Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on January 30, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Boiler #6 Modernization Project

Closed
WPMB-11-5028Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238220
New
WOJC - Multi-Building Plumbing Leak Repair Project
Solicitation # WOJC – Multi-Building Plumbing Leak Repair Project
Education and Training Resources is seeking quotes for a subcontracting opportunity to perform multi-building plumbing leak repairs at the Westover Job Corps Center in Chicopee, Massachusetts. The scope of work includes replacing leaking shower P-trap drain pipes in Rooms 123 and 213, repairing a cracked drain pipe in the pipe chase of Room 216, and replacing approximately ten linear feet of leaking heat pipe sections in both the Administration Building and King Hall. All work must conform to the Massachusetts State Plumbing Code and International Plumbing Code, utilizing new commercial-quality materials suitable for hydronic heating service. The contractor is responsible for removing all debris and repairing any facility damage caused during performance at no additional cost. Interested bidders must submit a detailed quote by October 30, 2026, including a comprehensive cost breakdown of labor and materials, a proposed service schedule, and a bid validity period of at least 60 days. Required documentation includes a current SAM.gov UEI number, active registration, Massachusetts licensing, a W-9, a signed ETR Vendor Acknowledgement Form, and certificates of insurance. This is an SBA set-aside opportunity for various small business categories. Award selection is not based solely on the lowest price; ETR will evaluate cost, qualifications, and administrative compliance. The project is subject to federal regulations, including the Davis-Bacon Act, Service Contract Act, and specific FAR clauses regarding anti-lobbying and debarment. Performance bonds are required for projects exceeding 35,000 dollars.
Westover Job Corps Center

POSTED

about 15 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
MI 2026-14 Emergency Heating and Air Conditioning Services
Solicitation # MI 2026-14
Adams and Associates, Inc., contracting for the U.S. Department of Labor, is soliciting bids for emergency heating and air conditioning services at the Miami Job Corps Center in Florida. The period of performance runs from November 1, 2026, to October 31, 2027. The selected vendor will provide emergency HVAC repairs, with pricing required for non-emergency daytime services (8:00 am to 4:30 pm) as well as emergency, weekend, and holiday rates. As a federally funded facility, the Center is entitled to GSA pricing. Award decisions will be based on the most responsible bidder, considering cost, licensure, experience, and insurance capabilities. Eligible bidders must be small businesses or certified socioeconomic categories, including VOSB, SDVOSB, WOSB, and HUBZone. Mandatory requirements include a valid Unique Entity ID (UEI), active SAM.gov registration, and all necessary Florida state business and employee licenses. Vendors must maintain Workers Compensation, Automobile Liability, and Comprehensive General Liability insurance of at least $1,000,000 per occurrence. The contract is subject to the Service Contract Act (Wage Determination No. 2005-2248) and the Davis-Bacon Act, with a minimum wage of $13.65 per hour applicable through December 31, 2026. Bids must be submitted on company letterhead by October 23, 2026, and include a W9, Vendor Questionnaire, Authority to Commit, and a certificate of insurance. Payment terms are NET 30 days. Personnel performing work on-site must adhere to strict security protocols, including searches and a prohibition on fraternization with students and staff. All deliveries must be coordinated through the Center's security personnel.
Miami Job Corps Center

POSTED

about 15 hours ago

DEADLINE

in 1 day
NAICS: 238220
New
CBP6585 Bldg. 22 HVAC Replacement
Solicitation # CBP6585
Management & Training Corporation (MTC) is seeking bids for a fixed-price, single lump sum subcontract to replace the HVAC equipment serving Building 22 at the San Diego Job Corps Center in Imperial Beach, California. The scope of work includes the removal of existing equipment and the installation of a new 5-ton condenser with a suitable pad, a new furnace, a 5-ton evaporator coil, a fused electrical disconnect, an electrical whip, and a new condensate drain line. The contractor is responsible for providing all labor, materials, and supervision, ensuring the system is fully operational and compliant with applicable codes. Key deliverables include two sets of operation and maintenance manuals and manufacturer and installer warranties. The estimated price range for this project is between 0 and 25,000 dollars. Bids are due by October 28, 2026, and must be submitted using the MTC Bid for Lump Sum Contract form, accompanied by a detailed cost breakout, proof of insurance, and three references. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. For bids equal to or greater than 25,000 dollars, a bid bond of 20 percent of the base bid is required, and the awarded contractor must provide performance and payment bonds for 100 percent of the contract price from a surety with at least an A- rating. This opportunity is set aside for small businesses under NAICS 238220. Award decisions will be based on overall best value. Compliance requirements include the Davis-Bacon Act for prevailing wages, OSHA safety standards for personal protective equipment, and various Federal Acquisition Regulations, including those regarding first-tier subcontractor information and the submission of form SF 1413. Awarded contractors must provide a Unique Entity ID (UEI) number and complete the MTC Supplier Self-Certification packet. Payment will be made via progress payments based on percentage completion, utilizing AIA Document G702 and G703 or equivalent forms.
San Diego Job Corps Center

POSTED

about 15 hours ago

DEADLINE

in 8 days
NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
The Muhlenberg Job Corps Center, operated by Insights Training Group LLC, is soliciting fixed-price quotes from qualified HVAC and mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The scope of work includes the inspection, repair, and replacement of various components across eight exhaust fans, specifically addressing failed louver actuators, motor replacements, selector switch repairs, and the relocation of a thermostat. Contractors must provide detailed line-item pricing for each fan, separate pricing for system-wide component replacements, and detailed costs for labor and materials. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be granted to a single responsible offeror based on technical acceptability and the lowest price. Key requirements include compliance with the Federal Acquisition Regulation, Davis-Bacon Act labor standards, and OSHA and EPA regulations. Contractors must be registered and licensed in the State of Kentucky, provide proof of insurance, and demonstrate the ability to secure performance and payment bonding. Administrative requirements include the submission of weekly certified payroll with every invoice and the provision of Materials Safety Data Sheets for all products used on site. The project involves a substantial completion process requiring a walk-through and final acceptance inspection. Quotes must be submitted electronically to the purchasing agent by October 30, 2026, and must include a completed New Vendor Profile and W-9 for any subcontractors.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 15 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Furnace Replacement
Solicitation # 26-17
Management & Training Corporation (MTC), operator of the Tongue Point Job Corps Center in Astoria, Oregon, is soliciting bids for a fixed-price, lump sum contract to replace furnaces and thermostats in three staff houses. The project involves Quarters F (3,786 sq/ft, propane), Quarters P (1,100 sq/ft, natural gas), and Quarters Q (2,280 sq/ft, propane). Required equipment must be Carrier Comfort Series or an equivalent household good grade with at least a 96% efficiency rating, sized at approximately 80,000btu. Installations must include new transitions to existing ducting, gas regulators, electrical and condensate pump kits, and intake/exhaust venting. A lifetime warranty on the heat exchanger and a minimum 10-year warranty on parts are mandatory. The estimated price range for this solicitation is between $0 and $25,000, with bids due by October 21, 2026. This is a small business set-aside opportunity under NAICS code 238220. Award decisions will be based on overall best value. Contractors must comply with the Davis-Bacon Act and applicable prevailing wage determinations, providing certified payroll weekly. Bid and performance bonds are only required for bids equal to or exceeding $25,000. Submission requirements include a signed MTC bid form, a detailed cost breakout on company letterhead, a Unique Entity Identification number, and a completed supplier self-certification packet. Final acceptance is contingent upon functional testing, the submission of operation and maintenance manuals, and a final inspection.
Tongue Point Job Corps

POSTED

about 15 hours ago

DEADLINE

in about 14 hours
NAICS: 238220
New
Centennial Dry Sprinkler System & Compressor Replacement Services
Solicitation # centennial-dry-sprinkler-system-compressor-replacement-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide dry-type sprinkler system and compressor replacement services at the Centennial Job Corps Center in Nampa, Idaho. The project scope involves the demolition and removal of the existing dry system distribution piping network and failing air compressor across the Men's Dormitory (Building CM), Women's Dormitory (Building CW), and Recreation Building (Building D). The selected licensed fire sprinkler contractor must eliminate system leaks and install a new compressor sized according to NFPA standards to prevent equipment short-cycling. All work must adhere to NFPA 25 (2023 Edition) and local, state, and national codes, with a required performance period of 30 consecutive business days following the Notice to Proceed. Bids are due by December 1, 2026, and must be based on a mandatory site visit. Evaluation is based on overall best value and bidder responsiveness. For bids totaling $25,000 or more, a bid bond of 20% of the base bid is required at submission, and the awarded contractor must provide performance and payment bonds from an A-rated surety within five business days of the Intent to Award. Compliance requirements include adhering to Davis-Bacon prevailing wage rates for Idaho, submitting weekly certified payroll reports, and providing a 12-digit UEI number. Additionally, first-tier subcontractors with awards exceeding $45,000 must disclose debarment status per FAR 52.209-6, and contracts valued at $40,000 or more are subject to FFATA reporting.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 15 hours ago

DEADLINE

in about 1 month
NAICS: 238220
New
MJCC HVAC BLD. 1403-04 B HALL
Solicitation # mjcc-hvac-bld-1403-04-b-hall
Insights Training Group LLC, on behalf of the Muhlenberg Job Corps Center, is soliciting fixed-price quotes for an HVAC project at Building 1403-04 B Hall in Kentucky. The scope of work requires the contractor to furnish and install two 4-ton Trane split systems with a minimum 17 SEER rating, two 95% AFUE high-efficiency gas furnaces, and matching indoor evaporator coils using R-454B refrigerant. Additional requirements include the installation of a Honeywell Pro 8000 programmable thermostat, new refrigerant line sets, condensate drain piping, and pumps. The project must be completed within 45 days of award, and the contractor is responsible for all inspections, testing, and providing necessary operating and maintenance manuals. The contract will be awarded to the responsible offeror who is technically acceptable and provides the lowest price. To be considered, bidders must be registered and licensed in the State of Kentucky, verified through the SAM portal, and provide a minimum 90-day bid guarantee along with proof of ability to secure performance and payment bonding. Compliance with the Davis-Bacon Act and Certified Payroll Wage Rate requirements is mandatory, with weekly certified payroll and a signed Statement of Compliance required for invoice acceptance. All work must adhere to local codes, manufacturer specifications, OSHA, and EPA regulations. Quotes are due by October 30, 2026, and must include detailed labor and materials costs, a W-9, and a New Vendor Profile.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 15 hours ago

DEADLINE

in 9 days
NAICS: 238220
New
Roswell JCC – Male Dormitory Bldg. Water Source Heat Pump Replacement (20 units)
Solicitation # roswell-jcc-male-dormitory-bldg-water-source-heat-pump-replacement-20-units
Career Systems Development Corporation is soliciting proposals for the total replacement of twenty ceiling-mounted water source heat pumps at the Roswell Job Corps Center Male Dormitory Building 558 in New Mexico. The scope of work includes the removal and off-site disposal of twenty failed units and the installation of new Bosch 1-ton units or equivalent, including all necessary ducting, electrical, gas, thermostat wiring, flexible hoses, and pressure valves. Additionally, the contractor must install smoke dampers with fusible links in all vents leading into the plenum and ensure all materials used in the plenum are plenum-rated. All work must comply with NFPA 101, NFPA 70, and applicable plumbing, mechanical, and building codes, with performance scheduled between 7:00 am and 4:00 pm, Monday through Friday. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act Wage Determination NM20260014, requiring the submission and approval of weekly certified payroll reports prior to invoice payment. Proposals exceeding $100,000.00 require payment and performance bonding for 100% of the contract value. Submissions must include a safe work process, detailed costs for labor and materials, equipment cut sheets, warranty information, and a requested payment schedule. Final deliverables include the provision of operation manuals to the Facility Manager upon project completion.
Career Systems Development Corporation

POSTED

about 15 hours ago

DEADLINE

in 17 days

General Info

Agency

N/A

NAICS

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Place of Performance

GSA - HOTD 13th & C Sts, SW, WASHINGTON, DC, 20407, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Aug 9, 2011 to Feb 13, 2012. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Patrick A. WitteContract Specialist

Full Description

Show more
Request for Information / Sources Sought Notice Boiler #6 Modernization D/B The General Services Administration, Heating Operations and Transmission Division (HOTD), has the following requirement for Boiler #6 Modernization D/B. Location(s): GSA / HOTD 13th & C STS, SW Washington DC, 20407 THIS IS NOT A SOLICITATION ANNOUNCEMENT. THIS IS "SOURCES SOUGHT" REQUEST. ANY RESPONSE TO THIS RFI / SOURCES SOUGHT NOTICE WILL BE USED BY THE GOVERNMENT AS MARKET RESEARCH, FOR INFORMATIONAL PURPOSES AND TO MAKE APPROPRIATE ACQUISITION DECISIONS. - I. DESCRITPION OF WORK Boiler #6 (natural gas and #2 fuel oil) is rated at approximately 180,000 pounds/hour of saturated steam (250 psig/405F). The contractor shall upgrade the boiler as follows: - 1. Controls: Design, install and upgrade the existing Boiler #6 controls system to an ABB symphony/harmony distributed control system (or equivalent) compatible with the existing Infi90 DCS and this new controls system is able to be remotely operated from the central control room. Symphony Enterprise Management and Control System utilizing Harmony products including Harmony Control Units, Harmony Rack Controllers, Harmony Rack I/O, Harmony Modular Power Systems III, Harmony Control Network (C-Net) communication or equivalent controls system. This system will be factory tested. Demolish the existing control panel (see drawing and project report). Boiler controls also include the burner and igniter fire safety controls, positioning of the new flame safeguard scanners, since existing scanners' positioning results in frequent erroneous shutdowns. It shall be contractor's responsibility to determine the best location for the flame safeguard scanners. 250Hp FD and 450 Hp ID fans - change-out motors from 4160v to VFD compatible 480v and add Allen-Bradley VFDs or equivalent. Existing motors were designed for coal, #6 oil and shredded paper, and therefore, they may be oversized. The contractor shall determine the size of the new motors for a balanced draft furnace using natural gas and #2 fuel oil firing. - 2. Air heater: Demolish the existing Ljungstrom air-preheater and design and install an economizer. (see EBL's contract drawings and project report). - 3. Economizer: Design and install a feedwater economizer located in the area evacuated by the air pre-heater. Feedwater piping to economizer (inlet) - 6 inches. Economizer exterior shall have mineral wool insulation (4-inches) and aluminum lagging. The economizer should be a Kentube Engineered Products or equivalent. (see EBL's contract drawings and project report). Remove all air, water and steam piping associated with the old heater. - 4. Burners: The Contractor shall coordinate with the B&W Burner Company's engineer and carry out the added burner taps for better air flow distribution as recommended in the EBL contract drawings and project report. Replacing the existing burners with new requires too much EPA scrutiny, so utilization of existing burners with additional taps seems the best option for the Government, and therefore, the Contractor shall be required to carry out this option on behalf of the Government. - 5. Removal of the Electrostatic Precipitator (ESP): Demolish the ESP and design and install supports to structurally re-enforce the vacated area and re-roof the space. New roofing for the space occupied by the ESP shall be structurally re-enforced and re-roofed to match the existing roof. The Contractor shall be required to install and insulate the ductwork and breeching in place of the ESP. Note: It is the contractor's responsibility to return each of the components of this project back to the facilities existing conditions prior to the new construction, so the contractor should determine measurements before submitting bids. - A. Computer Aided Design (CAD): Drawings: All drawings developed by the Contractor shall be through computer based media (electronic data) and prepared in a format which can be used directly, without conversion, on AutoCad 2006 or later operating under Windows. Specifications: Specifications shall be developed through computer based media using specifications contained in these contract documents as a base. - B. Structural Requirements: The Contractor shall submit a proposed rigging plan and procedures for the installation of mechanical and electrical equipment. Calculations shall be submitted to verify the existing structure can safely support the proposed rigging and temporary construction loads. The calculations shall be signed and sealed by a Registered Structural Professional Engineer. The Contractor shall submit plans showing proposed locations of any cranes used on this project. The plans shall show the location of the cranes relative to the existing building and existing site conditions such as underground vaults which would impair the bearing value of the street pavement of sidewalk. The plans shall be signed and sealed by a Registered Structural Professional Engineer. Modifications to the building structure including cutting holes, adding or supporting mechanical and electrical equipment, pas, piping, ductwork, masonry walls or removal of structural members shall be included in the design documents and performed by a Registered Structural Engineer. - C. Quality Standards: All welders shall maintain up-to-date certifications. The welding certifications are to be submitted to the government before work begins. American Society of Mechanical Engineers Codes and American Welding Society Standards shall be followed. ASME Boiler and Pressure Vessel Codes (BPVC) ASME BPVC Section V (non-destructive testing) and ASME BPVC Section IX (welding & brazing qualifications) and AWS D1.1 (structural steel) shall be followed. Carbon Steel Pipe - ASTM A53 Pipe will be Schedule 80 heavy duty pipe. Adhere to ASME B31.1 Power Piping AWS D1.1 and ASME Section IX Hydrostatically test the new pipe per the latest edition of the IPC (1.5 times operating pressure for 2 hours) Adhere to the International Plumbing Code IPC) and the International Mechanical Code (IMC) All newly installed valves will be flanged and constructed to the ASME/ANSI B16.34 standards. API 600, API 598, API RP591, ASME B16.25, ASME B16.5, ASME B16.10 New valves will be stainless steel ASME 300 Class. Check valves will be Mueller Model 105MHT cast stainless steel globe body silent check valves or equivalent. The check valves will be ASTM A351-CF8M. Body - ASTM A351-CF8M (316SS) and Wedge/Disc and Stem - stainless steel. Gate valves will be ALOYCO/Crane Class 300 stainless steel or equivalent. New flexitallic gaskets will be installed between flanged connections. New installed fasteners (nuts and bolts) will be stainless steel and will be installed with stainless steel washers. All nuts will be bearing on their associated washers. There will be a need to fabricate or purchase flexitallic gaskets for the flanged connections associated with each of the newly installed valves. New conduit will be intermediate metal conduit (IMC) or greater. NFPA 70 will be followed. Transmitters, flow switches, level gauges, should be ABB or equivalent. Pressure and temperature gauges shall be Weiss Industries or equivalent. The contactor is responsible to adhere to workmanship quality standards outlined in the NFPA, International Mechanical Codes and the International Plumbing Codes. OHSA workplace standards shall be adhered to. Drawings shall clearly distinguish between new and existing work. The 90% working drawings shall accurately depict/describe all work (demolition and new construction) to be performed within all areas delineated on the respective floor plans. All drawings submitted shall be complete in all respects and shall fully support the minimum needs of the construction Contractor. The 100% final design drawings shall be stamped by a registered engineer. Work shall be coordinated on all drawings and specifications to assure all work, materials and items of equipment are included for an operational facility of finished appearance. Changes initiated by the Contractor which deviate from the design shall be brought to the project manager's attention immediately. All designs and construction work shall comply, as a minimum, with the latest edition of all applicable national and local codes and standards that govern federal construction. Newly installed equipment must adhere to the Buy American Act. Anticipated Dates: Estimated solicitation issuance date: February 21st, 2012 Estimated Term of Services: Services are to be provided for a period not to exceed 365 calendar days. NAICS Code: 238220 Estimated Construction Price Range: Between 1,000,000.00 and 5,000,000.00 Contractors who feel they can provide the GSA Heating Operation & Transmission District's Central Heating and Refrigeration Plant with the above services are invited to submit in writing an affirmative response which includes the following information: - 1. What is the name of your business? - 2. What is your POC's name, telephone number, e-mail address, and business address? - 3. Is your firm a large business, small business, a certified 8(a) small business, certified HUBZone business, Small Disadvantaged Business, Service Disabled Veteran Owned Small Business, Woman, and/or Minority Owned Business concern according to NAICS 238220? - 4. Is your business eligible to perform the tasks as described in this document as the prime? - 5. Does your business have qualified personnel to work on ABB symphony/harmony distributed control system? ___________ I AM interested in this procurement and would like to receive a solicitation if and when it is issued. ___________ I AM NOT interested in this procurement and would not like to receive a copy of the solicitation All responsible sources are encouraged to respond to this sources sought announcement by submitting a capability statement response to the questions contained within this notice via email to patrick.witte@gsa.gov no later than February 13th, 2012 by 1PM - EST. The Government does not intend to rank submittals or provide any reply to interested firms. Any Questions please contact Patrick Witte Borba by email. NO HARD COPY OR FACSIMILE SUBMISSIONS WILL BE ACCEPTED. Extraneous materials (brochures, manuals, etc) will not be considered. IMPORTANT NOTE: THIS IS A REQUEST FOR INFORMATION ONLY. THE GOVERNMENT DOES NOT PROMISE OR IMPLY THAT A CONTRACT WILL BE AWARDED AS A RESULT OF INFORMATION RECEIVED FROM THIS REQUEST.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS