Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on September 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BR-71-2701 Georgia Highlands College Master Plan

Closed
BR-87-2701State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541310
New
SLED
CCCRI A&E Services for The Workforce Innovation Center Addition Knight Campus
Solicitation # RFP27007132
The Community College of Rhode Island is soliciting architectural and engineering services for the Workforce Innovation Center addition at the Knight Campus in Warwick, Rhode Island. The project involves the design and construction of a new building located in the student parking lot, with a total construction budget not to exceed 54,329,000 dollars and an additional 5,000,000 dollar budget for furniture and equipment. The contract is expected to begin around March 2027 and span approximately 40 months. Key deliverables include a complete design based on a July 2025 feasibility study, a project narrative for timeline and construction scheduling, operational plans to maintain college functions during construction, and a ledge removal plan utilizing non-blasting methods. The selection process utilizes a combined scoring system where technical proposals must score at least 55 out of 70 points to proceed to cost evaluation. Scoring is weighted across a work plan, approach and methodology, staff qualifications, and vendor capability, with a separate 30-point allocation for the cost proposal and up to 6 bonus points for ISBE participation. Technical proposals are limited to six pages and must be submitted via the OSP portal. The project must adhere to the RI Green Buildings Act, the 2024 IECC energy code, and RIDEM requirements, while incorporating ADA-compliant bathrooms and a fully sprinkled system with an emergency diesel generator. Contractual requirements include the use of specific Rhode Island Custom AIA documents and the State's General Conditions of Purchase. The selected vendor must maintain comprehensive insurance, including 2,000,000 dollars in professional liability and 5,000,000 dollars in technology errors and omissions coverage. Performance will be monitored through weekly onsite inspections, with written reports due within two days of each visit to ensure workmanship meets design specifications.
State of Rhode Island

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 541310
New
SLED
RFP Architectural and Engineering Services Administration Building Renovations Advanced Water Treatment Facility (AWTF)
Solicitation # 2026-006
Capital Region Water is soliciting proposals for Architectural and Engineering services to renovate and modernize the Administration and Laboratory Building at the Advanced Water Treatment Facility in Harrisburg, Pennsylvania. The project focuses on improving building functionality, operational efficiency, and code compliance through the replacement of curtain wall and window systems, masonry restoration, and the construction of a new ADA-compliant entrance and canopy. The scope also includes the modernization of office and laboratory support spaces, along with comprehensive upgrades to structural, mechanical, electrical, plumbing, and life safety systems. The selected consultant will be responsible for evaluating existing conditions, developing design packages at 30, 60, and 90 percent completion, obtaining permits, and providing construction administration services. Proposals must be submitted electronically via the OpenGov portal by November 23, 2026. Submissions must include a technical proposal highlighting relevant experience, a project team organizational chart, and a separate cost proposal featuring a labor breakdown and a time and materials Not-to-Exceed project fee. Mandatory documentation includes a notarized Non-Collusion Affidavit, a Bidder Affidavit, a Bidder Questionnaire, and an Excel-based Bidder Acknowledgements form. While bid and performance bonds are not required, the contractor must maintain minimum insurance coverage at their own expense and comply with Pennsylvania non-discrimination and affirmative action regulations.
Procurement

POSTED

about 5 hours ago

DEADLINE

in 10 days
NAICS: 541310
New
SLED
Professional Architectural and Engineering Services
Solicitation # STC-27-001
Spindletop Center is soliciting Statements of Qualifications from licensed Texas architectural firms to provide lead architectural design and coordinated engineering services for the renovation of Building F in Beaumont, Texas. The project scope includes the renovation of the existing facility and the design of a kitchen and dining expansion, with comprehensive improvements to HVAC, electrical, plumbing, security, and safety systems. The design must specifically support psychiatric residential youth treatment and mental health respite functions, incorporating specialized behavioral health safety features such as anti-ligature and tamper-resistant elements, while adhering to Texas Accessibility Standards and relevant licensing requirements. The selection process is a qualifications-based solicitation where the most highly qualified firm will be chosen based on a 100-point scoring system. Evaluation criteria are weighted toward comparable healthcare and youth residential experience, team qualifications, project approach, renovation experience, and past performance. Professional fees and pricing must not be included in the initial submission; instead, the Center will negotiate a fair and reasonable scope and fee with the top-ranked firm. Proposals must be submitted as a single electronic PDF by November 30, 2026, at 2:00 p.m. CST. The established construction budget for the project is 2,500,000 dollars.
SPINDLETOP CENTER

POSTED

about 6 hours ago

DEADLINE

in 17 days
NAICS: 541310
New
SLED
UNC Charlotte
Solicitation # 68-UNCC-Study11132026
UNC Charlotte is soliciting study services for the East Campus Sector Assessment, a project focused on developing a comprehensive sector plan for the area bordered by the Botanical Garden, Martin Village Road, and Van Landingham Road. The scope of work involves integrating land use for several key facilities, including a new greenhouse to replace the McMillan Greenhouse, a community garden, parking for approximately 200 vehicles, a dining hall with auxiliary services and administrative offices, and student residential facilities, along with necessary infrastructure such as roads, pedestrian pathways, and utility corridors. The selected designer will be responsible for delivering a conceptual sector plan, conceptual cost estimates, project schedules, phasing plans, and high-level renderings of the greenhouse for fundraising purposes. The total budget for the assessment fee is 200,000 USD, which covers all design fees and reimbursable expenses. The project is scheduled to kick off on January 4, 2027, with a 90 percent draft report due by April 5, 2027, and the final report and presentation due by May 3, 2027. Proposals must be submitted as a single PDF file to Gracie Layman by November 30, 2026. The University's Designer Selection Committee will evaluate submittals based on specialized expertise in planning student life buildings and student unions, past performance on similar projects, staff experience, current workload, and the proposed project approach. Applicants must demonstrate familiarity with the North Carolina State Construction Office and UNC System requirements. Submittals are limited to a maximum of 30 pages and must include a cover sheet, supplemental information form, cover letter, and a detailed description of the team's approach and personnel qualifications.
Unc - System Office

POSTED

about 17 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The Board of Regents of the University System of Georgia is seeking professional planning consulting services to develop a Master Plan for Georgia Highlands College, covering the Rome and Cartersville campuses. This solicitation, identified as Project No. BR-87-2701, utilizes a two-step selection process. The first step is a Request for Qualifications due by October 26, 2026, where firms are evaluated on relevant project experience, suitability, and stability. Selected finalists will then proceed to a second step involving detailed proposals and interviews, with evaluations focusing on the master planning approach, team qualifications, and communication effectiveness. The final award will be based on a ranking system, with negotiations starting with the top-ranked firm. The project has a fixed budget of 350,000 dollars, which includes all reimbursables, and an anticipated completion date of January 2028. The scope of work follows a four-phase framework governed by the USG Master Plan Guidelines and the 2013 Space Utilization Study, focusing on data analysis and instructional space utilization. Key deliverables include a detailed work plan, schedule, and a specific fee allocation deployment. Interested firms must submit a Statement of Qualifications not exceeding 20 pages as a single PDF, including a signed accuracy certification, litigation history, and socioeconomic status. All key personnel are required to attend the finalist interviews to demonstrate team dynamics.

General Info

USG seeks planning consultants for Georgia Highlands College Master Plan; budget 350,000 dollars.

Documents

1
PDF, High priority: read this first10 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyBoard Of(university System of Georgia) Regents
Contacts1 person available
OfficeN/A

Full Description

Show more
Professional Planning Consulting Services for Project No. BR-87-2701 MP, Georgia Highlands College Master Plan, Georgia Highlands College, Rome/Cartersville, Georgia. Please see the attached documents for project information and upload instructions. Questions about any aspect of the RFQ or the project should be submitted in writing to the contact listed above.

More opportunities from Board Of(university System of Georgia) Regents

Same awarding agency

NAICS: 541330
New
SLED
DSC J-472 DP, Utilities Upgrades Phase 1 RFQ-RFP
Solicitation # PE-47200-RFQ-2027-000000164
The Board of Regents of the University System of Georgia is soliciting design professional services for Project No. J-472, Utilities Upgrades Phase 1 at Dalton State College in Dalton, Georgia. The scope of work encompasses a comprehensive design process including program validation, existing site conditions analyses, and construction administration. The selected Design Professional will also be responsible for procuring and contracting specialized services for topographic surveying, utility location, geotechnical testing, and Phase I Environmental Site Assessments. The project is estimated to commence in Winter 2027, with construction documents expected by Fall 2027, and a preliminary construction cost limitation of approximately 4,050,000 dollars. The estimated base fee for the design professional services is approximately 344,250 dollars. The selection process is a multi-step evaluation following the State Construction Manual. Initially, firms are evaluated on a Statement of Qualifications based on relevant project experience (45%), suitability regarding laws and safety standards (30%), and firm stability (25%). Finalists will then undergo interviews evaluated on their design methodology (25%) and team communication and project solutions (25%). Proposals must be submitted as a single PDF via the BOR Egnyte platform by December 15, 2026, and must not exceed 50 pages. Required documentation includes several exhibits, such as a notarized certification form, a certificate of insurance and minority status, a contractor affidavit, and a proposer's disclosure statement.
Engineering Services

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS