This Combined Synopsis/Solicitation opportunity from Department Of Energy was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
BPM Cables (Semi Rigid) for ALS-U
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The University of California, acting on behalf of the Lawrence Berkeley National Laboratory, is soliciting proposals for the manufacturing and delivery of 1,120 semi-rigid cable assemblies for the Advanced Light Source Upgrade Project under RFP No. AA-2026-04. The cables, designated as SMR141-525MM and SMR141-650MM, must meet stringent technical specifications including an operational frequency range of 0.05–18 GHz, low signal loss using PTFE 141 cable, and SMA connectors rated for 200°C operation. Deliverables include full production, 100% testing, vacuum and thermal validation, and submission of a First Article Inspection Report prior to production release. All assemblies require permanent color-coded heat shrink labels with unique serial numbers and item numbers, placed 80 mm from each connector, and must comply with the project-specific Acceptance Criteria List and LBNL quality assurance protocols. The contract is structured in milestone-driven batches, beginning with first article units to be delivered within six weeks of award, followed by production batches contingent on approval of prior phases, with final delivery of the majority of units due within 12 weeks of hold point approval. Proposals are to be submitted in three volumes—cover letter, technical, and business—and must include mandatory documentation such as the completed Price Proposal Schedule, Representations and Certifications, Past Performance Reference Form, and ALS-U Quality Evaluation Survey. While pricing details are not specified and marked as "To Be Determined," offerors must provide realistic, reasonable, and complete cost proposals without being evaluated on a lowest-price basis; instead, award will follow a trade-off approach emphasizing technical merit, manufacturing capability, delivery schedule, past performance, and quality assurance. The contract includes unique clauses requiring compliance with the Buy American Act, strict export control notifications and indemnification, duty-free entry support under ITA-338P, and full transfer of technical data ownership to the U.S. Department of Energy. All shipments are FOB destination, prepaid, and must be delivered to Building 69 at Lawrence Berkeley National Laboratory in Berkeley, CA. Invoices must be submitted via email in PDF, Word, or RTF format to the designated accounts payable office, and the Procurement Representative, Arielle Anoop, is the sole authorized point of contact for contract modifications. The proposal deadline was extended to May 5, 2026, and all submissions
General Info
Agency
NAICS
Place of Performance
Berkeley, CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Dear Prospective Offeror:
Please see the attached answer to the 5th set of questions referring to this request for proposal.
Thank you.
This RFP is hereby modified as of 4/27/26 to extend the proposal due date until May 5, 2026. All other terms and conditions remain the same.
____________________________________________________________________
Dear Prospective Offeror,
The University of California, on behalf of the Lawrence Berkeley National Laboratory (LBNL), would like to invite you to participate in Request for Proposal (RFP) No. AA-2026-04 for ALS-U Beam Position Monitor (BPM) Semi Rigid Cables.
The RFP and associated documents (listed below) are attached hereto:
0. RFP and Proposal Preparation Instructions
1. Statement of Work (SOW)
2. Acceptance Criteria List (ACL)
3. Sample Subcontract
4. Rep Cert Form (required with submission)
5. Price Proposal Schedule, Attachment A (required with submission)
6. Past Performance Reference Information Form (required with submission)
7. ALS-U Quality Evaluation Survey (required with submission)
Timeline of Events:
RFP Release - April 13, 2026
Questions for Clarification - no later than April 17, 2026
Submissions due - no later than April 27, 2026
More opportunities from Department Of Energy → Berkeley National Labor - DOE Contractor
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
