Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New Mexico was posted on March 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Broadmoor, Galaxy, & Sirius PHMSA Grant Pipeline Rehab

Closed
25-26-054State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237120
New
SLED
WH Ford RTC Fueling System Repairs, Kentucky
Solicitation # W9128F27RA054
The WH Ford RTC Fueling System Repairs project is a design-build effort located in Greenville, Kentucky, managed by the Bristol Alliance of Companies. The scope of work involves comprehensive upgrades and repairs to the fueling system, including upgrading tank automatic tank gauges (ATG), repairing dispenser and offload concrete, installing emergency fuel shut-off (EFSO) systems, and mounting leak detector probes on two diesel above-ground storage tanks. Additional requirements include providing concrete circulation pavement, replacing canopy and fuel pipe coatings, installing splash blocks, replacing roof penetration boot seals, providing dead man control for truck loading, and modifying tank access platforms. All tanks must be cleaned and vapor-free before work begins, and the project must adhere to UFC, NFPA, and ASTM standards, as well as ADA and ABA accessibility guidelines. This firm-fixed-price solicitation (W9128F27RA054) uses a Lowest Price Technically Acceptable (LPTA) selection process. Proposals must be submitted in two separate volumes: a technical volume covering specialized experience, a Gantt chart for the contract duration, and a technical approach, and a separate pricing volume. The period of performance is 410 calendar days, with a final delivery date of June 18, 2027. The contractor is required to maintain a quality control system complying with FAR 52.246-12 and must adhere to Davis-Bacon Act wage determinations. There is no specific set-aside status for this contract.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 28 days
NAICS: 237120
New
International
Expansion And Improvement of Fuel Storage Facilities at OSESGY Premises In Aden, Yemen Chief Procurement Unit
Solicitation # EOIOSESGY24933
The Office of the Special Envoy of the Secretary-General for Yemen requires a qualified contractor to expand and improve diesel fuel storage facilities at its Office and Accommodation premises in Aden, Yemen. The project involves the supply, installation, testing, and commissioning of a horizontal diesel tank with at least 20,000 L capacity at the Office and a vertical tank with at least 5,000 L capacity at the Accommodation. Key tasks include improving fuel containment, enhancing maintenance access, reinstating finishes, and connecting to existing generator fuel systems while ensuring an uninterrupted diesel supply during the works. The project must be completed within two calendar months from the commencement date. Interested vendors must be registered at least at the Basic Level in UNGM to be considered. Required documentation includes a signed Qualification Checklist, a company registration certificate showing at least three years of operation in Yemen, and a company profile. Contractors must demonstrate experience in at least three similar projects valued at USD 30,000 or more completed within the last five years. Additionally, the contractor must provide qualified key personnel, including a Project Manager and Civil Engineer with five years of experience, and commit to warranties covering materials for one year, workmanship for two years, and structural works for ten years.
UN Secretariat

POSTED

1 day ago

DEADLINE

N/A
NAICS: 237120
New
SLED
Hammerman Gas/Diesel Tank Replacement Gunpowder Falls State Park
Solicitation # BPM059366
This project involves the removal and replacement of above-ground gasoline and diesel fuel storage systems at the Hammerman Area of Gunpowder Falls State Park in Middle River, Baltimore County, Maryland. The scope of work requires the contractor to provide all labor, equipment, materials, insurance, and permits to remove existing tanks, dispensers, piping, electronic systems, concrete pads, and bollards. The installation includes a 2500-gallon gasoline tank and a 1000-gallon diesel tank, along with new concrete pads, side-mount dispensers, pumps, and a magnetic digital Automatic Tank Gauge. To maintain operations during the project, the contractor must provide temporary gasoline and diesel tanks with metered dispensers. This is a Small Business Reserve Procurement, limited to certified small businesses. The procurement has established participation goals of 15% for Minority Business Enterprises (MBE) and 2% for Veteran-owned Small Business Enterprises (VSBE). The contract is estimated between $100,000 and $500,000, with the award based on the lowest responsive and responsible bidder. All work must comply with Maryland Department of the Environment regulations, NFPA 30, 30A, and 78 fire safety standards, as well as API standards 650, 620, and recommended practice 1604. Final acceptance is contingent upon approval from the Facility Manager and DNR Project Engineer, and requires the submission of inspection certificates and disposal manifests.

POSTED

4 days ago

DEADLINE

in 22 days
NAICS: 237120
New
SLED
27-006 Gas Utility Installer
Solicitation # 27-006
The City of Commerce is seeking a gas utility installer for a one-year contract, with options to renew annually for up to three additional years. The scope of work focuses on the installation of gas mains using directional boring, specifically including 3-inch and 4-inch polyethylene gas mains and 3-inch tap, stop, or bottom out steel tie-ins. This is a solicitation for a SLED organization in Georgia, and there is no specified set-aside status for this opportunity. Proposals will be evaluated by a committee based on cost (40 points), proposal completeness (20 points), quality of previous similar projects (20 points), project understanding (15 points), and the ability to meet the timeline (5 points). The City reserves the right to select the response that is in its best interest. Payment is processed 30 days after the completion of construction and successful testing of all installed products, subject to available funds. Contractors must provide a bid bond of at least 5% and a performance bond equal to 100% of the construction contract amount upon completion. Required insurance includes general liability covering $1,000,000 per incident and Georgia-mandated workman's compensation. Additionally, the successful vendor must provide operator qualifications, a drug and alcohol testing plan, and submit PHMSA Drug and Alcohol Testing Data to the City on a quarterly basis. Submissions must be delivered in a sealed package by December 21, 2026.
City of Commerce

POSTED

5 days ago

DEADLINE

in 28 days
NAICS: 237120
New
SLED
Restoration Projects Statewide Order Draft Program Environmental Impact Report
Solicitation # 2019100230
The State Water Resources Control Board is managing a series of statewide restoration projects under a Program Environmental Impact Report to enhance aquatic and riparian habitats for anadromous salmonids and native species. A primary focus of these efforts is the Sunset Weir and Pumps Fish Passage Project in Sutter County, which involves removing the existing Sunset Weir from the Feather River to restore fish migration, installing five fish screens at the Sunset Pumps intake, constructing a new wet well, replacing outdated water diversion infrastructure, and stabilizing the left bank with vegetated rock slope protection. Additionally, the project includes filling the downstream scour pool and capping it with spawning grade gravel to create suitable substrate. These initiatives are part of a broader set of restoration activities across California, including projects in Butte, Fresno, Madera, Siskyou, Shasta, Tehama, and Plumas counties. Key deliverables across these sites include the construction of fishways, floodplain excavation, and the creation of side channels and habitat units. All projects are conducted in compliance with the California Environmental Quality Act and the Public Resources Code, with various agencies such as the Wildlife Conservation Board and the Central Valley Flood Protection Board serving as lead or responsible agencies. Performance for specific sites, such as the Arroyo Canal project, includes long-term land use leases extending through 2045.
State Water Resources Control Board

POSTED

6 days ago

DEADLINE

N/A

AI Contract Overview

Show more

The City of Las Cruces is soliciting bids for general construction services related to gas pipeline and service replacement under the Broadmoor, Galaxy, & Sirius PHMSA Grant Pipeline Rehab project. The scope includes micro surfacing restoration as well as the repair and restoration of sidewalks, drive pads, and landscaping where necessary. This solicitation aims to improve infrastructure within New Mexico, with work primarily focused on pipeline rehabilitation in the designated service areas. The contract is managed by the Utilities department of the City of Las Cruces, with key contacts including Kristin Montoya, Senior Engineer, and Donny Prosise, Purchasing Supervisor. Interested parties must submit their responses by the deadline on May 5, 2026. The solicitation was officially posted on March 27, 2026, and does not specify a set-aside type or NAICS code. All work will be performed within New Mexico, and contractors can access additional project information through the city's procurement portal.

General Info

Las Cruces seeks bids for gas pipeline rehab, restoration, landscaping; deadline May 5, 2026.

Documents

5
DOCX, High priority: read this firstbid-lot
High
DOCX, Low priorityother
Low
PDF
PDF
PDF

Read all 5 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • WH Ford RTC Fueling System Repairs, KentuckyOpen now, due in 28 days
  • West Power Complex Fuel Delivery SystemOpen now, due in 43 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew Mexico → Utilities
Contacts2 people available
OfficeLas Cruces, NM, 88001, USA

Interested Companies (9)

Build-XMesilla, NM
Construction ReporterAlbuquerque, NM
J29 EnterprisesLas Cruces, New Mexico

See All 9 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The City of Las Cruces (City) is seeking general construction services for gas pipeline and service replacement, micro surfacing restoration, and restoration of sidewalks, drive pads, and landscaping as necessary.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS