Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Boynton Beach Water Distribution System Improvement Project (Grant Funded)

Open
27-002BState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Boynton Beach is soliciting sealed bids for the Boynton Beach Water Distribution System Improvement Project, specifically for the Pre-Chlorinated Pipe Bursting Water Main Replacement at Lime Tree Condominiums and Bent Tree Villas East in Florida. The scope of work involves utilizing trenchless pipe bursting technology to replace approximately 1,000 linear feet of 4-inch and 6-inch asbestos cement water main with 6-inch HDPE pipe at Lime Tree Condominiums, as well as replacing water service lines at Bent Tree Villas East. Additional requirements include the installation of fire hydrants and valves, system connections, water main testing, maintenance of traffic, and site restoration. This project is funded in whole or in part by the State of Florida Department of Environmental Protection under Grant Agreement No. L0149, requiring strict adherence to grant terms and non-discrimination laws, including the Civil Rights Act of 1964 and the Florida Civil Rights Act of 1992. The contract will be awarded to the lowest responsible and responsive bidder, with tie-breaking preferences given to those with a certified drug-free workplace program. Bidders must provide a bid bond and, upon award, furnish separate performance and payment bonds for 100% of the bid amount. Mandatory submissions include a variety of affidavits covering non-collusion, anti-human trafficking, and E-Verify, along with proof of competency and insurance. The contractor is responsible for all labor, materials, and permits, and must submit monthly applications for payment for review by a consultant. Final acceptance is contingent upon the City's Project Manager verifying that all work and punchlist items are complete. There is no set-aside status for this solicitation.

General Info

Bids for water main replacement and system improvements in Boynton Beach, Florida.

Documents

1
PDF, High priority: read this first172 pages · itb
High

Read the document

Due in 29 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 29 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCity of Boynton Beach
ContactsNo contacts available
OfficeFL, USA
Organization / AgencyCity of Boynton Beach
Office AddressFL, USA
ContactsNo contact information available

Full Description

Show more
The City of Boynton Beach ("City") Utilities Department is requesting sealed bids from qualified and experienced contractors to provide construction services for the Pre-Chlorinated Pipe Bursting Water Main Replacement at Lime Tree Condominiums and Bent Tree Villas East, located in Boynton Beach, Florida. The work includes pipe bursting and replacement of existing water main with new HDPE pipe, installation of fire hydrants and associated valves, water service line replacement, system connections and testing, maintenance of traffic, and site restoration.This project is funded, in whole or in part, by the State of Florida Department of Environmental Protection (FDEP) under Grant Agreement No. L0149, Boynton Beach Water Distribution System Improvement Project. The Contractor shall comply with all applicable grant terms and conditions, as set forth in this solicitation.The Contractor shall furnish all labor, tools, equipment, materials, supplies, manufactured articles, transportation, services, and communications necessary to complete the project in accordance with the Contract Documents, including the General Conditions for Construction, Special Conditions, Project Design Plans, and Technical Specifications. All improvements shall be completed in accordance with the Contract Documents and all applicable federal, state, county, and local regulatory requirements. The Contractor shall also provide all engineering, shop drawings, and documentation necessary to obtain applicable permits, and shall furnish all required bonds, securities, licenses, and insurance.The City reserves the right to award more than one Bidder. The Bidder(s) shall act as an independent contractor and not as an employee of the City.Questions related to this ITB are to be submitted to the Purchasing representative through the e-procurement system only by clicking on the “Submit a Question” button for this specific solicitation.

Similar Contracts

Same NAICS industry code

More opportunities from City of Boynton Beach

Same awarding agency

NAICS: 238210
SLED
Boynton Harbor Marina Fuel System Electrical Conduit & Piping Transition Sump Repairs
Solicitation # 27-014B
The City of Boynton Beach is seeking sealed bids from qualified firms to perform construction services for the Boynton Harbor Marina Fuel System Electrical Conduit and Piping Transition Sump Repairs. The scope of work involves replacing corroded rigid metal conduit with marine-grade rigid aluminum conduit, replacing deteriorated electrical fittings, and repairing product piping entry boots at gasoline and diesel STP sumps using ICON. Additionally, the contractor must raise electrical fittings and seal-offs to at least 6 inches above the finished surface and ensure compliance with FAC 62-761, 40 CFR Part 280, and the 2023 Florida Building and Fire Prevention Codes. Bidders are required to provide all labor, materials, equipment, and permits necessary to complete the project according to the design plans and technical specifications. Submissions must be made electronically via the City's encrypted procurement management system. A mandatory pre-bid conference and site visit are required for all interested parties. The solicitation is subject to a cone of silence, prohibiting communication with City Commission members or staff, except for the Purchasing Manager, until the contract is awarded or the process ends. There is no set-aside status for this solicitation.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

21 days ago

DEADLINE

in 4 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS