Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from SAK Construction, LLC was posted on August 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bypass Pumping for Sanitary Sewer Lines

Closed
Submission Closed

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221112
SLED
Northtown Backup Generating Facility
Solicitation # 25-SPPE-02
The Northtown Backup Generating Facility is a 97.3 megawatt diesel-fired emergency power system designed to provide uninterrupted backup power exclusively to the Northtown Data Center in San José, California, without any connection to the transmission or distribution grid. Located on a 28.5-acre site at the southwest corner of West Trimble Road and Orchard Parkway on APNs 101-02-018 and 101-02-021, the facility will consist of 42 diesel generators—40 rated at 3 megawatts each and two smaller units at 1.75 megawatts—arranged in two generation yards adjacent to the data center buildings. Of the 3-megawatt units, eight are designated as redundant to ensure reliability. The two smaller generators will support office loads, building systems, and life safety services. The facility will include a new 115-kilovolt to 34.5-kilovolt, 110-megavolt-ampere electrical substation with a two-bay, two-transformer design, allowing one transformer to be taken offline without loss of service, effectively providing 105 megavolt-amperes of redundancy. On-site diesel fuel storage capacity is 234,000 gallons, and the generators will operate using renewable diesel fuel to minimize emissions and comply with sustainability mandates. The project is subject to comprehensive environmental review under the California Environmental Quality Act and requires permits from the Bay Area Air Quality Management District, the City of San José, the California Department of Fish and Wildlife, and the Federal Aviation Administration for structure height compliance. It must also participate in San José Clean Energy’s Total Green program to ensure 100 percent carbon-free electricity use. The California Energy Commission is the lead agency overseeing the project and has determined it qualifies for an exemption under Public Resources Code §25541. All generators must meet Tier 4 emissions standards with controls for nitrogen oxides and diesel particulate matter. Environmental mitigation measures include noise reduction, wildfire risk management, and protection of biological and cultural resources, with preconstruction surveys mandated. The project is currently in the environmental review phase, with a public comment period scheduled from July 21 to August 20, 2026. No procurement or contract pricing details are available, and while the project is not governed by federal acquisition regulations, compliance with state and local environmental, zoning, and safety codes
Energy Commission

POSTED

4 months ago

DEADLINE

N/A

AI Contract Overview

Show more

SAK Construction, LLC is seeking a subcontractor for the installation and operation of temporary pumping systems designed to divert wastewater flow around active work zones. This critical infrastructure support is required during sanitary sewer line rehabilitation to prevent overflows and ensure the continuous maintenance of service. The opportunity is specifically set aside for certified Women-Owned Small Businesses, as well as those with DBE, MBE, or WBE certifications. Interested parties must submit their responses by September 1, 2026, under NAICS code 221112.

General Info

SAK Construction seeks certified WOSB/DBE subcontractors for temporary wastewater pumping by September 1, 2026.

Place of Performance

NC, USA

Set-Aside

WOSB

Documents

This scope was carved out of CS370924-02.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Laurinburg, NC

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • IGF::OT::IGF AEP Electric Power AgreementOpen now
  • SPE60427R0400 - MISO 2027Open now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencySAK Construction, LLC
ContactsNo contacts available
OfficeN/A
Organization / AgencySAK Construction, LLC
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation and operation of temporary pumping systems to divert wastewater flow around work zones during rehabilitation to prevent overflow and maintain service.

More opportunities from SAK Construction, LLC

Same awarding agency

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS