Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Bishop MTS Utilities and Fencing

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bishop MTS Utilities and Fencing project, managed by Caltrans District 6, involves the expansion of the Caltrans Bishop Maintenance Station in Inyo County, California. The scope of work includes the installation of approximately 1700 feet of 6-foot chain link fencing around a sub-parcel to connect with the existing perimeter fence. Additionally, the project requires the construction of a 24-foot driveway with a gate for access from Spruce Street, which necessitates a curb cut in the City of Bishop sidewalk. Utility work consists of pavement trenching approximately 200 feet long and 36 inches deep to bring Southern CA Edison electrical and City of Bishop water and sewer hookups to the property line. The project is classified under NAICS code 237310 and is located near State Route 6. An encroachment permit from the City of Bishop is required for the driveway and utility installations. From an environmental standpoint, the project has been granted a Categorical Exemption, Class 1, under section 15301, indicating that no significant environmental impacts are expected. All work must adhere to accepted Caltrans standard practices and environmental commitments. The primary point of contact for the project is Emily Flink, an Environmental Planner.

General Info

Caltrans District 6 project for fencing, driveway, and utility installation in Bishop, California.

Agency

California → Caltrans, District 6 - Fresno/Bakersfield

Place of Performance

Spruce Street/ Wye Road, Bishop, CA, 93514

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 6 - Fresno/Bakersfield
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 6 - Fresno/Bakersfield
Office AddressN/A

Full Description

Show more
The project will construct a chain link fence, driveway, and bring utility hookups to the property line for the Caltrans Bishop Maintenance Station expansion. Approximately 1700 feet of 6-foot chain link fencing will be placed around the sub-parcel, joining the existing Bishop Caltrans Maintenance Station perimeter fence. A curb cut in City of Bishop sidewalk will be required to construct a 24-foot driveway, with gate, to provide access the parcel from Spruce Street. Pavement trenching approximately 200 feet long and 36 inches deep is required to bring the City of Bishop Water/Sewer and Southern CA Edison Electrical hookups to the property line. An encroachment permit from the City of Bishop will be obtained for utility work and driveway construction.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
T6026-1 North River Gap Sidewalk Project
Solicitation # 27-018
The City of Sandy Springs is soliciting bids for the T6026-1 North River Gap Sidewalk Project, which involves the construction of approximately 300 linear feet of sidewalk on the east side of North River Drive, spanning from 100 North River Drive to 501 North River Parkway. The scope of work includes site preparation through the removal of granite, concrete, and vegetation, the supply and grading of clean fill and topsoil, the reconstruction of two driveways, and the installation of ADA-compliant ramps. All work must adhere to Georgia Department of Transportation (GDOT) Standard Specifications and the Manual of Uniform Traffic Control Devices (MUTCD), with materials sourced from GDOT certified suppliers. The project requires a 75-day performance period from the issuance of the Notice to Proceed, with work permitted on weekdays from 8:00 AM to 5:00 PM and traffic-interfering activities restricted to 9:00 AM to 4:00 PM. Bids for solicitation 27-018 must be submitted by January 7, 2027. Required documentation includes a bid schedule, price certification, drug-free workplace certification, and a Georgia Security and Immigration Compliance Act affidavit. A bid bond is mandatory if the bid price exceeds $100,000, and the successful contractor must provide performance and payment bonds, as well as a certificate of insurance. Key deliverables include before-and-after project videos, independent testing for concrete and sub-grade compaction, and a two-year warranty on sod installation. There is no specified set-aside status for this solicitation.
City of Sandy Springs

POSTED

about 8 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
International
EN27TFM021 South Peter FSR Extension - Arrow
Solicitation # EN27TFM021
The EN27TFM021 South Peter FSR Extension - Arrow is a Major Works Contract for forest road construction issued by the BC Timber Sales Branch of the Province of British Columbia. The scope of work involves mobilization and demobilization, site preparation including clearing and debris disposal, and roadway and drainage excavation such as embankments, ballasting, and excavation in solid rock. The project is located in British Columbia, Canada, and requires the contractor to commence work immediately upon execution of the agreement, with completion dates defined in the contract schedules. Award is based on identifying the lowest compliant bidder, with evaluation factors focusing on the bidder's technical experience, qualifications, and possession of necessary machinery and equipment. Key requirements include mandatory BC Forest Safety Council SAFE certification for all subcontractors and adherence to strict camp standards regarding health, sanitation, and water safety. The contract is administered by the Minister of Forests through the Kootenay Business Area, with payments typically processed between 30 to 60 days after invoice certification. Bidders must provide bid security, and the successful contractor is required to provide performance and labour and material payment bonds, as well as WorkSafe BC coverage.
BC Timber Sales Branch

POSTED

about 9 hours ago

DEADLINE

in 21 days
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS