Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on November 1, 2004. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C -- A&E Design Services - New World Mining District

Awarded
R1-11-4-18Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 7 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 10 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Custer Gallatin National Forest is seeking a professional civil engineering firm to provide as-needed services for response and restoration actions at the New World Mine District in Cooke City, Montana. The contract spans a one-year base period with options to renew for up to four additional years. Financial terms include a maximum order amount of 900,000 dollars per contract period, with individual task orders ranging from 2,500 dollars to 900,000 dollars. A guaranteed minimum of 5,000 dollars is provided for the base period only. The scope of work involves historical mine site impact analysis, including geohydrology, toxicology, and surface water studies, following the National Contingency Plan. The contractor is responsible for the entire project lifecycle, from site investigation and characterization to the development of construction bid packages and post-construction oversight. Key requirements include a project manager with at least ten years of experience in mining reclamation and CERCLA actions, a licensed Professional Engineer in Montana, and mandatory 40-hour Hazardous Waste Site Operations training for all field personnel. Evaluation is based on technical knowledge, previous performance, and specific expertise in high-altitude mining reclamation and regional environmental laws.

General Info

Contract Value

$0

NAICS

541330 - Engineering Services

Place of Performance

MT

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Custer Gallatin National Forest
Contacts1 person available
OfficeBOZEMAN, MT, 59715, USA
Office AddressBOZEMAN, MT, 59715, USA
Contacts
William M PfeiferContracting Officer

Full Description

Show more
The Gallatin NF intends to contract for Professional Civil Engineering Services on an as needed basis for a one-year period with options to renew for up to four additional years. Work under this contract will be subject to satisfactory negotiation of individual task orders. The price of any single task order shall be at least $2,500, but shall not exceed $900,000. The maximum order amount for each contract period (base year and each option year) shall be $900,000. The guaranteed minimum order shall be $5,000 for the base period only. There shall be no guaranteed minimum for the options periods, if exercised. Task orders could include performance of any of the following services:Complete various evaluations, studies, reports, and response actions as specified in the National Contingency Plan (NCP) found in 40 CFR 300. Under this activity area, the Contractor will be requested to complete work in support of response and restoration actions. Projects will be located at the New World Mine District, Cooke City, MT. The work site is in a remote area. This work will involve historical mine site impact analysis which include issues concerning geohydrology, geophysical, hydrogeology, geochemical, toxicology and surface water at the New World Mining District. Contractor is expected to be able to complete all needed work from the site investigation phase to development of construction bid package, construction oversight, and post-construction requirements. Architect/Engineer firms which meet the requirements described in this announcement are invited to submit: 1) a Standard Form 254, Architect-Engineer and Related Services Questionnaire; and 2) a Standard Form 255, Architect-Engineer and Related Services Questionnaire for Specific Project, to the procurement office shown below. Respondents should include the following specific information: (1) Demonstrated efficiency of firm's streamlined organization (mix of core projects staff including licenses; (2) Access to various specialist(s) on an as needed basis; (3) Location of project management personnel; (4) Knowledge of the New World Mining District and the geology, hydrogeology, and high altitude reclamation concerns; (5) Specific work experience in high altitude mining reclamation projects; and (6) Working knowledge of Wyoming and Montana state water quality, waste disposal and appropriate environmental laws. Additional information is in R1-11-4-18 (3 pages), which is a separate document with this notice. Evaluation will be based on the quality, as demonstrated by sound technical knowledge and judgment, and timeliness of performance under previous contracts. References with telephone numbers must be provided. Interest and qualified firms are invited to submit two copies of completed SF-254 and SF-255 to this office no later than 3:30 P.M., MST, January 19, 2004. Only firms responding by this time and date will be considered for selection. This is not a Request for Proposal. Any questions, as well as submittals, should be addressed to the Contracting Officer, William M. Pfeifer, at the Gallatin NF, PO Box 130, Bozeman, MT 59771 or by calling at +1 (555) 000-0000. R1-11-4-18 A&E PROFESSIONAL CIVIL ENGINEERING SERVICES New World Mining District -- Response/Restoration Project The intent of this contract is to secure professional services of one Contractor to provide services for the following activity areas: Complete various evaluations, studies, reports, and response actions as specified in the National Contingency Plan (NCP) found in 40 CFR 300. Under this activity area, the Contractor will be requested to complete work in support of response and restoration actions. Projects will be located at the New World Mine District, Cooke City, MT. The work site is in a remote area. This work will involve historical mine site impact analysis which include issues concerning geohydrology, geophysical, hydrogeology, geochemical, toxicology and surface water at the New World Mining District. Contractor is expected to be able to complete all needed work from the site investigation phase to development of construction bid package, construction oversight, and post-construction requirements. All personnel for all activity areas who will physically work on a site shall be certified as having received at a minimum the 40-hour Hazardous Waste Site Operations training, in compliance with OSHA Regulation 29 CFR 1910.120. All personnel who will physically work on a site under this activity shall be certified as having received the 40-hour Hazardous Waste Site Operations training, in compliance with OSHA Regulation 29 CFR 1910.120 and are current on the certification. Licensed Professional Engineer in the State of Montana will be required for EE/CA work, construction design, and technical assistance during construction work phases. Project manager will be an experienced senior level person with at least ten (10) years experience in mining reclamation, groundwater and surface water reclamation, and Comprehensive Environmental Response, Compensation and Liabilities Act actions. Other selection criteria will be evaluated concerning streamline efficient organization (mix of core project staff including licenses); access to specialist on an as needed basis; location of project management personnel; knowledge of the New World Mining District and the geology, hydrogeology and high altitude reclamation concerns; specific work experience in high altitude mining reclamation projects; and working knowledge of Wyoming and Montana state water quality, waste disposal and appropriate environmental laws. Projects will be negotiated prior to starting work and will be on an individual order basis for the period March 1, 2004, through March 1, 2005, with options to extend the services for up to four additional 12-month periods. SCOPE-OF-WORK The work will include investigations and studies in support of response and restoration actions at the New World Mining District site. The contractor will be expected to be familiar with all phases of time-critical and non-time critical removal actions as described in 40 CFR 300. The types of work most likely to be ordered include the completion of site investigation and characterization studies, Engineering Evaluation/Cost Analysis (EE/CA), continuing water quality and vegetation monitoring, and construction design and support activities. Site Investigation and Characterization The contractor will be expected to perform field sampling to determine the level and extent of contamination and then, identify contamination pathways and targets at risk. The contractor is expected to be familiar with EPA protocol, Quality Assurance/Quality Control (QA/QC) requirements, and other applicable sampling requirements needed to produce the proper level of data quality. The contractor will be expected to complete Sampling and Analysis Plans (SAP) and data quality objectives (DQOs) that will be reviewed and approved by the Forest Service and EPA. The Contractor shall assume financial responsibility for re-sampling if data is unusable because of identified problems with sampling techniques, handling or shipping problems, sampling requirements (insufficient sample material collected, inappropriate sample preservation, inappropriate sample location), laboratory error or laboratory contamination. Engineering Evaluation/Cost Analysis (EE/CA) The objective of the EE/CA is to present a preferred response action for a site. The contractor is expected to be familiar with current technologies suitable for dealing with waste rock dumps, mill tailings, and other mine-related wastes. In particular, the contractor is expected to have experience and be familiar with containment design, modeling of leachate quantities through various containment designs, and related reclamation practices. We expect the EE/CAs to be focused documents that evaluate in-depth a limited number of alternatives. The streamlined risk assessments will include no more information than is needed to show a risk exists and a response action is justified. In addition, the contractor needs to be familiar with Applicable or Relevant and Appropriate Requirements (ARARs) for each project and how to evaluate whether they need to be considered and then, if the proposed response action will meet them. Construction Design and Support The contractor will be expected to design a response action at a site. This task will require the contractor to complete engineering plans and specifications that are suitable for bid advertisement. The contractor will be expected to complete a Quality Control/Quality Assurance (QA/QC) plan, if needed, for the construction work. The contractor may also be requested to review bid documents and construction submittals; and complete a final construction report, post construction monitoring plan, and an operation and maintenance plan. Timeframes Tasks associated with this activity are, on the average, expected to be completed within the following timeframes: Site Characterization Studies - 3 months EE/CAs - 6 months Draft without preferred alternative - 4 months Work with Forest Service to develop preferred alternative - 1 month Complete final - 1 month Designs completed - 4 months Submit 30% design - 1 month Submit 90% design - 2 months Submit final design - 1 month QA/AC plan for construction - 1 month However, specific timeframes for these tasks will be negotiated. The Forest Service will generally return comments to the contractor within two weeks of receipt of a document. The contractor will be responsible for incorporating all comments or explaining why a comment was not incorporated. Other Tasks Other tasks involve work in support of natural resource damage assessments, removal/remedial site evaluations, community relations (plans), action memorandums, serving as an on-site inspector during construction, inventory of suspected CERCLA sites, water quality and vegetation monitoring and reporting, and other related studies and field work. Timeframes for these tasks will be negotiated. All Tasks For all work ordered under this activity, the contractor will be expected to be familiar with affected and interested State agencies and laws/rules. The contractor is expected to be familiar with applicable federal laws/regulations and the latest EPA guidance for any work requested under this activity. The contractor is expected to attend, participate, and possibly give presentations at internal and public meetings, when requested. All personnel who will physically work on a site under this activity shall be certified as having received the 40-hour Hazardous Waste Site Operations training, in compliance with OSHA Regulation 29 CFR 1910.120 and are current on the certification. Licensed Professional Engineer in the State of Montana will be required for EE/CA work, construction design, and technical assistance during construction work phases. A project safety plan will be submitted for the project and all appropriate personal protective equipment and safety equipment, as outlined in the plan, shall be provided. Sampling and Analysis plans covering the project shall be prepared and submitted for approval. Generally about 10 copies of documents will be requested.

More opportunities from Department Of Agriculture → Custer Gallatin National Forest

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS