Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on August 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bridging Documents And Owner's Representative Services Design-Build Tenant Improvement Project For 140 Marine View Ave., Solana Beach CA

Closed
20260825053State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541611
New
Business Impact Analysis, Disaster Recovery, and Business Continuity Plan Services (RFP-VC-26-006), Inland Empire Utilities Agency (California)
Solicitation # RFP-VC-26-006
Hagerty Consulting, Inc. is seeking a Disadvantaged Business Enterprise (DBE) subcontractor to support an engagement with the Inland Empire Utilities Agency (IEUA) in California. The project focuses on enhancing the agency's operational resilience framework through the development and review of a Business Impact Analysis (BIA), Disaster Recovery Plan (DRP), and Business Continuity Plan (BCP), as well as the creation of recovery playbooks. The scope of work includes joining client workshops, supporting assessments, and facilitating in-person tabletop exercises to identify response gaps. Preferred subcontractors will possess expertise in IT/OT resilience and experience within the water, wastewater, or critical infrastructure sectors. The overall contract has an initial term of three years with options to extend and is funded by the Environmental Protection Agency (EPA). Deliverables must align with FEMA Continuity Guidance Circular and Business Continuity Planning frameworks, while the Disaster Recovery Plan must adhere to CISA and NIST standards, specifically the NIST Risk Assessment Framework. This is a prevailing wage contract subject to the California Labor Code, requiring registration with the Department of Industrial Relations. Award selection is based on a single-award basis, evaluating the offeror's past performance in the utility sector, personnel qualifications, staffing methodology, and cost-effectiveness. Proposals are due electronically via PlanetBids by November 17, 2026.
Hagerty Consulting, Inc.

POSTED

about 3 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The Santa Fe Irrigation District is soliciting proposals for professional Owner's Representative services under Contract J-2600 to support a design-build tenant improvement project at 140 Marine View Ave. in Solana Beach, California. The project involves renovating approximately 10,000 square feet of a 16,000-square-foot office building to create administrative offices, a customer service counter, a training center, and a Board room. The scope includes HVAC and electrical modifications, IT infrastructure, site security upgrades, backup power, and ADA improvements. The selected consultant will act as the District's advocate throughout the project lifecycle, from developing Owner's Project Requirements and bridging documents to managing design validation, GMP negotiations, construction oversight, and final closeout. The District aims for full occupancy by late summer or early fall 2027, with the specific services expected to take approximately 6 to 8 months to complete. Proposals are due by September 18, 2026, and will be evaluated based on best overall value, with cost serving as one of several factors. The selected firm must provide a detailed fee proposal, including a cost breakdown and rate table, and must comply with California Public Contract Code and prevailing wage laws. Key responsibilities for the Owner's Representative include coordinating independent inspections and testing, managing the substantial completion punch list, and assisting in the procurement of the Design-Builder. Technical standards for the project include adherence to the Equipment Mechanical Code and Title 24 for air handling systems, as well as specific quality standards for installation materials and appliances. Selected consultants must be able to provide necessary insurance certificates and bonding within seven calendar days of notification.

General Info

Proposals for design-build tenant improvement services in Solana Beach due September 18, 2026.

Documents

3

Kashi TI Improvement Plans – Mechanical/Plumbing Sheets

PDF, High priority: read this firstspecifications
High

RFP J-2600 Owner's Representative Services - 140 Marine View Ave

PDF, High priority: read this first29 pages · rfp
High

Attachment C - Template Cost Proposal Spreadsheet.xlsx

XLSX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Fe Irrigation District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Marissa PotterDirector of Engineering Services

Full Description

Show more
Bid #J-2600: $18

More opportunities from California → Santa Fe Irrigation District

Same awarding agency

NAICS: 541330
New
SLED
Replacement/Refurbishment Of Two Above Ground Pipeline Bridge Crossings Project
Solicitation # J-2700
The Santa Fe Irrigation District (SFID) is soliciting professional engineering design services for Project J-2700, which involves the replacement or refurbishment of two above-ground pipeline bridge crossings in Rancho Santa Fe, California. The project focuses on a 12-inch diameter pipeline installed in 1977 and an 18-inch diameter pipeline installed in 1982. The primary objectives are to assess structural and seismic adequacy according to current standards, estimate the remaining useful life of the infrastructure, determine necessary improvements for seismic reliability, and identify all permitting requirements, including CEQA compliance. Key deliverables include a Determination of Required Improvements Memorandum and a Preliminary Design Report featuring technical specifications, cost estimates, and construction schedules. This is a time-and-materials contract with an expected performance duration of approximately 20 weeks. Selection is based on a most-qualified process, where SFID will rank firms and negotiate a fair and reasonable compensation package. Proposals must be submitted as a searchable PDF and are limited to 40 pages, excluding resumes, references, and fee proposals. Technical requirements specify that all welding must be coated with electrolytic resin and steel casing or exposed ductile iron pipe must be painted purple per WAS specifications. Additionally, the selected consultant must comply with California Prevailing Wage Laws and adhere to NCTD safety requirements for any personnel entering the railroad right-of-way. Invoicing occurs on a monthly cycle and must be accompanied by detailed progress reports.
Engineering Services

POSTED

6 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS