Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on August 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Buillding Demolition – Salvage, NL

Closed
30006999Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Government of Canada → Department of Fisheries and OceansView Agency

NAICS

N/A

Place of Performance

*Newfoundland and Labrador, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Department of Fisheries and Oceans
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Department of Fisheries and Oceans
View Agency Profile
Office AddressN/A
Contacts
Joshua BerezaPoint of Contact

Full Description

Show more
The scope of work for this project is the provision of construction activities for the complete building demolition at (Latitude 48.6872, Longitude -53.6432), Salvage, NL, as is more specifically described below and in the Drawings and Specifications*. In general, the work consists of, but will not necessarily be limited to, the following: .1 Complete demolition, removal and disposal of the existing ice plant building and other miscellaneous items, as shown on the drawings. The building is a two-story structure consisting of both timber and masonry block framing, concrete floor slab and concrete foundation as shown on the drawings. Depending on the Contractor’s demolition/removal methodology, hazardous materials may have to be removed and disposed of prior to demolition of the entire building structure. Refer to the Hazardous Building Materials Assessment Report in Appendix A. .2 Clean-up of the existing work area prior to any new site work, as indicated on the drawings. .3 Extension of existing waterline, as shown on the drawings. .4 Coordination with Utility for all electrical disconnects and reconnects, as indicated on the drawings. Existing electrical shed re-work, as indicated on the Electrical Drawing, and reinstatement of the temporary pole location(s). .5 Excavation, including removal of existing topsoil, sodding, and bushes, to reshape existing uplands and to facilitate new granulars, as shown on the drawings. .6 Supply and installation of new rock fill (if required), granulars, and stone barricades, to reinstate the site, as shown on the drawings. Contractor to scarify, re-shape, and compact existing sub-grade prior to placement of new granulars. The Contractor must complete the Work within 12 weeks of Contract Award. *Note: Drawings and Specifications will be provided to bidders who are invited to the second (2nd) phase of evaluations