Bldg. 1870 HVAC Upgrades and Repairs, WSMR
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract for Building 1870 at White Sands Missile Range entails comprehensive HVAC upgrades and repairs, including replacing the existing air conditioning system and converting all office space evaporative coolers to refrigerated air systems for improved climate control. New ceilings and lighting will be installed throughout the office areas, while the storage section will receive new evaporative coolers with proper air pressure relief mechanisms. A critical component of the work is the physical separation of the office cooling zone from the storage area to ensure distinct thermal environments and operational efficiency. All work must strictly adhere to local, state, and federal regulations, as well as applicable building and mechanical codes. The contract was awarded as an 8(a) Sole Source under NAICS code 238220, managed by the U.S. Army Corps of Engineers Albuquerque District, with performance to occur at the White Sands Missile Range in New Mexico. Glenda D. Kohlieber of the Department of Defense is the primary point of contact for this procurement.
General Info
Agency
Contract Value
$4,220,030.83NAICS
Place of Performance
White Sands Missile Range, NM, 88002, USASet-Aside
Awardee
Award Issued Date
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Repair the current air conditioning system by replacement for building 1870. Replace the evaporative cooler system in the office spaces with refrigerated air. Install new ceilings and lights in the office areas. Remove and install new evaporative coolers for the storage area section and provide proper air pressure relief. Separate the office cooling space from the storage air spa. Work shall comply with all specific installation, local, State, and Federal laws and regulations, and applicable code requirementsRepair the current air conditioning system by replacement for building 1870. Replace the evaporative cooler system in the office spaces with refrigerated air. Install new ceilings and lights in the office areas. Remove and install new evaporative coolers for the storage area section and provide proper air pressure relief. Separate the office cooling space from the storage air spa. Work shall comply with all specific installation, local, State, and Federal laws and regulations, and applicable code requirements
