Bridge Abutment Fill Slope Repair

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the repair of existing bridge abutment fill slopes for prime contractors working on bridge rehabilitation projects for the Village of Port Alice. The selected provider will utilize earth-moving equipment and geotechnical stabilization materials to execute repairs in strict accordance with project design drawings and the specified Geotechnical Report. All work must comply with the Retaining Wall Assurance Statement and the MMCD 2019 edition to ensure the delivery of stabilized and repaired slopes. The opportunity was posted on September 13, 2026, with a response deadline of November 14, 2026, falling under NAICS code 237310.

General Info

Subcontract for bridge abutment fill slope repairs in Port Alice by November 14, 2026.

Documents

This scope was carved out of 2026-01.

The full solicitation package (16 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Invitation to Tender Marina Bridge Rehabilitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyProvince of British Columbia → Village of Port Alice
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs repair of existing bridge abutment fill slopes for prime contractors on Village of Port Alice bridge rehabilitation projects. Repairs fill slopes per project design drawings and Geotechnical Report (Addendum 10208-16.2025.07.03) using geotechnical stabilization materials and earth-moving equipment. Complies with Retaining Wall Assurance Statement and MMCD 2019 edition. Delivers stabilized and repaired bridge abutment fill slopes.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details

More opportunities from Province of British Columbia → Village of Port Alice

Same awarding agency

NAICS: 237310
International
Invitation to Tender Marina Bridge Rehabilitation
Solicitation # 2026-01
The Village of Port Alice is soliciting tenders for the Marina Bridge Rehabilitation project (Solicitation 2026-01) located on Marine Drive in Port Alice, British Columbia. The scope of work includes repairing bridge abutment fill slopes, installing precast concrete block wingwalls, replacing approach barriers and guardrails, and installing a new 15.24m aluminum truss pedestrian bridge. The project is governed by the 2019 Master Municipal Construction Documents and requires strict adherence to an Environmental Mitigation Plan and Water Sustainability Act requirements. Substantial performance of the work must be achieved by June 30, 2027. This is a unit price contract where the award is not necessarily granted to the lowest bidder, but to the tenderer that best suits the long-term objectives of the Village. Bidders must submit their proposals by 4:00pm on November 13, 2026, via digital PDF or sealed hardcopy. Required submission materials include a Form of Tender, a Schedule of Quantities and Prices, a digitally certified bid bond, a baseline construction schedule, and evidence of WorkSafe BC compliance. Additionally, tenderers must provide a list of three to six comparable work experience projects and professional details for the proposed Superintendent. Contractual obligations include providing a Performance Bond and a Labour and Material Payment Bond, each valued at 50% of the contract price, issued by a surety licensed in British Columbia. Technical requirements specify the use of Alloy 6061-T6 and 5083-H112 for the pedestrian bridge and a minimum concrete strength of 25 MPa for shipping and handling of precast elements. Quality control measures require the submission of concrete test results at least one week prior to the start of work and the implementation of an engineered lifting plan for any critical lifts.
Highway, Street, and Bridge Construction

POSTED

about 2 months ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS