Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Vermont was posted on July 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Broad Brook Road Slope Stabilization and Road Reconstruction

Closed
73917State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE) and Veteran-Owned Small Business Enterprises (VSBE) for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering site preparation, utilities, asbestos abatement, tunneling, boring, and jacking, as well as asphalt and concrete paving, electrical work, and telecommunications. Bidders must provide evidence of certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code, requiring firms performing onsite work to be signatory to collective bargaining agreements with various trade unions. Responsive bidders must possess a valid California Contractor’s license and provide acceptable insurance. Subcontractors and material contractors may be required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. The project is partially funded by several grants, including those from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, meaning it must adhere to DBE Program requirements. Interested firms must contact the Lead Estimator to receive an Invitation to Bid through the BuildingConnected system. The deadline for responses is September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 10 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The project involves stabilizing a slope failure along the southeast side of Broad Brook Road in Royalton, Vermont, which occurred during July 2023 flooding events that scoured the slope toe and damaged the roadway and guardrail. The work includes removing a temporary concrete retaining wall and 12-foot temporary roadway, constructing an 18-foot permanent gravel roadway, and implementing permanent slope stabilization measures both upslope and downslope of the road. Additional tasks encompass excavation, dewatering, grading, backfilling, erosion control installation, temporary stream relocation, guardrail replacement, and removal and disposal of unsuitable materials and debris. All work must comply with the 2024 Vermont Agency of Transportation Standard Specifications for Construction and adhere to VOSHA/OSHA safety regulations. The contractor is responsible for providing all labor, equipment, materials, and safety measures including trenching and shoring, and must contact Dig-Safe to secure a ticket number prior to any excavation. The project is funded through FEMA Public Assistance Category B emergency funding and must reach substantial completion no later than October 30, 2026, with full completion expected by November 30, 2026. Liquidated damages will be assessed for failure to meet the substantial completion deadline. The Town of Royalton, through its authorized representative, retains authority to inspect and accept work on-site, ensuring compliance with technical standards and overall satisfaction. The solicitation, numbered 73917, was posted on July 1, 2026, with a bid deadline of August 7, 2026, and anticipated award on August 11, 2026. Bids must be submitted as sealed physical packages to the Town of Royalton Town Office and may not be submitted electronically. A bid guarantee of at least 5% of the total bid amount is required in the form of a certified check or bid bond. Offerors must submit the Contractor’s EEO Certification Form (CA-109), the Debarment and Non-Collusion Affidavit (CA-91), and must comply with the Byrd Anti-Lobbying Amendment for contracts over $100,000. Site visits are encouraged but not mandatory. The estimated contract value ranges between $1,000,000 and $1,500,000 based on the engineer’s estimate. While the contract type is not explicitly stated, the fixed scope and defined

General Info

Stabilize collapsed slope, rebuild 18-ft gravel roadway, perform erosion control, and replace guardrail by October 30, 2026.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

(1)

Broad Brook Road Slope Stabilization and Road Reconstruction Invitation to Bid 2026

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressVT, USA

Full Description

Show more
Description of Work: The purpose of this project is to stabilize slope failure and reconstruct Broad Brook Road. The slope along the southeast side of the roadway failed during the flooding events in July 2023. The toe of the slope has been scoured by Broad Brook and the resulting slope failure impacted Broad Brook Road and its guardrail. This project includes the following major elements; removal of temporary existing concrete waste block retaining wall on the uphill side of Broad Brook Road, removal of the existing 12ft wide temporary roadway and construction of the 18ft wide permanent gravel roadway, and permanent slope stabilization measures both up and down slope of Broad Brook Road. See attached Drawings and Special Provisions for details on the required work. • The project shall be substantially completed no later than October 30, 2026. Liquidated damages will apply for failure to obtain substantial completion within the Contract Time. • All work shall be done to the satisfaction of the authorized Town representative, and shall comply with the 2024 version of the Vermont Agency of Transportation’s Standard Specifications for Construction. https://vtrans.vermont.gov/highway/construct-material/construct-services/pre-contractspecifications/vermont • The contractor shall provide all labor, equipment, and materials, including safety measures (trenching and shoring), required to perform the necessary work. • Work shall consist of, but not be limited to, excavation, dewatering, grading, backfill, erosion controls, roadway replacement, removal and disposal of the existing temporary roadway, removal and disposal of unsuitable material, temporary relocation of stream, guardrail replacement, and all other items appurtenant to the project. • The Contractor shall be responsible for calling Dig-Safe and securing a ticket number prior to work. • The Contractor shall perform all work in compliance with VOSHA/OSHA regulations. • The project is receiving FEMA Public Assistance (PA) funding and is Category B emergency work.

More opportunities from Vermont → Department of Economic Development

Same awarding agency