption Filing for Bike Trail Pedestrian Improvements Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Vacaville
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Vacaville
Office AddressN/A
Contacts
Albert EnaultSenior Planner

Full Description

Show more
The project involves the replacement and reconstruction of three trail crossings located at: (1) Arlene Drive west of Arlene Way; (2) Briarwood Drive south of Florence Drive; and (3) Fruitvale Road between Ridgewood Drive and Parkridge Drive. The scope involves the installation of crosswalks, Rapid Rectangular Flashing Beacons (RRFBs), and associated signing and striping to ensure city facilities are compliance with ADA requirements.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process improvements to remove per- and polyfluoroalkyl substances from surface water supplies. The project is solicited under the number LACSD Surface Water PFAS Removal Project No. 251 CA and is open to Disadvantaged Business Enterprises as part of a Department of Transportation set-aside initiative, aiming to promote equitable participation in infrastructure development. Work must be executed in accordance with federal and state regulatory requirements for water quality and environmental protection, with performance localized to the two treatment plant sites in California. Solicitation was posted on August 8, 2026, with responses due by September 3, 2026, and the North American Industry Classification System code 237310 applies, indicating it is a water and wastewater plant construction project. The contracting entity is Pyramid Building & Engineering, Inc., serving as both the organization name and agency, with primary contact for inquiries being John Garrison, reachable via phone or email. All proposals must align with technical specifications for PFAS removal technologies and integration into existing plant infrastructure, ensuring compliance with long-term water safety standards and operational reliability.
Pyramid Building & Engineering, Inc.

POSTED

about 2 hours ago

DEADLINE

in 25 days
View Details