This Solicitation opportunity from Department Of Agriculture was posted on September 5, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Billygrunt Stewardship project, solicitation number AG-9A63-S-08-0107, is a total small business set-aside issued by the USDA Forest Service Tahoe National Forest. Located in the Truckee Ranger District of California, the project focuses on biomass treatment, mechanical thinning, and piling across multiple units, including specific alder mechanical thinning operations. The scope of work encompasses a timber sale covering 351 acres, with detailed volume summaries for sawtimber, pulplogs, and limbs and tips across various species. Project boundaries and critical constraints, such as water sources and aspen restoration areas, are defined across several work area maps and exhibits.
A significant portion of the contract is dedicated to comprehensive road maintenance and infrastructure requirements governed by the T-800 series specifications. These technical standards mandate strict protocols for surface blading, ditch cleaning, slide and slump repair, surfacing repair, and the installation of waterbars. Additionally, the contract requires dust abatement using approved materials, the maintenance of drainage structures, and the removal of roadway vegetation to ensure safe vehicular access. Financial schedules and deposit rates are established for surface replacement and recurrent maintenance to ensure the long-term integrity of the forest road system.
XLS, High priority: read this first8 pages · specifications
HighAI Summary for Billygrunt IRSC Road Maintenance and Deposit Schedules: Technical specifications and financial schedules for road maintenance associated with the Billygrunt Timber Sale (May 1983). The document includes a list of applicable road maintenance specifications (T-800 series), road lists, detailed deposit rate calculations for surface replacement and recurrent/deferred maintenance, dust abatement plans, and a comprehensive road maintenance plan for the Tahoe National Forest.
DOC
DOC, High priority: read this first80 pages · rfq
HighAI Summary for Billygrunt Stewardship - AG-9A63-S-08-0107: Solicitation (Standard Form 1449) issued by the USDA Forest Service, Tahoe National Forest, for the Billygrunt Stewardship project. The document outlines requirements for biomass treatment, thinning, and piling across multiple units, including a schedule of mandatory and optional items and timber product removal rates. Due date for offers was 09/15/2008.
XLS
XLS, High priority: read this first1 page · specifications
HighAI Summary for Billygrunt Timber Sale Volume Summary (2008): Exhibit E provides a detailed volume summary for the Billygrunt Timber Sale (2008), covering 351 acres. It includes quantitative data on sawtimber, pulplogs, and limbs/tips, broken down by unit number and species (PP/JP, WF, LP), specifying volumes in MBF, CCF, and GT.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Exhibit B - Emigrant West Work Area Map (Billygrunt IRSC): A technical map exhibit (Exhibit B) for the Billygrunt Stewardship within the Truckee Ranger District of the Tahoe National Forest. Dated July 2008, the document defines work area boundaries, acreage for specific units (e.g., 85040 21, 85040 09), and identifies critical constraints such as water sources, public use restrictions, and aspen restoration areas.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Exhibit C - Billygrunt Stewardship Work Area Map: A technical map exhibit for the Billygrunt Stewardship project within the Truckee Ranger District of the Tahoe National Forest. The document provides a legend for unit boundaries, water sources, road construction, and protected areas, based on July 2008 geospatial data.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Exhibit D - Billygrunt Stewardship Work Area Map: A work area map (Exhibit D) for the Billygrunt Stewardship project within the Truckee Ranger District of the Tahoe National Forest. The document identifies specific project areas (85040 26, 27, and 28) totaling 172 acres, including unit boundaries, water sources, and temporary road construction details.
DOC
DOC, High priority: read this first1 page · sow
HighAI Summary for Exhibit F - Alder Mechanical Thinning: This document is Exhibit F, focusing on Alder Mechanical Thinning specifications.
DOC
DOC, High priority: read this first1 page · specifications
HighAI Summary for Exhibit G: Alder Mechanical Thinning: Exhibit G regarding Alder Mechanical Thinning, likely containing technical specifications or a scope of work for mechanical thinning operations.
RTF
RTF, High priority: read this first1 page · specifications
HighAI Summary for Specification T-800 Definitions: This document provides the official definitions for terms and pronouns used in Specifications T-801 through T-811, specifically relating to road maintenance projects. It defines technical terms such as base course, culverts, roadbed, and traveled way to ensure consistent interpretation of maintenance requirements and agreements.
RTF
RTF, High priority: read this first1 page · specifications
HighAI Summary for Specification T-801 Slide and Slump Repair: Technical specification T-801 (dated 5/83) detailing the requirements for slide removal and slump repair. It defines the scope of work including excavation, hauling, and compaction of materials, and specifies the responsibilities of the Purchaser versus the Forest Service regarding repair volumes and disposal sites.
RTF
RTF, High priority: read this first1 page · specifications
HighAI Summary for Specification T-802 Ditch Cleaning: Technical specification T-802 (dated 5/83) detailing the requirements for ditch cleaning. It defines the process of removing and disposing of slough material to ensure free-draining waterways and provides instructions for the disposal or blending of removed materials.
RTF
RTF, High priority: read this first1 page · specifications
HighAI Summary for Specification T-803 Surface Blading: Technical specification T-803 (dated 5/83) detailing the requirements for surface blading of native or aggregate roadbeds. It outlines procedures for maintaining drainage, repairing berms, cleaning bridge decks and ditches, and managing material displacement to ensure trafficability and proper road surface maintenance.
RTF
RTF, High priority: read this first1 page · specifications
HighAI Summary for Specification T-804 Surfacing Repair: Technical specification T-804 detailing the requirements for surfacing repairs, including pothole repair, skin patches, and asphalt berm restoration. It covers material sourcing from approved commercial or Forest Service areas and provides specific technical instructions for excavation depths, compaction methods, and disposal of removed materials.
RTF
RTF, High priority: read this first1 page · specifications
HighAI Summary for Specification T-805 Drainage Structures: Technical specification T-805 detailing the requirements for maintaining drainage structures, including inlet/outlet channels, riprap, and trash racks. It specifies material conformity and the removal of foreign materials and vegetative growth to ensure proper flow patterns.
RTF
RTF, High priority: read this first2 pages · specifications
HighAI Summary for Specification T-806 Dust Abatement: Technical specification T-806 (dated 12/86) detailing the requirements for dust abatement on traveled ways. It covers material standards (bituminous materials, lignin sulfonate, magnesium chloride), testing requirements, application methods, compaction standards, and weather limitations for the Forest Service.
RTF
RTF, High priority: read this first1 page · specifications
HighAI Summary for Specification T-807 Roadway Vegetation: Technical specification T-807 (Exhibit O) detailing the requirements for the removal of brush and trees within roadway limits to ensure vehicular travel and maintenance operations are not impeded.
RTF
RTF, High priority: read this first1 page · specifications
HighAI Summary for Specification T-809 Waterbars: Technical specification T-809 (dated 5/83) detailing the requirements for installing and removing waterbars in roadbeds. It specifies that installation must follow the road maintenance plan and attached drawings, and that excavated material must be used and compacted using heavy equipment.
DOC
DOC, Low priorityspecifications
LowAI Summary for Exhibit A - Vicinity Map (Alder Biomass Mechanical Thinning): A vicinity map exhibit (Exhibit A) for the Alder Biomass Mechanical Thinning project, located within Section J of the procurement documentation.
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
PhaseAwarded
Posted
Presolicitation
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Agriculture → Tahoe National Forest