Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Building Automation System (BAS) Integration and Maintenance

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Texas → El Paso ISDView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 27-009.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

(Job Order Contract) HVAC

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → El Paso ISD
ContactsNo contacts available
OfficeN/A
Organization / Agency
Texas → El Paso ISD
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Configuration, calibration, and maintenance of building automation systems for HVAC control, including integration of new units and sensor calibration.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. The project involves the design of a new municipal groundwater production well to replace and abandon the existing Corydon well. The scope is divided into two phases: Phase 1 covers technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 includes architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include using 24-inch diameter stainless steel Ful-Flo louvered well screens and ensuring the new pump matches existing vertical turbine equipment applications. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction. Award selection is based on demonstrated competence and professional qualifications rather than lowest cost, with evaluation weighted toward relevant experience (25%), project approach (25%), and scope/schedule (20%). Proposals must be submitted via the PlanetBids Vendor Portal by September 1, 2026. The contract is subject to strict federal and state regulations, including Build America Buy America (BABA) domestic-content requirements, the Iran Contracting Act, and various non-discrimination and environmental statutes. Payment is managed exclusively through the Department of Treasury Automated Standard Application for Payments (ASAP) system, with oversight provided by the Bureau of Reclamation.
Ardurra Group, Inc.

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project, managed by GEI Consultants, Inc. for the Elsinore Valley Municipal Water District, is a professional services engagement focused on the design and construction of a new municipal groundwater production well and the abandonment of the existing Corydon Well in California. The project is divided into two primary phases: Phase 1 covers technical specifications, civil site design, bidding assistance, and full-time on-site construction management for the drilling and abandonment process; Phase 2 involves architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for the equipping, testing, and commissioning of the new well. The total estimated project cost is 2,260,788 dollars, with a significant portion allocated to contractual and construction costs. The project is partially funded by the Department of the Interior Bureau of Reclamation WaterSMART Planning and Project Design Grant, requiring strict adherence to federal grant requirements, including 2 CFR Part 200 procurement standards, the Build America, Buy America Act, and specific reporting cycles. Qualified firms, particularly certified DBE and small businesses, are encouraged to apply. Requirements for the selected consultant include providing performance and payment bonds for 100 percent of the contract price, maintaining comprehensive general and automobile liability insurance, and complying with California prevailing wage laws and Cal/OSHA standards. Proposals must be submitted via the PlanetBids Vendor Portal, and the award will be based on the most advantageous proposal, considering qualifications and price.
GEI Consultants, Inc.

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Texas → El Paso ISD

Same awarding agency

NAICS: 238210
New
SLED
(Job Order Contract) Interior Building Improvements
Solicitation # 27-012
El Paso ISD is soliciting proposals for a Construction Solutions Provider Job Order Contract to perform districtwide interior building improvements, specifically focusing on LED lighting, public announcement and sound systems, and energy management and building automation services. This Indefinite Delivery/Indefinite Quantity procurement seeks qualified single-trade vendors to execute minor to moderate repairs, renovations, additions, and replacements. The contract has a maximum aggregate ceiling of 3,400,000 dollars, with any single job order exceeding 500,000 dollars requiring direct approval from the District Board of Trustees. The agreement is intended for a maximum five-year term, consisting of a two-year base term with up to three optional annual renewals. Pricing is based on unit rates from the RS Means unit price book multiplied by a contractor-proposed coefficient that covers all overhead, insurance, and contingencies. Proposals will be evaluated on a 100-point scale, with a minimum passing score of 70 points required for award consideration. Key weighted factors include purchase price, quality, ability to meet district needs, long-term costs, reputation, and past relationship with the district. Vendors must adhere to strict compliance requirements, including EDGAR certifications, Texas Government Code mandates regarding firearm entities and energy company boycotts, and a prohibition on diversity, equity, and inclusion duties. Submissions are due by September 2, 2026, via the Ionwave platform or sealed hard copy.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 19 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237990
New
SLED
(Job Order Contract) Site Improvements
Solicitation # 27-011
El Paso ISD is soliciting proposals for a Job Order Contract (JOC) to provide district-wide site improvements, including the repair, maintenance, and replacement of playgrounds, athletic sites, marquees, site drainage, and pavement parking lots. This Indefinite Delivery / Indefinite Quantity (IDIQ) procurement has an estimated contract value between 3,000,000 and 3,750,000 dollars. The agreement features a two-year base term with the district's option to extend for three additional years. Pricing is determined on a per-task order basis using RS Means unit price books multiplied by an awarded coefficient that covers all overhead, insurance, and contingencies. Proposals are due by September 2, 2026, and must be submitted via the Ionwave platform or as hard copies. Evaluation is based on a weighted system focusing on purchase price, quality, meeting district needs, long-term costs, reputation, and past district relationships, with a minimum passing score of 70 points required for award. Vendors must comply with extensive Texas state certifications, including prohibitions against boycotting Israel or energy companies, restrictions on foreign-owned companies from specific nations, and warrants against engaging in diversity, equity, and inclusion duties. Required documentation includes a proposed methodology, experience records, financial stability evidence, and a comprehensive safety manual.
Other Heavy and Civil Engineering Construction

POSTED

about 19 hours ago

DEADLINE

in 21 days
View Details