BOSTON HARBOR MAINTENANCE DREDGING

Awarded
W912WJ19B0006Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 11 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 12 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Boston Harbor Maintenance Dredging project, managed by the Department of Defense through the US Army Corps of Engineers New England District, is a construction effort to restore Federal Navigation Channels and Anchorage areas to their authorized depths. Under solicitation W912WJ19B0006, the scope of work involves dredging specific volumes from the Broad Sound and Nubble Channels, with dredged materials to be disposed of at the Mass Bay Disposal Site and the MSC CAD Cell. The project is governed by NAICS code 237990 and includes strict adherence to technical design plans and environmental constraints, specifically regarding fisheries protection windows. This sealed bid solicitation required a performance period of 240 calendar days and mandated that all bidders be registered in the System for Award Management. Technical specifications and design plans issued in early 2019 provided detailed coordinates for sediment sampling and specific channel dredging locations. The contract was administered by the office located in Concord, Massachusetts, with Elizabeth K. Glasgow serving as the primary point of contact for contract specialists.

General Info

Contract Value

$5,886,213.43

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

BOSTON HARBOR, MA, USA

Set-Aside

NONE

Award Issued Date

Documents

3

Maintenance Dredging Boston Harbor Plans - W912WJ19B0006

PDF, High priority: read this firstspecifications
High

Maintenance Dredging, Boston Harbor - Solicitation W912WJ-19-B-0006

PDF, High priority: read this firstspecifications
High

Solicitation W912WJ19B0006 - Maintenance Dredging, Boston Harbor

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline added: May 21, 2019. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New England
Contacts1 person available
OfficeCONCORD, MA, 01742-2751, USA
Office AddressCONCORD, MA, 01742-2751, USA
Contacts
Elizabeth K. GlasgowContract Specialist

Full Description

Show more
Description: The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids for Maintenance Dredging of the Boston Harbor Federal Navigation Project in Boston, MA. This will be an unrestricted competitive solicitation requiring a mechanical dredge to perform the work. The NAICS code for this procurement is 237990. The estimated construction cost is between $5,000,000.00 and $10,000,000.00. Any responsible source meeting this standard may submit a bid to be considered by the New England District. Project Description: This project consists of dredging approximately 400,000 cubic yards (cy) of silt, sand, and clay to improve the following components of the Boston Harbor Federal Navigation Project: 35-foot Broad Sound North Channel, 30-foot Broad Sound South Channel, 15-foot Nubble Channel, 35-foot Anchorage, and the 35-foot Main Ship Channel. The Broad Sound North Channel, Broad Sound South Channel, and the Nubble Channel will be dredged with placement of all material at the Massachusetts Bay Disposal Site (MBDS) approximately 15 miles offshore of Boston Harbor. The Main Ship Channel and 35-foot Anchorage will be dredged with placement of material in the Main Ship Channel (MSC) CAD cell. All dredging must be accomplished by mechanical means and dredging of the silt material going to the MSC CAD cell will require the use of an environmental bucket. During the course of the contract, additional work in the Boston Harbor will be ongoing. Additional work includes but is not limited to: Boston Harbor improvement dredging (USACE), berth maintenance in Chelsea River, Conley Terminal construction of new berth 10 and maintenance of berths 11, 12 and 14 (Massport), hydro-plow and directional drilling for new electric cable between Castle Island and Deer Island, and removal of existing electric cable within the Reserved Channel and Main Ship Channel. In addition to the communication and coordination requirements with other construction contractors working in Boston Harbor and typical harbor, this contract will also require coordination with Boston Logan Airport (Massport and the Federal Aviation Administration). Dredging within the vicinity of Boston Logan will need to be coordinated and approved by Massport and the FAA prior to accessing many areas of the required dredging. High production during these times will be crucial for project success. In order to accomplish all dredging requirements within the specified dredging window the Government will include definitive responsibility criteria requiring the Contractor to demonstrate project experience, within the last ten (10) years, in the following requirements: - Dredging by mechanical means a minimum of 70,000 cubic yards in one consecutive 30-day period. - Experience with mechanical dredging in coastal navigation channels at least 37 feet deep. - Experience with open ocean disposal of dredged material at Ocean Dredged Material Disposal Sites (ODMDS). An ODMDS is an ocean disposal site designated by the United States Environmental Protection Agency for the disposal of permitted or otherwise authorized dredged. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications, which will be used to support the offeror's effort. Subcontractor's experience must also have been performed within the last ten (10) years. This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about the end of March, beginning of April, 2019 and will be available for downloading by accessing the Federal Business Opportunities website (http:/www.fbo.gov). Please note this solicitation will be UNRESTRICTED. In order to view this solicitation, prospective contractors are required to self-register their firm with federal Business Opportunities (go to http:/www.fbo.gov and register under Vendor/Citizen). Amendments, if any, to the solicitation will be made available at the http:/www/fbo.gov website. Neither telephonic, mailed nor fax requests will be accepted. Registrants are responsible for the accuracy of the information on the FedBizOps Registration List.

More opportunities from Department Of Defense → W2SD Endist New England

Same awarding agency

NAICS: 237310
New
Federal
Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
Solicitation # W912WJ27QA003
Solicitation W912WJ27QA003 is a Request for Quotations issued by the Department of Defense, W2SD Endist New England, for the installation of approximately 250 linear feet of new pressure-treated wooden guardrail at the Mansfield Hollow Dam in Mansfield Center, Connecticut. This firm-fixed-price contract is a total small business set-aside under NAICS code 237310, with an estimated construction magnitude between $25,000 and $100,000. The project requires the contractor to provide all equipment, materials, and labor, ensuring posts are set three feet below and three feet above finished grade, spaced every six feet on center and secured with carriage bolts. The period of performance is 210 calendar days from the notice to proceed, with work hours restricted to Monday through Friday, 7:00 AM to 3:30 PM. To be considered responsive, vendors must maintain an active registration in SAM.gov and submit a comprehensive quote including technical documentation, price, and past performance from the last three years. Key safety and compliance requirements include adherence to USACE EM 385-1-1 standards and the submission of an Accident Prevention Plan, Activity Hazard Analysis, and Site Safety and Health Officer designation letter within 21 days of the notice to proceed. Fieldwork cannot commence until all submittals are approved. Award will be based on the most advantageous offer considering price, technical capability, and past performance. Payments will be processed electronically through the Wide Area WorkFlow system.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS