Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 23, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Buffalo River Submerged Aquatic Vegetation (SAV)

Awarded
W912P416B0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Golf Club Green And Tee Box Renovation
Solicitation # 6209
Solicitation 6209 is for the comprehensive renovation of the Santa Barbara Golf Club in California, specifically focusing on the #10 Tee Box and the #13 Green. The scope of work includes releveling and expanding the #10 Tee Box to meet playability and drainage standards, reshaping the #13 Green through contouring and fine grading, and fully renovating the #13 greenside bunkers with new excavation, drainage, and liner placement. Technical requirements include the installation of USGA greens subsurface drainage, a 12-inch root zone mixture, and sodding with Centennial Bentgrass and Kikuyu grass. The project is expected to begin around November 2026 and must be completed within six weeks, with work permitted Monday through Friday from 7:00 a.m. to 5:00 p.m. Bidders must hold a valid California A - General Engineering or C-27 Landscaping contractor's license and submit their proposals via the PlanetBids portal by November 9, 2026. Award evaluation factors include the length and scope of manufacturer warranties and offered payment discounts. The contract mandates compliance with California prevailing wage laws, OSHA safety standards, and ADA regulations. Financial protections include a required payment bond for 100% of the bid total for contracts exceeding $25,000 and liquidated damages of $2,000 per calendar day for delays. Acceptance of the work is contingent upon the approval of the finished subgrade by the designer and the submission of all relevant warranty and guarantee documents.
Santa Barbara Golf Club

POSTED

about 8 hours ago

DEADLINE

in 10 days
NAICS: 237990
New
SLED
Henry H. Bradby Park Phase 1
Solicitation # 2027-7110-114
Solicitation 2027-7110-114 is an Invitation for Bid issued by the Isle of Wight County Parks and Recreation department for the Phase 1 construction of Henry H. Bradby Park in Smithfield, Virginia. The project involves the development of approximately 6.63 acres of a 51.67-acre county-owned parcel, with the remaining land designated as undisturbed open space. The scope of work includes initial site preparation, clearing, demolition, grading, and the installation of civil infrastructure such as drainage and stormwater management facilities. Key public amenities to be constructed include a gravel parking lot, playground, picnic shelter, basketball court, walking trails, site furnishings, and landscaping. All work must be substantially complete within 300 days of the notice to proceed, with final completion due 45 days thereafter. The project is funded through the National Park Service Land and Water Conservation Fund, making it subject to strict federal oversight, including Build America, Buy America Act material sourcing restrictions and compliance with various federal and state civil rights and disability acts. Bidders must provide a bid bond equal to five percent of the total bid value for projects exceeding 500,000 dollars. Award will be granted to the lowest responsive and responsible bidder, with evaluation factors including quality, qualifications, and conformity to specifications. Technical compliance is required under the 2018 Virginia Statewide Building Code, VDOT Road and Bridge Standards, and the Virginia Stormwater Management Handbook. Bids must be submitted via the designated Procurement Portal by November 16, 2026, at 3:00 pm.
Parks & Recreation

POSTED

about 8 hours ago

DEADLINE

in 17 days

General Info

Contract Value

$1,555,653

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

See attached figure., BUFFALO, NY, 14207, USA

Set-Aside

SBA

Award Issued Date

Documents

7
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstifb
High
PDF, Low prioritybid-abstract
Low
PDF, Low priorityindustry-day
Low
PDF, Low prioritypresolicitation
Low
PDF, Low priorityq-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Aug 3, 2016 to Sep 20, 2016. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 20, 2016 to Sep 22, 2016. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Buffalo
Contacts2 people available
OfficeBUFFALO, NY, 14202-0000, USA
Office AddressBUFFALO, NY, 14202-0000, USA
Contacts
Casimir BrzozowiecContract Specialist
Frank D'AndreaContract Officer

Full Description

Show more
The Buffalo District is currently preparing a solicitation to award a contract to enhance aquatic habitat within the Buffalo River and by extension habitat in Lake Erie. The Buffalo River drains a 447 square mile watershed, emptying into the eastern end of Lake Erie at the City of Buffalo. The banks of the lower Buffalo River are beset with urban/industrial use facilities that modified and hardened river banks. Submerged vegetation is sparse throughout this part of the river. The urban/industrial use of the river has greatly declined over the years as the amount of heavy industry in the region has declined. Many adjacent urban/industrial use facilities were abandoned and are now being revitalized for new proposes. In many of these areas modified and hardened shorelines are no longer needed and are candidates for improvement and/or restoration under the USEPA Great Lakes Restoration Initiative (GLRI) Program. Improvements to habitat in the lower Buffalo River are directly linked to restoration initiatives for Lake Erie. Three proposed aquatic habitat restoration sites have been identified for this project. These sites are located within the city of Buffalo, in the Buffalo River. The sites have been named for their association with upland development. The Ellicott site is located at river mile (RM) 1.2, the Savarino site is located at RM 1.5, and the Irish Propane site is located at RM 2.1 (figure provided as attachment). All of the sites are located on the right bank of the river and consist of the shallow water areas between the shorelines and the edge of the navigation channel. Specific work to be performed for each reach is currently being finalized. Measures for the restoration of aquatic habitat will include the installation of in?water structure features such as locked logs and rootwads, and the planting of submerged and emergent vegetation. Aquatic vegetation has been observed growing in one of the proposed project locations (Savarino). Work at this site will enhance the established vegetation. Design for this project is modeled after the actions proposed by Buffalo Niagara River Keeper for the River Fest Park/BMGC and Blue Tower Turning Basin In?water and Shoreline Habitat Restoration Project. This project is one of a number of projects seeking to reestablish habitat in the Lower Buffalo River. All projects in the vicinity will require monitoring after completion. Responsibility for monitoring is expected to fall under the jurisdiction of USEPA. Specific to this project, the contract requirements will include a one year warranty on plantings. This project is funded through the USEPA Great Lakes Restoration Initiative (GLRI) Program, and is being accomplished for USEPA under the authority of the Economy Act (31 U.S.C. 1535) by the USACE. Note: a response is not required at this time.

More opportunities from Department Of Defense → W072 Endist Buffalo

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS