Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

BIKE TRAIL PEDESTRIAN IMPROVEMENTS PROJECT CIP 1049

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Vacaville is preparing to undertake the Bike Trail Pedestrian Improvements Project CIP 1049, which focuses on enhancing pedestrian safety at three key trail crossings: Arlene Drive west of Arlene Way, Briarwood Drive south of Florence Drive, and Fruitvale Road between Ridgewood Drive and Parkridge Drive. The project will involve the full replacement and reconstruction of these crossings with new crosswalks, Rapid Rectangular Flashing Beacons, and updated signing and striping to meet current ADA compliance standards. These improvements aim to provide safer, more accessible passage for pedestrians using the city’s trail network. The initiative is part of the city’s broader efforts to upgrade public infrastructure and prioritize nonvehicular transportation safety. The project is listed as a forecast with a posted date of June 4, 2026, and is managed under the City of Vacaville’s Department of Public Works, with Albert Enault, Senior Planner, serving as the primary point of contact. All work will occur within Vacaville, California, specifically at the designated locations identified in the scope, and no bidding or procurement details are currently available as the solicitation number remains unassigned. The city is preparing this initiative for future acquisition, with the intent to engage contractors to implement the necessary infrastructure upgrades that align with state and federal accessibility regulations.

General Info

Vacaville to upgrade three trail crossings with new crosswalks, flashing beacons, and ADA-compliant signage by 2026.

Agency

California → City of Vacaville

Place of Performance

Arlene Dr, Briarwood Dr, Fruitvale Rd, Vacaville, CA, 95688

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Vacaville
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Vacaville
Office AddressN/A
Contacts
Albert EnaultSenior Planner

Full Description

Show more
The project involves the replacement and reconstruction of three trail crossings located at: (1) Arlene Drive west of Arlene Way; (2) Briarwood Drive south of Florence Drive; and (3) Fruitvale Road between Ridgewood Drive and Parkridge Drive. The scope involves the installation of crosswalks, Rapid Rectangular Flashing Beacons (RRFBs), and associated signing and striping to ensure city facilities are compliance with ADA requirements.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237310
New
Federal
Jake Rocks Road Reconstruction
Solicitation # 127EAX27Q0003
Solicitation 127EAX27Q0003 is a Request for Quotation issued by the USDA Forest Service for the Jake Rocks Road Reconstruction project in the Bradford Ranger District of the Allegheny National Forest, located in Warren, Pennsylvania. This total small business set-aside under NAICS 237310 requires a contractor to provide all equipment, labor, and materials to rehabilitate approximately 2.97 miles of designated roads, specifically Forest Road 492 and 492A, as well as two recreational parking areas, two overlook parking areas, and two pull-off areas. The scope of work includes milling and overlaying asphalt, full depth replacement and spot repairs, culvert removal and installation, ditch work, guide rail replacement, the installation of erosion and sedimentation controls, and the construction of accessibility features. All work must adhere to FP-14 Standard Specifications, Forest Service Supplemental Specifications, and MUTCD standards for signage. The contract period of performance runs from November 2, 2026, to September 30, 2027, with a delivery requirement of 135 days after the notice to proceed. Award will be based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, performance schedule, and a record of three similar projects completed within the last three years. Proposals must be submitted as separate PDF files via email to the designated points of contact by October 26, 2026, at 1:00 PM Eastern Time. Required submission documents include a signed SF1442, a priced Schedule of Items, a technical proposal, and a bid guarantee. The project is subject to the Davis-Bacon Act and requires compliance with Buy American requirements and specific environmental protocols, including the cleaning of equipment to prevent the spread of invasive species on Forest Service lands.
Csa Southwest 7 Usda-Fs

POSTED

about 4 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS