This Pre-Solicitation opportunity was posted on February 3, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--630A4-10-414 REPLACE WATER TUBE BOILER A/E DESIGN

Closed
VA24217R0194Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 8 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
International
CoT RFP Event Q30-01-2026-27
Solicitation # Q30-01-2026-27
The City of Tshwane is soliciting a service provider for professional engineering services to support town planning subdivision application processes on city-owned properties. The scope of work is divided into three primary categories: Civil Services Reports, Geotechnical Investigations, and Route Determination Reports. All services must be led by a Professional Engineer registered with the Engineering Council of South Africa and must comply with the Gauteng Transport Infrastructure Act, National Building Regulations SANS 10400, and various SANS and SANRAL standards. The project follows a strict timeline, requiring an inception meeting within one month, draft reports within three months, final reports within five months, and project close-out within six months of appointment. The solicitation, numbered Q30-01-2026-27, closes on November 12, 2026, at 10:00. Awards are based on an 80/20 preferential point system in accordance with the Preferential Procurement Policy Framework Act and 2022 Regulations, with specific goals including points for women-owned, youth-owned, and disability-owned enterprises, as well as local economic participation. Evaluation occurs in four stages, starting with administrative responsiveness and a functionality score of at least 70 out of 100. Successful bidders must enter into a Service Level Agreement, with payment terms set at 30 days following the receipt of an invoice. Required submission documents include company registration, tax clearance or a CSD unique pin, and B-BBEE certification.
City of Tshwane

POSTED

about 11 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The Architect/Engineer is tasked with providing comprehensive design and construction documents to replace water tube boiler number three in Building 4. The scope includes conducting a thorough operational study, performing a life cycle cost analysis, and evaluating various boiler options to determine the most cost-effective and efficient replacement. Beyond the boiler itself, the project requires replacing the deaerator tank, condensate surge tank, condensate surge pumps, and building steam condensate pumps, as well as upgrading the building management system software and replacing fresh air fan coils and chart recorders for all four boilers. The A/E must also manage asbestos surveys and air monitoring through a certified industrial hygienist and coordinate natural gas service requirements with the local provider. The A/E is responsible for delivering design drawings at 30, 60, 90, and 100 percent completion, ensuring all work complies with VA standards, ASHRAE 90.1, and NFPA codes. Additional requirements include developing construction phasing, infection control, and life safety plans, as well as preparing air emissions permit applications for the New York State Department of Environmental Conservation. The A/E must also coordinate utility interconnections and identify available NYSERDA and local utility rebates. Construction period services, including submittal reviews, RFI responses, and the preparation of as-built drawings, are required to ensure the successful completion of the project.

General Info

AE to design and document boiler and system replacements for Building 4.

Agency

N/A

NAICS

541330 - Engineering Services

Place of Performance

UNITED STATES DEPARTMENT OF VETERANS AFFAIRS;NEW YORK HARBOR HEALTHCARE SYSTEM - BROOKLYN;800 POLY PLACE;ENGINEERING SERVICE (1

Set-Aside

SDVOSBC

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Scope of Work: The A/E shall provide construction documents and specifications to replace the existing water tube boiler #3 located in the Boiler Plant in Building #4. The project design includes any temporary boiler that may be required during construction. The A/E shall perform a thorough study of the existing Boiler Plant operations in order to determine the best type, size, and capacity of a new boiler to be installed. The A/E shall review the different boiler options available and provide a narrative of the positives and negatives for each boiler. The A/E shall provide a life cycle cost analysis to determine the most cost effective boiler for the facility. The design includes modifying the existing piping, valves, regulator, pumps, stack, mechanical & electrical connections, concrete pads, controls panel and building management system as required for the installation of the new boiler. The project design includes installing new electrical, mechanical, structural, and associated piping, valves, regulator, economizer, stack, controls and insulation for the new boiler. The A/E shall work with the medical center natural gas provider to determine the requirements of the new natural gas service for the new boiler. The project design includes connecting the new boiler to the existing Building Management head end control system in the boiler plant. The project design shall include upgrading the existing BMS controls system to the latest software version. The project design includes replacing the existing deaerator tank and associated piping, valves and controls, condensate surge tank and associated piping, valves and controls, condensate surge pumps and the building #4 steam condensate pumps. The new pumps shall be equipped with variable speed drives. The project design includes any temporary tanks that would be required during construction. The project design includes replacing the coils on the fresh air fan serving the boiler plant. The project design includes replacing the chart recorders for Boilers #1, 2, 3 and 4. The Architect/Engineer shall retain the services of a certified industrial hygienist to survey the existing boiler plant to determine the quantities of asbestos-containing material required to be removed. The A/E shall be responsible for developing construction documents and specifications detailing the asbestos abatement required for the project. The architect/engineer shall provide all necessary labor and material to conduct asbestos air monitoring during the asbestos abatement phase of the project. The architect/engineer shall provide a certified industrial hygienist to perform asbestos air monitoring during the asbestos abatement phase of the project. All work shall conform to VA criteria and regulation. The project design shall comply with VA HVAC Design Standards & Criteria, VA Steam Heating, Hot Water and Outside Distribution Design Manual, VA Sustainability Design Guide, ASHRAE 90.1 and all applicable NFPA codes. The A/E shall provide all A/E services necessary for preparation of complete construction documents and construction period services. Work includes verification of existing As-Built drawings, preparation of contract drawings & specifications, and detailed cost estimate. The A/E shall provide complete contract drawings & specifications including demolition, architectural, plumbing, fire protection, structural and mechanical & electrical drawings for construction. The A/E shall provide construction period services to include submittal review; shall also provide a response to RFI, site/visits/inspections and prepare As-Built drawings from contractor markup. The Architect/Engineer shall provide calculations comparing the energy consumption of the existing water tube boiler to the new proposed boiler and determine the energy and cost savings for the medical center of the new boiler compared to the existing water tube boiler. All energy saving calculations and Life Cycle Cost Analysis shall be included as part of the design package for all phases. The A/E shall be responsible for development of the construction phasing plan, infection control risk assessment plan, and the interim life safety measures plan. The A/E shall be required to provide 30%, 60%, 90% and 100% design drawings and specifications for review. The A/E shall follow the submission instructions outlined in VA Program Guide PG 18-15 Volume C. The Architect/Engineer is responsible for completing the VA Privacy and Information Security Awareness training. All local utility coordination and compliance for interconnection agreement(s) and utility incentives shall be included in the design. This shall include any preparation, coordination, and application for any interconnection fees and any rebates from New York State and/or the natural gas utility provider. Also, identify the costs of these interconnection fees if applicable and possible, and verify any impact studies required by the utility, as well as the costs of these studies. The A/E shall consider and incorporate local utility and NYSERDA incentive and rebate program options into the design process. Where applicable, the A/E will directly coordinate the incentive and rebate activities, schedule, and requirements with the Local Utility Incentive Program Coordinator. The project design shall include all stationary source permitting, testing and demonstration requirements necessary for construction and operation as required by the New York State Department Environmental Conservation Prepare the following air emissions permit applications for review and submittal by VA: NY State Department of Environmental Conservation Air State Facility Permit Modification. - Provide all technical data required to complete the applications in order that VA can secure the requisite permits. The A/E shall review the provisions of the medical center s existing New York State Department of Environmental Conservation (DEC) Air State Facility Permit. The A/E shall prepare a fully completed Air State Facility permit modification application for the new boiler using the format stipulated by DEC. The A/E shall furnish all required technical information. A copy of a previous permit modification application can be provided for reference. The A/E will provide the completed application form for the permit modification to the VA COR. - The VA will review the application for completeness and accuracy. The A/E will modify the application as directed by VA. Following acceptance of the application by VA, VA will submit the application to DEC and will undertake all necessary further follow-up actions needed to obtain the permit. The A/E shall provide a share point or FTP site that the VA does not have restricted access to for drawing transfer, submittal submission and review during the project.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS