Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from General Services Administration was posted on June 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Building 50 Office Renovation Design-Build Project

Closed
47PJ0025R0049Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 21, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to six Good Faith Effort (GFE) requirements designed to secure project financing and expand upon State Water Resources Control Board standards. Bidders must provide proof of publicity, including online postings for 30 consecutive days and a one-day print newspaper advertisement, as well as evidence of utilizing the Small Business Administration and Minority Business Development Agency. These specific documents must be submitted with the bid package to avoid being deemed non-responsive. Additionally, documentation of DBE outreach may be submitted up to three business days after the bid closing date. Failure to comply with these GFE mandates will result in the disqualification of the proposal.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Additionally, Option 1 includes a separate 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. The scope of work encompasses comprehensive site improvements, including landscaping, parking, exterior lighting, telecommunications, and underground stormwater retention systems. Pricing is requested across a wide range of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business categories. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The contract pertains to a design-build project for renovating office and related spaces within Building 50 at the Denver Federal Center in Lakewood, Colorado, with an estimated value between $5 million and $10 million. The procurement process follows a two-phase selection method under FAR 36.3, where interested small business firms submit qualification proposals in Phase One. Up to three of the most qualified offerors will be invited to participate in Phase Two, submitting detailed proposals for the final award. The solicitation emphasizes the importance of compliance with the SBA set-aside requirements and provides detailed instructions for proposal submission, including deadlines and contact information. A pre-proposal conference was scheduled for May 7, 2025, and questions regarding Phase One proposals are due by May 14, 2025, with responses posted publicly. Amendments to the solicitation include updates to the Questions and Answers, extending proposal response deadlines, and providing access to pre-construction attendee lists through a shared Google folder. Additional project documentation can be accessed after completing a Controlled Unclassified Information (CUI) form and creating a GACA account. The project is governed by the latest PBS Interim Core Building Standards, which replace previous standards and outline compliance requirements for design and construction, especially for projects with less than 50% completion as of January 2025. The contract aims to enhance office facilities at the Federal Center, with the award contingent upon successful qualification and adherence to all specified standards and procedures.

General Info

Small business set-aside for Building 50 office renovation, $5-10M, two-phase competitive selection.

Contract Value

$20,000

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Lakewood, CO, 80225, USA

Set-Aside

SBA

Award Issued Date

Documents

11

47PJ0025R0049 Offeror Representations and Certifications

PDF, High priority: read this first18 pages · reps-and-certs
High

GSA Solicitation 47PJ0025R0049 - NPS Building 50 Office Renovation Project

PDF, High priority: read this firstrfp
High

NPS Building 50 Office Renovation Project Agreement

PDF, High priority: read this first46 pages · contract-document
High

NPS Building 50 Office Renovations - Contractor RFI Log (Amendment 0003)

XLSX, High priority: read this first56 pages · q-and-a
High

NPS DFC Building 50 Office Renovations Statement of Work

PDF, High priority: read this first85 pages · sow
High

Solicitation Amendment 47PJ0025R0049_0001

PDF, High priority: read this first2 pages · amendment
High

Solicitation Amendment 47PJ0025R0049_0002

PDF, High priority: read this first2 pages · amendment
High

Solicitation Amendment 47PJ0025R0049_0003

PDF, High priority: read this first2 pages · amendment
High

CUI Building Information Request Form

PDF, Low priorityspecial-notice
Low

GSA Affiliated Custom Accounts (GACA) Instructions

PPTX, Low priority10 pages · other
Low

GSA Affiliated Custom Accounts (GACA) Memo

PDF, Low priority1 page · memo
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from May 28, 2025 to Jun 9, 2025. The notice description changed.

Notice updated

Response deadline changed from Jun 9, 2025 to Jun 12, 2025. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R8 Acquisition Management Division
Contacts2 people available
OfficeLAKEWOOD, CO, 80225, USA

Full Description

Show more
AMENDMENT 0003 Amendment 0003 - The purpose of Amendment 0003 is to 1) provide minor update to Q01 and Q91 in the Questions and Answers based on RFI's submitted. AMENDMENT 0002 Amendment 0002 - The purpose of Amendment 0002 is to 1) provide the most recent Questions and Answers based on RFI's submitted through May 14, 2025. 2) Extend the proposal response date to June 12, 2025 by 10AM MST. 3) Provide offerors the list of pre-construction attendees in the shared Google folder for those with access via GACA account and have provided the CUI form. AMENDMENT 0001 Amendment 0001 is issued to: 1) Extend the proposal response date to June 9, 2025 by 2:00PM MST. The Project: This project is for the design and construction of office and office related space at the existing building 50 at the Denver Federal Center campus in Lakewood, Colorado. *To obtain additional project-related documentation please complete the attached CUI form and create a GACA account by following the provided instructions. Once both are complete, please email joseph.dorsey@gsa.gov and jamie.potter@gsa.gov your completed CUI form along with your GACA email address so we can grant you acess to the additional files* The Solicitation and Contract This procurement is being conducted using the two phase selection process found in FAR 36.3. Qualification proposals will be evaluated in Phase One to determine which offerors will submit proposals for Phase Two. One contract will be awarded using competitive negotiation. In Phase 1, GSA will select a short list of the most highly qualified offerors and request that those offerors submit Phase 2 proposals. All responsible sources may submit a Phase 1 proposal. A maximum of 3 firms will be selected to submit Phase 2 proposals. Only those selected offerors are authorized to submit Phase 2 proposals. Those offerors not selected for participation in Phase 2 will be notified in accordance with FAR 15.503(a). This Solicitation is set-aside for Small Businesses, in accordance with FAR 19. This Solicitation sets forth requirements for Phase 1 qualifications proposals and the evaluation factors for Phase 2 proposals for a Contract to construct the Project. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer. Pre-Proposal Conference Date: May 7, 2025 Time: 9:00 AM MT Location: Denver Federal Center Building 50 (West 6th Avenue and Kipling Street Lakewood, CO 80225) Estimated Price Range The estimated price range for the Project is between $5,000,000 and $10,000,000. Questions Regarding Phase 1 Submit all questions regarding the Phase 1 to joseph.dorsey@gsa.gov and jamie.potter@gsa.gov on or before May 14, 2025. Any responses provided by GSA will be posted on the Governmentwide Point of Entry (GPE) as an Amendment to the Solicitation. Receipt of Qualifications In order to be considered for Phase 2 and award, Phase 1 qualifications proposals conforming to the requirements of the Solicitation must be received 2:00 pm MT on the following date and at the following address. Date: May 28, 2025 Address: joseph.dorsey@gsa.gov, jamie.potter@gsa.gov

More opportunities from General Services Administration → Pbs R8 Acquisition Management Division

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS