Bridgeport Rehab

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Caltrans, District 9 - Bishop

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(4)

EPIMS-MOO-56206-R6 Notice of Determination for Bridgeport Rehab Project

PDFnotice-of-determination

Memo Request to Replace NOD SCH 2023030750

PDFmemo

Memo for Bridgeport Rehab Project NOD Correction SCH 2023030750

PDFmemorandum

Notice of Determination for Bridgeport Rehab Project EPIMS-MOO-56206-R6

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 9 - Bishop
Contacts2 people available
OfficeN/A
Organization / Agency
California → Caltrans, District 9 - Bishop
Office AddressN/A
Contacts
Christopher BriggsSenior Environmental Scientist (Specialist)
Dennee Alcala SrTransportation Planner

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMSMOO-56206-R6, pursuant to Section 1602 of the Fish and Game Code to Caltrans District 9. Activities for Location 1 are limited to (1) the removal of willows, (2) the installation of a temporary diversion culvert, sandbag berm, pump system with fish screens, and outflow settling basin for dewatering the work area, (3) the installation of a concrete spillway along the full width of the channel bed, from approximately 20 feet upstream of the bridge deck, under the bridge deck, and to approximately 10 feet downstream of the bridge deck, (4) the installation of un-grouted rock slope protection on bank slopes and in the channel bed beyond the edge of the concrete spillway, up to 100 feet upstream of the bridge deck, and 25 feet downstream of the bridge deck, and (5) removal of the temporary culvert and diversion system after completion of construction activities. Activities for Location 2 are limited to the in-kind replacement of one 24-inch corrugated steel pipe culvert under US-395, replacement of a flared end section at the culvert inlet, and installation of a new flared end section at the culvert outlet. Activities for Location 3 are limited to the in-kind replacement of an approximately 75- foot-long 24-inch-diameter culvert under US-395, removal of an existing inlet headwall, installation of an approximately 10-foot-long culvert extension at the culvert inlet, installation of a flared end section at the culvert inlet, grading near the culvert inlet, and installation of a flared end section at the culvert outlet

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process improvements to remove per- and polyfluoroalkyl substances from surface water supplies. The project is solicited under the number LACSD Surface Water PFAS Removal Project No. 251 CA and is open to Disadvantaged Business Enterprises as part of a Department of Transportation set-aside initiative, aiming to promote equitable participation in infrastructure development. Work must be executed in accordance with federal and state regulatory requirements for water quality and environmental protection, with performance localized to the two treatment plant sites in California. Solicitation was posted on August 8, 2026, with responses due by September 3, 2026, and the North American Industry Classification System code 237310 applies, indicating it is a water and wastewater plant construction project. The contracting entity is Pyramid Building & Engineering, Inc., serving as both the organization name and agency, with primary contact for inquiries being John Garrison, reachable via phone or email. All proposals must align with technical specifications for PFAS removal technologies and integration into existing plant infrastructure, ensuring compliance with long-term water safety standards and operational reliability.
Pyramid Building & Engineering, Inc.

POSTED

about 4 hours ago

DEADLINE

in 25 days
View Details