Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Energy was posted on April 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BPM Cables - Flexible LMR for ALS-U

Closed
AA-2026-05Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334419
New
DIBBS
SHOE, JACK-SUPPORT
Solicitation # SPE7LX-26-T-1117
Solicitation SPE7LX-26-T-1117 is a Request for Quotations issued by the DLA Land and Maritime Strategic Acquisition Program Directorate for the procurement of 97 units of Jack-Support Shoes (NSN 4940-01-678-9226). This is a total small business set-aside under NAICS 334419, with a specific preference for JLTVCI Small Business Prime Contract holders. The procurement requires adherence to multiple technical drawings and quality standards, including the DLA Master List of Technical and Quality Requirements. Delivery is specified as FOB Origin with a delivery period of 168 days, and the items are to be shipped to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict compliance with MIL-STD-2073-1E for packaging and MIL-STD-129 for marking, with palletization following RP001 requirements. Inspection and acceptance will occur at the destination per FAR 52.246-2. Offerors must comply with the Buy American Act and the Berry Amendment, providing disclosure for any non-domestic materials used. Payment and receiving reports must be processed electronically through the Wide Area WorkFlow (WAWF) system. Award decisions will be based on fair and reasonable pricing, quality, and delivery terms, with the potential to convert to a FAR Part 13 Simplified Acquisition if initial pricing is not found to be fair and reasonable.
STRATEGIC ACQ PROGRAM DIRECTORATE

POSTED

about 15 hours ago

DEADLINE

in 9 days
NAICS: 334419
New
DIBBS
MICROCIRCUIT, LINEAR
Solicitation # SPE7M5-26-T-455B
Solicitation SPE7M5-26-T-455B, issued by DLA Land and Maritime Active Devices Division, is a request for quotations for four linear microcircuits, identified by NSN 5962012477674 and part number HI1-5047A/883 from Renesas Electronics America Inc. The procurement is for a critical application item and is categorized as a commercial item. Delivery is required within 143 days, with a need ship date of February 2, 2027, and a final required delivery date of July 1, 2027. Inspection and acceptance will occur at the destination, specifically DLA Distribution DDWO in Columbus, Ohio. The contract imposes stringent quality and technical requirements, including CMMC Level 2 self-assessment and strict supply chain traceability. Contractors must provide DLA Land and Maritime Form 918 and associated traceability or test reports at least 15 days prior to the delivery date to receive shipping authorization. Packaging must adhere to MIL-STD-2073-1E and MIL-PRF-81705 for ESD and EMI protection, with specific cushioning requirements per A-A-59136 to prevent lead damage. Marking must comply with MIL-STD-129 and IPC/JEDEC J-STD-609 for lead finish identification. Additionally, the contractor must ensure that mercury is not intentionally added to the hardware and must comply with the Buy American and Balance of Payments Program. All quotes must be submitted via the DIBBS portal by September 11, 2026.
ACTIVE DEVICES DIVISION

POSTED

about 15 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), is soliciting quotes for Flexible Cables under RFQ AA-2026-05 to support the Advanced Light Source Upgrade (ALS-U) project. The requirement is for the manufacture, testing, labeling, and delivery of LMR-195FR coaxial cable assemblies with SMA(M) straight connectors in three specified lengths—2.0FT, 2.5FT, and 3.5FT—each with a strict ±10 ps phase tolerance. All units must be produced with color-coded heat-shrink labels, marked with a unique serial number and item number in a controlled format, and supplied in equal quantities across four colors: Blue, Red, Green, and White. The first article must be delivered within eight weeks of contract award and undergo formal approval before production can commence, with the production batch of 984 units scheduled to follow within eight weeks after first article approval. The RFQ was initially released on April 10, 2026, with the response deadline extended to April 30, 2026, and revised through multiple amendments that added Question & Answer documents to clarify requirements. All offers must include completed representations and certifications, including the Past Performance Reference Information Form regardless of value, and a Rep Cert Form if the quote exceeds $150,000. The offeror must certify compliance with all mandatory requirements in the RFQ and agree to manufacture per the Statement of Work. Offerors are required to comply with specific technical and regulatory standards, including adherence to LBNL’s Acceptance Criteria List AL-1887-9968 for testing, NRTL certification of all electrical components, and environmental compliance with R2 and E-Steward recycling standards. Packaging must protect against physical damage and bending beyond the cable’s minimum bend radius, though no MIL-STD packaging is mandated. Labeling must follow strict formatting rules with black text on color-coded sleeves placed 50 mm from the end of the heat-shrink tubing. No barcoding requirements are specified. The contract is structured as a firm-fixed-price solicitation, with pricing submitted in volume tiers for the production batch, subject to option exercise up to 15 weeks after first article delivery. The place of performance and delivery is LBNL in Berkeley, California, under FOB Destination, freight prepaid and add terms. Payment is managed through LBNL’s Accounts Payable Office with

General Info

Manufacture and deliver 984 LMR-195FR coaxial cable assemblies with SMA connectors, strict phase tolerance, color-coded labeling, to LBNL under firm-fixed-price terms.

Agency

Department Of Energy → Berkeley National Labor - DOE ContractorView Agency

NAICS

334419 - Other Electronic Component ManufacturingView NAICS

Place of Performance

Berkeley, CA, 94701, USA

Set-Aside

NONE

Documents

(8)

RFQ AA-2026-05 Question and Answer Document

PDFq-and-a

0.+RFQ+AA-2026-05.pdf

PDF

2.+AL-1887-9968_SR_BPM_flexible_jumper_cable_ACL_docx.pdf

PDF

1.+AL-1881-8085_SOW_SR_BPM_Flexible_Jumper_Cables_docx.pdf

PDF

5.+Past+Performance+Reference+Information+Form%2C+AA-2026-05.docx

DOCX

4.+Rep+Cert+Form%2C+AA-2026-05.docx

DOCX

3.+Sample+Subcontract%2C+AA-2026-05.pdf

PDF

Question+Answer+AA-2026-05+Rev.+1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Berkeley National Labor - DOE Contractor
Contacts2 people available
OfficeBerkeley, CA, 94720, USA
Organization / Agency
Department Of Energy → Berkeley National Labor - DOE Contractor
View Agency Profile
Office AddressBerkeley, CA, 94720, USA

Full Description

Show more

This RFQ is hereby modified as of 4/23/26 to extend the response date for this RFQ to April 30, 2026. All others terms and conditions of this RFQ remain the same.


__________________________________________________________


This RFQ is hereby modified as of 4/16/26 to add the attached Question & Answer document Rev. 1. All others terms and conditions of this RFQ remain the same.


__________________________________________________________


This RFQ is hereby modified as of 4/15/26 to add the attached Question & Answer document. All others terms and conditions of this RFQ remain the same.


__________________________________________________________


Dear Prospective Offeror:



The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Quote (RFQ) No. AA-2026-05 for Flexible Cables that will be utilized in the ALS-U.



The RFQ and associated documents (listed below) are attached:


0.      RFQ and submission instructions


1.      Statement of Work


2.      Acceptance Criteria List


3.      Sample Subcontract


4.       Rep Cert Form (required with submission if total Quote is in excess of $150K)


5.       Past Performance Reference Information Form (submit with Quote regardless of value)



*With your Quote submission, you must certify in writing that you meet and agree to all of the Mandatory Requirements outlined within Doc 0. RFQ AA-2026-05 and will manufacture per SOW.



Timeline of Events:


RFQ Release - April 10, 2026


Quotes Due - April 23, 2026



We look forward to your participation.

More opportunities from Department Of Energy → Berkeley National Labor - DOE Contractor

Same awarding agency

NAICS: 334516
New
Federal
Beamline 4.3.1 Monochromator system
Solicitation # JG-0909-26
Lawrence Berkeley National Laboratory is issuing a Request for Information under solicitation JG-0909-26 to identify potential providers for a high-stability X-ray monochromator system for Beamline 4.3.1 at the Advanced Light Source. The system is intended to support a broad scientific program in small- and wide-angle X-ray scattering, with optimized performance required at 10 keV and 17 keV. Key technical requirements include a double-multilayer monochromator baseline with an energy bandwidth of approximately 1 percent, a Si(111) crystal monochromator for higher resolution over 10 to 17 keV, and the integration of cryo-cooling for the first multilayer to manage thermal distortions. The system must also comply with strict facility vacuum, space, and radiation safety standards. This is a presolicitation effort to gather data on technical feasibility, budgetary costs, and delivery schedules, with a project magnitude estimated between 500,000 and 600,000 dollars. Interested respondents must complete the RFI form sections 1 through 5 by October 16, 2026. The anticipated timeline includes a formal Request for Proposal in winter-spring 2027, with final system delivery expected by December 2028. Evaluation of responses will focus on achievable performance, system complexity, and the ability to conduct comprehensive Factory Acceptance Testing regarding optical, mechanical, and environmental stability prior to delivery and commissioning at the Berkeley, California facility.
Analytical Laboratory Instrument Manufacturing

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS