Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Buck's Landing Dock Replacement Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

North San Pedro Rd and Bucks Landing Rd, San Rafael, CA, 94903

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Interested Companies (1)

PCI EcologicalSebastopol, CA

Full Description

Show more
The proposed project would include demolition of the existing pier, gangway, floating dock, and floating dock guide piles. It would include construction of a replacement pier, gangway, and floating dock to provide safe and reliable access to Gallinas Creek and San Pablo Bay through a full range of tide cycles and allow free tidal flow during king tide events and storm surges. The proposed project would also include construction of a new raised boardwalk and at-grade concrete walkway to improve accessibility from the newly constructed replacement dock to the existing restrooms to the southwest. An additional accessible parking stall would be constructed near the pier and boat dock.

More opportunities from California → Marin County Open Space District

Same awarding agency

NAICS: 237990
SLED
Buck Gulch Falls Creek Restoration and Trail Improvement ProjectThe Buck Gulch Falls Creek Restoration and Trail Improvement Project aims to restore Arroyo de San Jose Creek and its connected ephemeral streams while enhancing safe, sustainable, and inclusive trail access for all users along Spyglass Trail and Buck Gulch Falls Trail to Buck Gulch waterfall within the Ignacio Valley Open Space Preserve. Key improvements include installing two bridges to redirect visitor traffic away from the creek, adding a puncheon and boardwalk across unnamed streams, upgrading nearly 2,240 feet of existing trail, and realigning 850 feet of trail to move it away from eroding streambanks. The Buck Gulch Falls Trail will transition from hiker/equestrian use to hiker-only, and four fill slope walls will be constructed near the waterfall viewing area to stabilize the trail. Additional enhancements involve installing new fencing and signage, decommissioning and restoring 850 feet of degraded trail, and rehabilitating nearly 19,500 square feet of eroding streambank and riparian habitat. These efforts are designed to reduce environmental degradation, protect water quality, and preserve habitats for listed aquatic species by minimizing sedimentation and erosion. The project will employ erosion control measures such as straw wattles at trail transitions, aggregate base rock surfacing at bridge approaches, and seed and mulch applications on disturbed soils to support revegetation. All work aligns with the Regional Trail Management Plan policies, best management practices, Marin County Open Space District trail design standards, and its Inclusive Access Plan to ensure accessibility and sustainability. The initiative is led by the Marin County Open Space District with primary coordination handled by Senior Natural Resources Planner Jason Hoorn and Principal Environmental Planner Carrie Lukacic. The project was posted in June 2026 and is located in Novato, California, with the goal of creating a resilient, low-impact trail system that balances public access with ecological preservation in a sensitive riparian environment.
Other Heavy and Civil Engineering Construction

POSTED

22 days ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Cascade Canyon Trail Bridge Project
Solicitation # MCP 2026-07
The Cascade Canyon Trail Bridge Project (MCP 2026-07) is a solicitation by the Marin County Open Space District for the installation of two prefabricated weathered steel connector style truss recreational bridges with redwood decks over San Anselmo Creek in the Cascade Canyon Open Space Preserve in Fairfax, California. The project includes a 90-foot bridge and a 60-foot bridge, both 6 feet wide, positioned above the 100-year flood elevation. Key construction tasks involve installing concrete spread footings, engineered fill for bridge approaches, repairing rock riprap slope protection, and creating compacted road and trail surfaces. Additionally, the contractor will realign existing trails, decommission the High Water Trail and a Canyon Trail spur, and install split rail fencing and signage to improve visitor safety and reduce creek sedimentation. Bids are due electronically by 2:00 PM PST on December 3, 2026, and will be awarded to the lowest responsible, responsive bidder based on the Total Base Bid. Qualified bidders must possess a valid Class A License and be registered as public works contractors with the Department of Industrial Relations. Evaluation criteria include financial strength, a track record of completing at least five similar projects in the San Francisco Bay Area, and the submission of a list of at least three similar or larger bridge projects. The project is divided into two phases: preconstruction activities starting within 15 calendar days of the first Notice to Proceed, and on-site construction, which cannot begin before August 1, 2027, and is allotted 48 working days for completion. Required documentation includes a 10% bid bond, a 100% performance bond, a payment bond, and certifications regarding debarment, suspension, and equal employment opportunity.
Highway, Street, and Bridge Construction

POSTED

24 days ago

DEADLINE

in 7 days
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS