This Solicitation opportunity from California was posted on September 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BUILDING 315 ADMINSTRATION OFFICES RENOVATION

Closed
210007State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a total small business set-aside solicitation for a single firm fixed price contract. The scope of work involves a comprehensive interior modernization of Building 262, including the replacement of corridor and classroom flooring with LVP and carpet tiles, full restroom remodeling with new plumbing fixtures and partitions, and the installation of raised flooring with integrated electrical distribution for classrooms. Additional requirements include updating doors and life-safety components, repainting interior surfaces, replacing variable air volume systems, and upgrading lighting controls. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Proposals are due by November 18, 2026, and will be evaluated using a best suited negotiate methodology, where price, past performance, and corporate relevant experience are of equal importance. To be considered, offerors must provide two to four past performance questionnaires for projects completed within the last five years, with at least two projects valued at no less than one million dollars. Contractors are required to provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or three million dollars. Personnel must undergo background checks and adhere to strict security and safety regulations, including DHS and FBI fingerprinting. All work must comply with prevailing wage determinations and sustainability principles, with final acceptance based on government inspections and adherence to the provided technical specifications and drawings.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes and epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Mechanical and electrical upgrades encompass new HVAC systems, rooftop air-handling units, exhaust extraction, compressed air systems, updated electrical distribution, lighting, and building automation controls. Site improvements include paving removal and replacement, drainage upgrades, and hazardous materials abatement. The project is divided into two primary pricing line items: building renovation and paving work. Award will be based on the lowest price, with specific evaluation considerations for Buy American statute compliance. Contractors must adhere to strict technical standards, including MIL-STD-101 for piping and ASME A13.1 for color coding. Bonding requirements are tiered by proposal value, with bid, payment, and performance bonds required for projects 150 thousand dollars and over. Invoicing must be processed through Wide Area Workflow. Key deliverables include a comprehensive submittal register of shop drawings and product data, as well as final operation and maintenance manuals and as-built drawings.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses all site preparations and improvements, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utilities. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for proposals for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors, including dormitories, offices, and conference rooms. The scope of work requires the contractor to restore these areas to their original condition through architectural repairs, including drywall replacement, painting, ceiling tile and flooring installation, and the replacement of vanities and cabinets. All work must comply with NFPA-101 life safety codes, ADA standards, EPA and OSHA regulations, and applicable Massachusetts state and local building codes. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit, provide a detailed cost breakdown, and submit proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, requiring specific minimum wage payments and paid sick leave for employees. Additionally, the contractor must provide a one-year guarantee on workmanship and a 20-year manufacturer warranty for LVP flooring. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 8 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to return sixteen residential rooms, bathrooms, and common areas to safe residential use. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, as well as the temporary removal and re-installation of HVAC equipment such as furnaces and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance and equipment clearances are maintained. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Proposers must provide detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing that remains firm for 60 days. Award requirements include a minimum one-year workmanship warranty and the provision of payment and performance bonds for the full project value within ten days of award. Additionally, contractors must maintain general liability insurance with minimum coverage of 1 million dollars per occurrence and 3 million dollars general aggregate.
Career Systems Development Corporation

POSTED

about 4 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

Project No. 210007 involves the second phase of renovation for Building 315 at the West Complex of the Stockton Port District in Stockton, California. The scope of work entails converting warehouse space into Port of Stockton Administration Offices, requiring the installation of walls, finishes, lighting, electrical outlets, data communications, plumbing, and HVAC systems. Because the project is located within an active office building, the contractor must implement strict noise and dust control measures. The contractor is also responsible for installing Port-furnished items, including specific carpeting, light fixtures, a wall-mounted TV, an assisted listening device, and kitchen appliances. Bids are due by 3:00 p.m. on October 13, 2026, and must be submitted in sealed envelopes to the Port Administration Building lobby. A mandatory pre-bid conference and site visit occurred on September 16, 2026; attendance was required for bidding eligibility. The contract will be awarded to the lowest responsible responsive bidder based on qualifications, price, and compliance. Eligible bidders must hold a valid California Class B contractor's license, and all personnel must obtain Transportation Worker Identification Credentials (TWIC) from the TSA. The project is governed by a comprehensive set of documents, including the Agreement, General and Supplemental Conditions, and specific insurance and indemnification requirements. Compliance with the ADA Standards for Accessible Design, the 2025 California Building Code, and California Labor Code Section 1776 regarding certified payroll is mandatory. Bidders must provide a bid security of at least 10% of the total bid price and execute a construction performance bond upon award. Payment and invoicing are handled through the Port of Stockton Accounts Payable Department, with electronic submission available via a secure portal.

General Info

Phase two renovation of Building 315 into Stockton Port administration offices.

Documents

3
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Port of Stockton
Contacts1 person available
OfficeCA, USA
Organization / AgencyCalifornia → Port of Stockton
Office AddressCA, USA

Full Description

Show more
Alteration of Building 315 to be used as Port of Stockton Administration Offices Port will receive sealed Bids no later than 3:00 p.m. on Tuesday, October 13, 2026. Port’s representative will call out the designated time in the Port Administration Building lobby, stating that the period for accepting Bids is closed. The Bid opening will be in accordance with procedures set forth in Document 00200 (Instructions to Bidders). MANDATORY PRE-BID CONFERENCE AND SITE VISIT. Port will conduct a Mandatory Pre-Bid Conference and Site Visit at 10:00 a.m. on Wednesday, September 16, 2026, initially meeting at the Port Administration Building, Project No. 210007 Advertisement for Bids Stockton Port District BUILDING 315 RENOVATION 00100 - 2 315 Fyffe Avenue, Stockton, California. Each Bidder must be represented at the meeting. To be eligible, each Bidder’s representative is required to sign an attendance sheet prior to 10:00 a.m. identifying the Bidder represented. Any Bidder arriving after that time will not be permitted to attend the meeting or Bid on the Work. Any Bidder wishing to investigate subsurface conditions at the Site must schedule such a visit with the Port in accordance with Document 00200 (Instructions to Bidders).

More opportunities from California → Port of Stockton

Same awarding agency

NAICS: 238210
New
SLED
Electrical System Operations & Maintenance Services
Solicitation # RFP-2026-0008
The Port of Stockton is seeking proposals for a three-year on-call contract, with two one-year extension options, to provide comprehensive electrical operations and maintenance services for the West Complex on Rough and Ready Island. The scope of work includes the operation, inspection, and repair of a 60 kV substation, power transformers, distribution and control powerhouses, overhead and underground circuits, utility poles, and street lighting. Additionally, the contractor is responsible for maintaining the Tantalus wireless power metering system. Key responsibilities include emergency response, preventive maintenance, and high-voltage electrical work, all performed under the guidance of a Port-designated Engineer of Record. The selected contractor must provide qualified personnel, including a Foreman or Troubleman physically on-site during normal working hours, and must furnish all necessary non-consumable tools. All personnel are required to maintain valid TWIC credentials and annual Port Police escort certification. Proposals are evaluated based on minimum qualifications and subjective judgments by a District Evaluation Committee, with strict disqualification criteria regarding bankruptcy, debarment, or conflicts of interest. The contract utilizes a work order authorization procedure for non-emergency tasks and requires daily reporting. Payment is processed within 30 days of receiving an acceptable invoice, and the contractor must adhere to CPUC General Orders 95 and 128 and other professional standards.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 333924
New
SLED
Forklift Equipment - EPA Grant Funded
Solicitation # RFP-2026-0007
The Port of Stockton is soliciting proposals for the procurement of 20 new battery-electric forklifts funded by an EPA grant. The requirement includes seven 10,000 lb. capacity units, seven 28,000 lb. capacity units, four 36,000 lb. capacity units, and two 66,000 lb. capacity units. All equipment must be new, commercially available production models that meet IP68 ingress protection standards and comply with Build America, Buy America (BABA) provisions. Technical specifications require high-voltage traction systems between 200V and 700V using LFP or NMC battery technology with a minimum capacity of 120 kWh and CCS1 DC fast charging. The contractor must also provide a two-year full-service maintenance and support package, technical training for Port personnel, and data reporting capabilities for energy consumption and operating hours. Warranty requirements include 18 months or 2,000 hours for the machine, 36 months or 6,000 hours for the powertrain, and 84 months for high-voltage batteries. Proposals must be submitted by December 8, 2026, consisting of four hard copies, a USB drive with PDF and Word files, and a separate sealed cost proposal. Financial security is strictly mandated, requiring a bid guarantee of 5% of the bid price and performance and payment bonds for 100% of the contract price, issued by sureties listed in US Treasury Circular 570. The contract is subject to various federal regulations, including the Davis-Bacon Act, 2 CFR Part 200, and non-discrimination laws.
Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing

POSTED

3 days ago

DEADLINE

in 30 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award