This Government Contract opportunity from Department Of Veterans Affairs was posted on June 29, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C--A&E ARC Flash Study Project #693-11-126

Awarded
VA24411IB0214Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 8 hours ago

DEADLINE

in 22 days
NAICS: 541330
New
International
CoT RFP Event Q30-01-2026-27
Solicitation # Q30-01-2026-27
The City of Tshwane is soliciting a service provider for professional engineering services to support town planning subdivision application processes on city-owned properties. The scope of work is divided into three primary categories: Civil Services Reports, Geotechnical Investigations, and Route Determination Reports. All services must be led by a Professional Engineer registered with the Engineering Council of South Africa and must comply with the Gauteng Transport Infrastructure Act, National Building Regulations SANS 10400, and various SANS and SANRAL standards. The project follows a strict timeline, requiring an inception meeting within one month, draft reports within three months, final reports within five months, and project close-out within six months of appointment. The solicitation, numbered Q30-01-2026-27, closes on November 12, 2026, at 10:00. Awards are based on an 80/20 preferential point system in accordance with the Preferential Procurement Policy Framework Act and 2022 Regulations, with specific goals including points for women-owned, youth-owned, and disability-owned enterprises, as well as local economic participation. Evaluation occurs in four stages, starting with administrative responsiveness and a functionality score of at least 70 out of 100. Successful bidders must enter into a Service Level Agreement, with payment terms set at 30 days following the receipt of an invoice. Required submission documents include company registration, tax clearance or a CSD unique pin, and B-BBEE certification.
City of Tshwane

POSTED

about 10 hours ago

DEADLINE

in 13 days

General Info

Contract Value

$278,043

NAICS

541330 - Engineering Services

Place of Performance

PA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)
ContactsNo contacts available
OfficePITTSBURGH, PA, 15215, USA
Office AddressPITTSBURGH, PA, 15215, USA
ContactsNo contact information available

Full Description

Show more
THIS IS A 100% SET ASIDE FOR SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) CONCERNS. Firms responding to this announcement must be registered and verified as a SDVOSB at http://vip.vetbiz.gov in accordance with VAAR 804.1102. The NAICS Code for this acquisition is 541330 and the applicable small business size standard is not more than $4.5 million dollars average annual revenues for the past three years. The area of consideration is RESTRICTED to a 200 mile radius of the VA Wilkes-Barre Medical Center, 1111 East End Blvd, Wilkes-Barre, PA 18711 in which the A/E firm's office must be located. The estimated construction range is between $250,000 and $500,000. Firms that meet the requirements listed in this announcement are invited to submit three (3) copies of Standard Form (SF) 330 with appropriate documentation to the Contracting Officer, Attention: Everett Shaver, Contracting (049E), Wilkes-Barre Medical Center, 1111 East End Blvd, Wilkes-Barre, PA 18711, no later than June 3, 2011, 4:00 P.M., EDST. Forms are available on the internet at: http://www.gsa.gov/portal/forms/type/TOP. FAX AND/OR E-MAIL SUBMISSIONS WILL NOT BE ACCEPTED. Responders are solely responsible for all expenses associated with responding to this Combined Synopsis/Solicitation. THIS IS NOT A REQUEST FOR PROPOSAL. THERE ARE NO SOLICITATION DOCUMENTS AVAILABLE. This requirement is subject to Availability of Funds. The completed SF330 will be evaluated by the VA Medical Center Architect-Engineer Evaluation Board in accordance with Federal Acquisition Regulation (FAR) 36.602-1. Interviews shall be held with at least the top three firms selected based on submittal of SF330's. The board shall provide a listing, in order of preference, to Contracting Office for negotiations. In accordance with FAR 36.606, negotiations shall be conducted beginning with the most preferred firm in the final selection. Interested parties shall ensure current Licensing, and have current registration in the Central Contractor Registration (CCR) database at http://ccr.gov and VetBiz Information pages (VIP) at http://vip.vetbiz.gov, as well as have submitted the current VETS-100 report at http://www.dol.gov/vets/program/fcp/main.htm. In addition, current Representation and Certifications must be filed via the Online Representation and Certifications Application (ORCA) at https://orca.bpn.gov. The VA Wilkes-Barre Medical Center, is seeking Architect-Engineering (AE) design services to provide the following: 1.01 SCOPE 1) The contractor shall furnish short-circuit and protective device coordination studies as prepared by a Registered Professional Engineer. 2) The contractor shall furnish an Arc Flash Hazard Analysis Study per the requirements set forth in NFPA-70E- Standard for Electrical Safety in the workplace. The arc flash hazard analysis shall be performed in accordance to the IEEE 1584 equations that are presented in NFPA- 70E-2009, Annex D. 3) The scope of the studies shall include all existing electrical distribution in the Veterans Administration Medical Center, 1111East End Blvd, Wilkes-Barre PA. 1.02 REFERENCES 1) Institute of Electrical and Electronic Engineers, Inc (IEEE): a) IEEE 141- Recommended Practice for Electrical Power Distribution and Coordination of Industrial and Commercial Power Systems. b) IEEE 242- Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems. c) IEEE 399- Recommended Practice for Industrial and Commercial Power System Analysis. d) IEEE 241- Recommended Practice for Electrical Power Systems in Commercial Buildings. e) IEEE 1015- Recommended Practice for Applying Low-Voltage Circuit Breakers Used in Industrial and Commercial Power Systems. f) IEEE 1584- Guide for Performing Arc-Flash Hazard Calculations. 2) American National Standards Institute (ANSI): a) ANSI C57.12.00- Standard General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers. b) ANSI C37.13-Standard for Low Voltage AC Power Circuit Breakers Used in Enclosures. c) ANSI C37.010- Standard Application Guide for AC High Voltage Circuit Breakers Rated on a Symmetrical Current Basis. d) ANSI C37.41- Standard Design Tests for High Voltage Fuses Distribution Enclosed Single-Pole Air Switches, Fused Disconnecting Switches, and Accessories. 3) The National Fire Protection Association (NFPA): a) NFPA 70- National Electric Code, Latest Edition. b) NFPA 70E- Standard for Electrical Safety in the Workplace. 1.03 SUBMITTALS FOR REVIEW/APPROVAL 1) The completed short-circuit, protective device coordination arc flash hazard analysis studies shall include the following sections: a) Executive Summary. b) Descriptions, purpose, basis, and scope of the studies. c) Tabulation of circuit breaker, fuse, and other protective device ratings versus calculated short-circuit duties. d) Protective device time versus current coordination curves, tabulations of relay and circuit breaker trip unit settings, and fuse selection e) Fault current calculations including a definition of terms and guide for interpretation of the computer printout. f) Details of the incident energy and flash protection boundary calculations. g) Recommendations for system improvements, where needed. h) One-line diagram in PDF format. 1.04 QUALIFICATIONS 1) The short-circuit, protective device coordination, and arc flash hazard analysis studies shall be conducted under the supervision and approval of a Registered Professional Electrical Engineer skilled in performing and interpreting the power system studies. 2) The Registered Professional Electrical Engineer shall be a full-time employee of an approved engineering firm. 3) The Registered Professional Electrical Engineer shall have a minimum of five (5) years experience in performing power systems studies. 1.05 COMPUTER ANALYSIS SOFTWARE 1) The studies shall be performed using software programs specially designed to standards governing short-circuit, coordination, and arc flash hazard calculations. PART 2 PRODUCT 2.01 STUDIES 1) The contractor will furnish short-circuit and protective device coordination studies as prepared by an approved engineering firm. 2) The contractor shall furnish an Arc Flash Hazard Analysis Study per NFPA-70E-Standard for Electrical Safety in the Workplace, reference Article 130.3 and Annex D. 2.02 DATA COLLECTION 1) The contractor shall collect necessary data as required by the power system studies. The engineer performing the studies shall furnish the contractor with a listing of required data immediately after award of the contract. The contractor will coordinate with VAMC Engineering to obtain any drawings for review and up-dating. 2) Source combination may include present and future motors and generators. 3) If applicable, include fault contribution of existing 25 HP or larger motors in the study. The contractor shall obtain required existing equipment data, if necessary, to satisfy the study requirements. 2.03 SHORT-CIRCUIT AND PROTECTIVE DEVICE EVALUATION STUDY 1) Typical conductor impedances shall be based on IEEE Standard 141-1993. 2) Transformer design impedances shall be used when test impedances are not available. 3) Provide the following: a) Calculation methods and assumptions. b) Selected base per unit quantities. c) One-line diagram of the system being evaluated. d) Source impedance data, including electric utility system and motor fault contribution. e) Tabulations of calculated quantities. f) Results, conclusions, and recommendations. 4) Calculate short-circuit momentary and interrupting duties for a three-phase bolted fault at each: a) Electric utility supply termination point. b) Incoming switchgear. c) Unit substation primary and secondary terminals. d) Low voltage switchgear. e) Motor control centers. f) Standby generators and automatic transfer switches. g) Branch panel boards. h) Other significant locations throughout the system. 5) Protective Device Evaluation: a) Evaluate equipment and protective devices and compare to short-circuit ratings. b) Adequacy of switchgear, motor control center, and panel board bus bars to withstand short-circuit stresses c) Advise VAMC Engineering, in writing, of existing circuit protective devices improperly rated for the calculated available fault currents. 2.04 PROTECTIVE DEVICE COORDINATION STUDY 1) Proposed protective device coordination time-current (TCC) shall be displayed on log-log scale graphs. 2) Include on each TCC graph, a complete title and one-line diagram with legend identifying the specific portion of the system covered. 3) Terminate device characteristic curves at a point reflecting maximum symmetrical or asymmetrical fault current to which the device is exposed. 4) Identify the device associated with each curve by manufacturer type, function, and, if applicable, tap, time delay, and instantaneous settings recommendations. 5) Plot the following characteristics on the TCC curve, where applicable: a) Electric utility overcurrent protective device. b) Medium voltage equipment overcurrent relays. c) Medium and low voltage fuses including manufacturer's minimum melt, total clearing, tolerance, and damage bands. d) Low voltage equipment circuit breaker trip devices, including manufacturer's tolerance bands. e) Transformer full-load current, magnetizing inrush current, and ANSI through-fault protection curves. f) Ground fault protective devices, as applicable. g) Pertinent motor starting characteristics, where applicable. h) The largest feeder circuit breaker in each motor control center and applicable panel board. 2.06 ARC FLASH HAZARD ANALYSIS 1) The arc flash hazard analysis shall be performed according to the IEEE 1584 equations that are presented in NFPA-70E, Annex D. 2) The flash protection boundary and the incident energy shall be calculated at all significant locations in the electrical distribution (switchboards, switchgear, motor control centers, panel boards, busways, and splitters) where work could be performed on energized parts. 3) The Arc Flash Hazard Analysis shall include all significant locations in 208 volt systems fed from transformers equal to or greater than 125 KVA where the work could be performed on energized parts. 4) Safe working distances shall be based upon the calculated arc flash boundary considering an incident energy of 1.2 cal/cm2. 5) When appropriate, the short-circuit calculations and the clearing times of the phase overcurrent devices will be retrieved from the short-circuit and coordination study model. Ground over-current relays should not be taken into consideration when determining the clearing times when performing incident energy calculations. 6) The short-circuit calculations and the corresponding incident energy calculations for multiple system scenarios must be compared and the greatest incident energy must be uniquely reported for each equipment location. Calculations must be performed to represent the maximum and minimum contributions of fault current magnitude for normal and emergency operating conditions. The minimum calculation will assume that the utility contribution is at a minimum and will assume a minimum motor contribution (all motors off). Conversely, the maximum calculation will assume a maximum contribution from the utility and will assume the maximum amount of motors to be operating. Calculations shall take into consideration the parallel operation of synchronous generators with the electric utility for extended periods, where applicable. 7) For each equipment location with a separately enclosed main device (where there is adequate separation between the line side terminals of the main protective device and the work location), calculations for incident energy and flash protection boundary shall include both the line and load side of the main breaker. 2.06 REPORT SECTION 1) Input data shall include, but not be limited to the following: a) Feeder input data including feeder type (cable or bus), size, length, number per phase, conduit type (magnetic or non-magnetic) and conductor material (copper or aluminum). b) Transformer input data, including wiring connections, secondary neutral-ground connection, primary and secondary voltage ratings, KVA rating, and impedance. c) Generation contribution data (synchronous generators and utility), including short-circuit reactance (X"d), MVA, rated voltage, three-phase and single-phase line to ground contribution (for utility sources) and X/R ratios. d) Motor contribution data (induction motors and synchronous motors), rated horsepower or KVA, and rated voltage. 2) Short-Circuit Output Data shall include, but not be limited to the following reports: a) Low voltage fault report shall include a section for three-phase fault calculations and shall show the following information: i) Voltage. ii) Calculated fault current magnitude and angle. iii) Fault point X/R ratio. b) Momentary Duty Report shall include a section for three-phase fault calculations and shall show the following information: i) Voltage. ii) Calculated symmetrical fault current magnitude and angle. iii) Fault point X/R ratio. iv) Calculated asymmetrical fault currents. c) Interrupting Duty Report shall include a section for three- phase fault calculations and shall show the following data: i) Voltage. ii) Calculated symmetrical fault current magnitude and angle. iii) Fault point X/R ratio. iv) No AC Decrement (NACD) ratio. v) Equivalent impedances. vi) Multiplying factors for 2, 3, 5, and 8 cycle circuit breakers. 3) Recommended Protective Device Settings: a) Phase and ground relays: i) Current transformer ratio. ii) Current setting. iii) Time setting. iv) Instantaneous setting. v) Recommendations on improved relaying systems, if applicable. b) Circuit Breakers: i) Adjustable pickups and time delays (long time, short time, ground). ii) Adjustable time current characteristic. iii) Adjustable instantaneous pickup. iv) Recommendations on improved trip systems, if applicable. 4) Incident Energy and Flash Protection Boundary Calculations a) Arcing fault magnitude. b) Protective device clearing time. c) Duration of arc. d) Arc flash boundary. e) Working distance. f) Incident energy. g) Hazard risk category. PART 3 EXECUTION 3.01 FIELD ADJUSTMENT 1) Adjust relay and protective device settings according to the recommended settings table provided by the coordination study. 3.02 ARC FLASH WARNING LABELS 1) The contractor of the Arc Flash Hazard Analysis shall provide labels for each work location analyzed. The label shall include the following information, at a minimum: a) Location designation. b) Nominal voltage. c) Flash hazard boundary. d) Hazard risk category. e) Incident energy. f) Working distance. 2) Labels shall be machine printed, with no field markings. 3) Arc flash labels shall be provided in the following manner and all labels shall be based on recommended overcurrent device settings. a) For each 480 and applicable 208 volt panel board, one arc flash label shall be provided. b) For each motor control center, one arc flash label shall be provided. c) For each low voltage switchboard, one arc flash label shall be provided. d) For each switchgear, one arc flash label shall be provided. e) For each medium voltage switch, one arc flash label shall be provided. 3.02 ARC FLASH TRAINING 1) The contractor of the Arc Flash Hazard Analysis will provide training for VAMC Engineering personnel on the potential arc flash hazards associated with working on energized equipment (minimum of 4 hours). The training will be based on NFPA provided material using NFPA trained instructors. Each person attending the classes will receive a certificate of attendance. --------------------------------------------------------------------------------------------------------------------- VAAR Clause 804.1102 regarding verification of SDVOSB status is provided below for reference. 804.1102 Vendor Information Pages (VIP) Database. Prior to January 1, 2012, all VOSBs and SDVOSBs must be listed in the VIP database, available at http://www.VetBiz.gov, and also must be registered in the Central Contractor Registration (CCR) (see 48 CFR subpart 4.11) to receive contract awards under VA's Veteran-owned Small Business prime contracting and subcontracting opportunities program. After December 31, 2011, all VOSBs, including SDVOSBs, must be listed as verified in the VIP database, and also must be registered in the CCR to be eligible to participate in order to receive new contract awards under this program.

More opportunities from Department Of Veterans Affairs → 244-NETWORK Contract Office 4 (36C244)

Same awarding agency

NAICS: 325412
New
Federal
6505--INTENT TO SOLE SOURCE Radiopharm - Lutathera & Pluvicto - Lebanon VAMC
Solicitation # 36C24427Q0045
The Department of Veterans Affairs, Network Contracting Office 4, intends to establish a firm-fixed-price contract for the procurement and delivery of name-brand Lutathera and Pluvicto radiopharmaceuticals for the Lebanon VA Medical Center. The scope of work includes the distribution, transportation, and inventory management of 8 doses of Lutathera and 48 doses of Pluvicto, both at 200mCi intravenous injection. The proposed period of performance is from January 1, 2027, to December 31, 2027. The government intends to sole source this requirement to Novartis Pharmaceuticals Corporation under the Revolutionary FAR Overhaul (RFO) for FAR 8.4 and GSAM/R 538.71, in accordance with Executive Order 14275. The contractor must be licensed by the Nuclear Regulatory Commission and comply with FDA, OSHA, and DOT regulations, including the use of lead-shielded containers and specific labeling requirements such as bar-coding for dose tracking. Deliveries must be made F.O.B. Destination to the Lebanon VA Medical Center, with routine shipments arriving at least one hour before calibration time. Preference will be given to contractors utilizing non-High Enriched Uranium sources. This notice is for planning purposes, and interested vendors must submit a one-page capability statement, including their SAM UEI number and socioeconomic category, to the Contracting Specialist by November 3, 2026, at 14:00 PM EST. The procurement falls under NAICS code 325412 with an SBA size standard of 1,300 employees.
Pharmaceutical Preparation Manufacturing

POSTED

about 17 hours ago

DEADLINE

in 5 days
View Details
NAICS: 339112
New
Federal
6515--Full Body Phototherapy
Solicitation # 36C24427Q0046
The Department of Veterans Affairs is conducting market research through a Sources Sought Notice to identify qualified sources for the one-time acquisition of one full body clinical phototherapy cabinet for the Wilmington VA Medical Center in Delaware. The equipment is intended for treating dermatologic conditions such as psoriasis, vitiligo, and eczema. Key technical requirements include a minimum operational lifespan of five years, a minimum one-year manufacturer service warranty, and the ability to support narrowband UVB, UVA, and combination therapies. The unit must feature forty-eight high-intensity six-foot ultraviolet lamps, an integrated dosimetry system, a touchscreen interface, and a temperature-management system with patient-controlled cooling. Additionally, the cabinet must be wheelchair accessible, include ultraviolet-transmitting acrylic shields, and maintain treatment history locally without requiring connection to the VA network. Vendors must also offer yearly maintenance services as part of their commercial catalog. This notice is for market research purposes only and does not constitute a binding offer or a formal solicitation. Interested respondents must submit their company details, SAM UEI number, business size classification, and any existing government contract vehicles to the designated point of contact by 6:00 am ET on November 10, 2026. The acquisition falls under NAICS code 339112 with a size standard of 1,000 employees. Small businesses must demonstrate compliance with the nonmanufacturer rule and provide a letter of authorization from the original equipment manufacturer if acting as a distributor. Large businesses are required to disclose any designated distributors. Responses should include capability materials such as brochures or hyperlinks to help the government determine the technical capabilities of the proposed equipment.
Surgical and Medical Instrument Manufacturing

POSTED

about 17 hours ago

DEADLINE

in 11 days
View Details
NAICS: 561730
New
Federal
S218--Snow Removal Services Wilmington VAMC
Solicitation # 36C24427Q0O12
Solicitation 36C24427Q0012 is a combined synopsis and request for quote for snow removal and deicing services at the Wilmington VAMC in Delaware. This is a five-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an anticipated period of performance from December 1, 2026, through November 30, 2031. The contract has a minimum guarantee of 5,000 dollars and an estimated maximum value of 500,000 dollars, with funds obligated via individual task orders. The procurement is a total set-aside for certified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 561730. The scope of work includes clearing all levels of a multi-level parking garage, stairwells, entrances, and exposed ramps, with a requirement that all areas be cleared by 6:00 AM EST following overnight snowfall. Specific chemical restrictions are in place, prohibiting rock salt in the garage and requiring the use of garage-friendly chemicals such as sodium acetate, potassium acetate, or calcium magnesium acetate. The contractor must provide an on-site supervisor for every operation and ensure personnel wear OSHA-required PPE and high-visibility vests. Performance will be evaluated based on a Quality Assurance Surveillance Plan, and the award will be based on a comparative evaluation of technical capability and past performance, as well as price. Offerors must be registered in the System for Award Management and submit their quotes via email to the designated contract specialist. Submissions must include a technical document not exceeding 20 pages, firm fixed pricing for all line items, and three examples of past performance for similarly scoped work. Invoices are to be submitted electronically in arrears upon job completion and are due within 30 days. Compliance with applicable wage and hour laws and limitations on subcontracting are mandatory for the prime contractor.
Landscaping Services

POSTED

3 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS