This Solicitation opportunity from California was posted on July 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Bus Operations East (Boe) Parking Lot Improvements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to comprehensive improvements at the BREEZE Operations East Facility parking lot in Escondido, California, encompassing asphalt and concrete paving, grinding and overlay, patching, crack sealing, docking pit backfill and repaving, new striping, relocation of electrical and compressed air utility lines, tree pruning, installation of a chain-link fence with a swing gate, safety bollards, and new LED lighting. All work must be executed in phases to ensure uninterrupted bus maintenance operations, utilizing corrosion-resistant, outdoor-rated materials such as Type V Portland cement, Schedule 80 conduits, and galvanized or stainless steel components. Compliance with the California Building Code, California Electrical Code, ASTM, ANSI, RCRA, and the Greenbook Standard Specifications for Public Works Construction is mandatory, with specific adherence to Greenbook sections 306-1.3 and 400-4 for backfill densification and asphalt concrete. The project is governed by Improvement Plans, Photos of Existing Site Conditions, and the 2022 RSD San Diego Standard Plans, which serve as critical reference documents. Award will be made on a Lowest Price Technically Acceptable basis, with selection based solely on the lowest bid from a responsible bidder who meets all technical, financial, and regulatory criteria. Bidders must demonstrate adequate financial resources, licensing, surety ratings, absence of debarment, and a clean litigation and performance record. Mandatory certifications include Buy America compliance, False Claims Act certification, Federal Tax Liability and Felony Conviction disclosure, DBE/SB status verification, and restrictions on telecommunications equipment under NDAA Section 889. Insurance requirements are strict, with subcontractors obligated to carry equivalent coverage, and waivers for workers’ compensation or auto liability permitted only under narrow conditions and with prior approval. Self-insured retentions require NCTD approval and potential financial guarantees, while claims-made insurance must cover the contract term and post-performance exposure. Proposals must be submitted electronically via PlanetBids by the August 13, 2026 deadline, with all required forms fully executed. Payment is processed by NCTD’s Accounts Payable in Oceanside via PDF invoice, referencing the Agreement and Purchase Order numbers, with formal acceptance occurring only after successful punchlist resolution and submission of all closeout documentation at the project site.
General Info
Agency
NAICS
Place of Performance
Escondido, CA, 92025, USASet-Aside
Timeline
Submission Closed
