Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Bruin & Sponge Creek AOP Synopsis

Active
R6-14-48355Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves two Aquatic Organism Passage Improvement projects on the Umatilla National Forest, targeting Bruin Creek and Sponge Creek, located south of Pendleton, Oregon. These projects focus on replacing existing corrugated metal pipe culverts, which currently obstruct threatened and endangered native fish passage, with precast or prefabricated structures designed to simulate natural stream conditions. The work includes removal of the current culverts, stream channel reconstruction with rock placement to mimic natural steps and streambeds, as well as de-watering activities involving creek re-direction and installation of erosion and pollution control measures. Both sites require all in-stream activities to be completed within the designated Oregon Department of Fish and Wildlife in-stream work window, running from July 15 to August 15, with any exceptions requiring approval. The solicitation, issued by the Wallowa Whitman National Forest under the Department of Agriculture, was posted in late 2010 with the aim of allowing contractors sufficient lead time to prepare for the project. Contractors are strongly advised to visit project sites prior to seasonal weather restrictions, as access will become limited. Plans from similar nearby projects are provided for reference but are only exemplary, emphasizing the need for on-site evaluation. The work aims to enhance aquatic organism passage by replacing barriers and restoring the natural flow and habitat conditions in these streams, ensuring compliance with environmental guidelines and protection of native species.

General Info

Replace culverts in Umatilla National Forest to improve fish passage, completed within summer window.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Umatilla National Forest (see directions above), PENDLETON, OR, 97801, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Wallowa Whitman National Forest
Contacts1 person available
OfficeBAKER CITY, OR, 97814, USA
Office AddressBAKER CITY, OR, 97814, USA
Contacts
Paul GerberCivil Engineer

Full Description

Show more
Bruin & Sponge Creek AOP Synopsis The Umatilla National Forest will be advertising two Aquatic Organism Passage Improvement projects for implementation in 2011. The following projects may be combined under the same advertisement. Project Name: Bruin & Sponge Creek Aquatic Organism Passages Project Locations: Bruin Creek: Approximately 75 miles south of Pendleton, OR. Take Exit 209 on Interstate 84 and head south on U.S. Hwy 395 for 61.3 miles. Turn left onto Forest Road 55 and continue .7 miles. Turn right onto Forest Road 10. Continue on Forest Road 10 for 12.51 miles and arrive at Bruin Creek. Sponge Creek: Follow directions above to Bruin Creek. From Bruin Creek, continue on Forest Road 10 for 5.2 miles and arrive at Sponge Creek. Project Start Date: The Oregon Department of Fish and Wildlife (ODFW) in-stream work window for these locations is July 15th to August 15th. Work that has no influence on the stream can begin prior to the in-stream work window. All in-stream work must be completed within this work window. Any time extension of the in-stream work window must be approved by ODFW. Project Background Bruin Creek passes under Forest Road 10 through a corrugated metal pipe (CMP) with a horizontal dimension of 72" and a vertical dimension of 82". The CMP is approximately 102.2' in length. This structure currently is a barrier to T&E and native fish. Sponge Creek passes under Forest Road 10 through a 78" CMP that is approximately 64.1' long. This structure currently is a barrier to T&E and native fish. Project Description: Work at both of these sites includes the removal of the above mentioned existing culverts and the installation of a precast/prefabricated structure. Also included is stream simulation work in the channel. This work includes placing rock for steps and streambed. De-watering is required for these projects. This includes re-directing the creek for the duration of the project and installing erosion and pollution controls devices during installation of the new structures and stream simulation work. The Umatilla National Forest intends on advertising these projects during the winter months so that adequate time will be given to the awarded contractor to acquire the appropriate materials and be prepared to complete all work within the allotted in-stream work window. For this reason it is strongly recommended that all interested/prospective contractors visit each site before they become inaccessible due to weather. Attached are plans from similar projects that have been completed in the same general area. The Battle Creek site in the attached plans is similar to the Bruin Creek site and the Lucas Gulch site in the plans is similar to the Sponge Creek site. Note: These drawings are to be used as an example only. It is strongly recommended that all interested parties visit each site. When this posted as a solicitation the solicitation number will change.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

1 day ago

DEADLINE

in 23 days
View Details

More opportunities from Department Of Agriculture → Wallowa Whitman National Forest

Same awarding agency

NAICS: 237310
New
Federal
Custer Gallatin National Forest Ashland and Sioux Road Maintenance
Solicitation # 1240BE27Q0003
Solicitation 1240BE27Q0003 is a request for quotations for a firm-fixed price commercial services contract to provide road maintenance grading services for the Custer Gallatin National Forests within the Ashland and Sioux Rager Districts. The scope of work includes one lump sum for mobilization and an estimated 46.9 miles of surface maintenance and grading. This acquisition is a total small business set-aside under NAICS code 237310, with a size standard of 45.0 million dollars. The project requires adherence to specific industry standards for surface restoration, drainage maintenance, and defect repair, while complying with general fire safety requirements and wage determinations for Montana and South Dakota. Award will be based on the most advantageous technical approach, provided the pricing is fair and reasonable and past performance is rated as acceptable or neutral. To be considered responsive, offerors must provide detailed equipment identification, an operational approach for grading and drainage restoration, and management procedures for quality control and coordination with the Contracting Officer's Representative. Quotations must be submitted via email to the contracting officer by November 10, 2026, at 1:00 PM MT. Evaluation will include a review of relevant contracts performed within the last three years to assess the offeror's ability to meet the project's scope and complexity.
Highway, Street, and Bridge Construction

POSTED

3 days ago

DEADLINE

in about 1 year
View Details
NAICS: 335912
Federal
Battery System Supply and InstallationThe contract entails the supply and installation of a battery backup system designed for off-grid power applications, with full integration capabilities for solar energy and generator inputs to ensure continuous and reliable power delivery. The system must comply with all applicable safety standards, including NEC Article 706, which governs energy storage systems, as well as other federal and local electrical codes to guarantee safe operation and structural integrity. Work scope includes site assessment, component procurement, system configuration, installation, testing, and commissioning, with all materials and labor meeting the highest industry standards for durability and performance in remote or rugged environments. This is a small business set-aside subcontract under the SBA program, exclusively available to small businesses as defined by the North American Industry Classification System code 335912, which covers other electrical equipment and component manufacturing. The contracting agency is the Wallowa Whitman National Forest, operating under the U.S. Department of Agriculture, and the work is expected to support off-grid power needs at remote forest service locations. Although specific location details are not provided, performance is anticipated to occur within areas managed by the agency. The solicitation was posted in May 2026 and is accessible through the SAM.gov platform, with no designated point of contact listed in the provided data.
Primary Battery Manufacturing

POSTED

6 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS