Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Boynton Harbor Marina Fuel System Electrical Conduit & Piping Transition Sump Repairs

Active
27-014BState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCity of Boynton Beach
ContactsNo contacts available
OfficeFL, USA
Organization / AgencyCity of Boynton Beach
Office AddressFL, USA
ContactsNo contact information available

Full Description

Show more
Sealed Bids, addressed to the Senior Procurement Specialist of the City of Boynton Beach, Palm Beach County, Florida, will be received electronically via the City’s encrypted procurement management system, bids&tendersTM until 3:00 PM local time, xxxxxx, November , 2026 for:BOYNTON HARBOR MARINA FUEL SYSTEM ELECTRICAL CONDUIT AND PIPING TRANSITION SUMP REPAIRS27-014BAll ITB’s received will be publicly opened and acknowledged of receipt by the City’s Procurement Department via the e-procurement system electronically. The e-procurement system does not permit ITB’s received after the assigned date and time. For the above reasons, it is recommended that the proposer(s) allow sufficient time to complete your online Submission and to resolve any issues that may arise. ATTENTION, ALL INTERESTED BIDDERS:To obtain documents online, please visit Boynton-beach.bidsandtenders.net. and https://boynton-beach.bidsandtenders.net/Module/Tenders/en. Documents are not provided in any other manner. SCOPE OF SERVICES:The City of Boynton Beach “City” Public Works Engineering Department is requesting sealed bids from qualified and experienced firms to provide construction services for the complete repair of existing deficiency’s at the BOYNTON HARBOR MARINA FUEL SYSTEM ELECTRICAL CONDUIT AND PIPING TRANSITION SUMP REPAIRS located at 735 Casa Loma Blvd., Boynton Beach, FL 33435. The work includes the replacement of all corroded rigid metal conduit (RMC) with marine-grade Rigid Aluminum Conduit, replacement of deteriorated electrical fittings, removal and replacement of electrical conduit and fuel/vent piping entry boots, repair of product piping entry boots at the gasoline and diesel STP sumps using ICON, raising of all electrical fittings and seal-offs to a minimum of 6 inches above the finished dock/concrete surface, coordinate and pass all required inspection hold points with the Engineer, Owner, and Florida DEP representative. The project includes repairing all other items as necessary to correct existing deficiencies as well as repairing the design as shown on MDM Drawings G-1.0, G-2.0, and G-3.0 (dated 04-29-2026), in support of compliance with FAC 62-761 and 40 CFR Part 280.The Contractor shall furnish all labor, tools, equipment, materials, supplies, manufactured articles, furnishing all transportation and services, and essential communications, etc., as necessary to complete the project, as indicated in the Special Conditions, Special Provisions, Project Design Plans, Technical Specifications and Bid No. 27-014B Documents herein, along with all engineering, shop drawings, and other documentation necessary to obtain all applicable permits and all bonds, securities, licenses and insurance to complete the project as specified herein and within the Project Design Plans. All proposed improvements shall be completed in accordance with the project bid documents, design plans, details, technical specifications/scope of work and all applicable federal, state, county and local regulatory requirements including but not limited to FAC 62-761 (Florida UST Regulations); 40 CFR Part 280; 2023 Florida Building Code, 8th Ed.; 2023 Florida Fire Prevention Code, 8th Ed.; NFPA 30, 30A, 303; NEC (NFPA 70). The City reserves the right to award to more than one Contractor. The Contractor(s) shall act as an independent contractor and not as an employee of the City.Questions related to this ITB are to be submitted to the Purchasing representative through the e-procurement system only by clicking on the “Submit a Question” button for this specific solicitation.PRE-BID CONFERENCE:A Non - Mandatory Pre-Bid Conference & Site Visit is scheduled for November 16 , 2026, at 11:00 A.M. to be held at City of Boynton Beach City Hall Room 115, 100 East Ocean Avenue, Boynton Beach, Florida 33435. Please note that while this meeting will be recorded and uploaded to Bids&Tenders it remains a mandatory conference and all parties interested in bidding on this project shall attend in order to provide a bid for this project. A site visit will occur right after the meeting. All bidders must provide their own transportation to the site.The purpose of this meeting is to provide a forum for all concerned parties to discuss the proposed term contract, answer questions on the solicitation document, review the qualifications requested, provide instructions for submitting proposals, and discuss other relevant issues.In the event that any discussions or questions at the pre-bid meeting require, in the City’s opinion, official additions, deletions, or clarifications of the solicitation or any other document, the City will issue an addendum to this ITB, as the City determines is appropriate.PUBLIC RECORDS DISCLOSURE:Pursuant to Florida Statutes §119.071, sealed Proposal responses received by the City in response to an Invitation to bid are exempt from public records disclosure requirements until thirty (30) days after the opening of the Proposals unless the City announces intent to award sooner. If the City rejects all Responses submitted in accordance with an Invitation To Bid, and the City concurrently provides notice of its intent to reissue the competitive solicitation, the rejected Responses remain exempt from public disclosure until such time as the City provides notice of a decision or intended decision concerning the competitive solicitation or until the City withdraws the reissued competitive solicitation. A Bid response, or reply is not exempt for longer than twelve (12) months after the initial City notice rejecting all Bids. LOBBYING / CONE OF SILENCE: Consistent with the requirements of Chapter 2, Article VIII, Lobbyist Registration, of the Palm Beach County Code of Ordinances, Boynton Beach imposes a Cone of Silence. A cone of silence shall be imposed upon each competitive solicitation as of the advertisement of the proposal, bid, or other response and shall remain in effect until the City Commission awards or approves a contract, rejects all bids or responses, or otherwise takes action that ends the solicitation process. While the cone of silence is in effect, no Offeror or its agent shall directly or indirectly communicate with any member of the City Commission or their staff, the Manager, any employee of Boynton Beach authorized to act on behalf of Boynton Beach in relation to the award of a particular contract or member of the Selection Committee in reference to the solicitation, with the exception of the Purchasing Manager or designee. (Section 2-355 of the Palm Beach County Code of Ordinances.) Failure to abide by this provision may serve as grounds for disqualification for award of contract to the Offeror. Further, any contract that violates the cone of silence shall render the transaction voidable. The cone of silence shall not apply to oral communications at any public proceeding, including pre-bid conferences, oral presentations before Selection Committees, contract negotiations during any public meeting, presentations made to the City Commission, and protest hearings. Further, the cone of silence shall not apply to contract negotiations between any employee and the intended awardee, any dispute resolution process following the filing of a protest between the person filing the protest and any employee, or any written correspondence with Boynton Beach as may be permitted by the competitive solicitation. Additionally, the cone of silence shall not apply to any purchases made in an amount less than the competitive solicitation threshold set forth in the Purchasing Manual.

More opportunities from City of Boynton Beach

Same awarding agency

New
SLED
Galaxy Sand Pine Scrub Preserve Urban Forestry Education Initiative (Grant Funded)
Solicitation # 26-091R
The City of Boynton Beach is soliciting proposals for the Galaxy Sand Pine Scrub Preserve Urban Forestry Education Initiative, a project funded by a 2024 USDA Forest Service Community Forestry Capacity Grant administered by the Florida Department of Agriculture and Consumer Services. The selected independent consultant will develop a comprehensive suite of educational outreach materials, including interpretive signage, print-ready brochures, public service announcements, and portable interactive exhibits. Additionally, the consultant will create frameworks for community workshops, guided tours, and volunteer programs, and provide recommendations for planting locations within the Preserve. All deliverables must include specific grant acknowledgments and disclaimers and are subject to written acceptance by both the City and the Florida Forest Service. The project must commence within five days of a Notice to Proceed, with substantial completion required by March 1, 2027, and final completion by March 31, 2027. The contract term aligns with the grant period ending June 30, 2027. Proposals will be evaluated based on experience and qualifications, the technical operational plan, and financial stability, with price serving as one of several factors for the award. Selected vendors must comply with federal procurement standards under 2 CFR Part 200, E-Verify requirements, and various state and local certifications, including non-discrimination and DEI funding prohibitions. Payment is processed within 45 days of a proper invoice, provided that all services rendered before September 30 of any year are invoiced by that date.

POSTED

2 days ago

DEADLINE

in 21 days
View Details
NAICS: 541330
SLED
SAFE STREETS 4 ALL SAFETY ACTION PLAN STUDY
Solicitation # 26-082Q
The City of Boynton Beach is soliciting qualification packages for a professional consultant to develop a federally compliant Safety Action Plan (SAP) under RFQ No. 26-082Q. The primary objective of the project is to reduce traffic crashes and injuries by establishing standards for speed reduction, traffic calming, and updated traffic ordinances, while specifically assessing underserved communities to improve multi-modal transportation access to main corridors. This initiative is partially funded by the U.S. Department of Transportation Federal Highway Administration Safe Streets and Roads for All (SS4A) Grant Program and is conducted in accordance with the Consultants’ Competitive Negotiation Act (CCNA) Section 287.055, Florida Statutes. The scope of work requires the consultant to perform crash analysis, gather community input, and deliver a phased implementation plan, a quick-build safety program framework, a performance monitoring framework, and a comprehensive funding strategy memorandum. Key deliverables must be completed by the eleventh month, including a concise executive summary for the City Commission. Selection is based on responsibility and responsiveness, with a focus on personnel capabilities and past experience rather than price alone. The project adheres to strict federal and state regulations, including 2 CFR Part 200, Title VI of the Civil Rights Act, and the Americans with Disabilities Act. Submission requirements include a detailed qualification package consisting of a Letter of Interest, SF330, financial statements, and various notarized federal grant forms. A non-mandatory pre-qualification conference is scheduled for October 26, 2026, and the final response deadline is November 17, 2026. The contract imposes a cone of silence from the submission deadline until the final award. Payment terms are set at 45 days from receipt of a proper invoice, and the City encourages the active participation of minority, women-owned, and labor surplus area firms.
Engineering Services

POSTED

14 days ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS