Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Brick Paver Supplier/Installer

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of RFQ-2026-0002.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

REQUEST FOR QUALIFICATIONS FOR PHASE II DESIGN ENGINEERING SERVICES FOR 22-00137-00-MS OGDEN AVENUE CORRIDOR IMPROVMENTS PROJECT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 21 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom REQUEST FOR QUALIFICATIONS FOR PHASE II DESIGN ENGINEERING SERVICES FOR 22-00137-00-MS OGDEN AVENUE CORRIDOR IMPROVMENTS PROJECT
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIllinois → Village of Brookfield
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs specialized brick pavers for sidewalks for prime contractors on Village of Brookfield corridor improvement projects. Sources and lays brick pavers as part of the streetscape improvement. Delivers installed brick paver sidewalk sections.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project at the Main Wastewater Treatment Plant in California. The scope of work includes the rehabilitation of covered and open concrete structures, relining and replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements involve the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, installation of new instrumentation and electrical components, replacement of motor control center components, modification of sluice gates, installation of slide gates, and the addition of platforms and access improvements. The project also encompasses excavation, trench work, and surveying of key points around the reactors. The estimated contract value ranges between $18.5 million and $19.5 million, with a bid opening date of December 2, 2026. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). The procurement is managed by Ranger Pipelines Incorporated, which is seeking certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and electrical work. All work must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 4 hours ago

DEADLINE

in 6 days
View Details
NAICS: 238990
New
SLED
ECLWRF Fence Replacement Project
Solicitation # RFB-JM-152
The ECLWRF Fence Replacement Project, managed by the West Basin Municipal Water District, involves replacing 2,030 linear feet of perimeter fencing at the Edward C. Little Water Recycling Facility in El Segundo, California. The scope includes installing new tubular fencing, adding a 240-linear-foot extension to an existing CMU wall to achieve a uniform 8-foot height, and repairing and repainting existing gates and fencing. The project also requires the removal and replacement of privacy screening. All work must be completed within 150 calendar days from the Notice to Proceed and is subject to a Project Labor Agreement between West Basin and the Building and Construction Trades Council of Los Angeles/Orange Counties. The contract will be awarded to the lowest bidder based on an evaluation of price, bidder qualifications, and financial ability. Bidders must submit a Bid Form, Bid Bond, Non-Collusion Affidavit, and a Small, Local and Veteran Owned Business Enterprise Program Compliance Form. Technical requirements include strict adherence to West Basin Municipal Water District Standard Specifications (2021), the use of 316 stainless steel for buried bolts and nuts, and specific purple-coded marking for recycled water identification. The project is a public work requiring compliance with state prevailing wage rates and the Build America, Buy America Act. No specific set-aside status is designated for this solicitation.
Engineering

POSTED

about 8 hours ago

DEADLINE

in 27 days
View Details

More opportunities from Illinois → Village of Brookfield

Same awarding agency

New
SLED
REQUEST FOR QUALIFICATIONS FOR PHASE II DESIGN ENGINEERING SERVICES FOR 22-00137-00-MS OGDEN AVENUE CORRIDOR IMPROVMENTS PROJECT
Solicitation # RFQ-2026-0002
The Village of Brookfield is seeking qualified engineering firms to provide Phase II Design Engineering Services for the Ogden Avenue Corridor Improvements Project. This federally funded project involves the improvement of approximately 1.02 miles of Ogden Avenue from Eberly Avenue to Custer Avenue, with an estimated construction cost of $37,000,000. The scope of work includes utility conflict resolution, combined sewer system repairs, storm sewer and water main replacement, curb and gutter replacement, sidewalk installation with brick pavers, roadway lighting replacement, and traffic signal design and coordination. The project timeline spans from 2026 through a targeted IDOT letting in 2031. Interested firms must be prequalified by the Illinois Department of Transportation (IDOT) in the categories of Highways - Roads and Streets, Special Plans - Lighting: Typical, and Special Plans - Traffic Signals. Submissions must include a Letter of Interest and a Statement of Qualifications, limited to 15 pages excluding resumes and forms, and must be delivered in both sealed physical copies and PDF format to the Public Works Director by 4:00 PM on December 16, 2026. Selection is based on a Qualifications-Based Selection process evaluating project understanding, technical approach, staff capabilities, past performance, and proximity to the site. There is no specified set-aside status for this solicitation.

POSTED

about 5 hours ago

DEADLINE

in 21 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS